Hewlett Packard Enterprise

Address(es)
  • 8000 Foothills Blvd.
    Roseville 95747
    CA
    United States of America

Website Not available
Status

MEMBER

Acceptance date 2019-08-14

Further information

Stage

Country

Name

2

United States of America

2

United States of America

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

5.2 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.3 – TEST FOR HYDROSCOPIC MATERIALS5.4.1.4; 6.3.2; 9.0; ANNEX B.2.6 – TEMPERATURE MEASUREMENTS5.4.9 – ELECTRIC STRENGTH TESTS5.5.2.2 – STORED DISCHARGE ON CAPACITORS5.6.6.2 – RESISTANCE OF PROTECTIVE CONDUCTORS AND TERMINATIONS 6.2.2 – ELECTRICAL POWER SOURCES (PS) MEASUREMENTS FOR CLASSIFICATION6.2.3.2 - DETERMINATION OF POTENTIAL IGNITION SOURCES (RESISTIVE PIS)6.4.8.3.3, S.2 – TOP OPENINGS AND TOP OPENING PROPERTIES6.4.8.3.4, S.3 – BOTTOM OPENINGS AND BOTTOM OPENING PROPERTIES6.4.8.4, S.2 – FIRE ENCLOSURE/FIRE BARRIER INTEGRITYANNEX B.2.5 – INPUT TESTANNEX B.3 – SIMULATED ABNORMAL OPERATION CONDITION TESTSANNEX B.4 – SIMULATED SINGLE FAULT CONDITION TESTSANNEX Q.1 – CIRCUITS INTENDED FOR INTERCONNECTION WITH BUILDING WIRING (LPS)4.4.3.2; ANNEX T.2, T.3, T.5 – STEADY FORCE TEST4.4.3.4; ANNEX T.6 – IMPACT TESTS4.4.3.3; ANNEX T.7 – DROP TESTS4.4.3.8; ANNEX T.8 – STRESS RELIEF TESTS4.1.15, ANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGS5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.5.2.2 – CAPACITOR DISCHARGE AFTER DISCONNECTIN OF A CONNECTOR5.7 PROSPECTIVE TOUCH VOLTAGE, TOUCH CURRENT AND PROSPECTIVE CONDUCTOR CURRENT 5.7.8 – SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS8.6.2 – STATIC STABILITY8.6.3.2 – RELOCATION STABILITY TEST8.6.5 – HORIZONTAL FORCE TEST8.7 – WALL, CEILING, OR OTHER STRUCTURE MOUNTING TESTS8.8 – HANDLE STRENGTHANNEX G.5.4.6 - LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSANNEX G.7.3.2 – CORD STRAIN RELIEF TESTANNEX M.3.2 – PROTECTION CIRCUITS FOR BATTERIES
2022-09-08

ITAV

5.2,5.7 - CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.4,ANNEX B.2 - MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.8 - DETERMINATION OF WORKING VOLTAGE5.4.8 - HUMIDITY CONDITIONING5.4.9 - ELECTRIC STRENGTH TEST5.5.2.2 - SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6.2 (a) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 - PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.7 - SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS6.2.2.2,6.2.2.3 - POWER MEASUREMENTS6.2.3.2 - RESISTIVE PIS DETERMINATION6.3 - NORMAL OPERATING CONDITIONS TEMPERATURE TEST6.4.3,ANNEX B.4 - REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS6.4.8.3.3,ANNEX S.2 - TOP OPENINGS AND TOP OPENING PROPERTIES6.4.8.3.4,ANNEX S.3 - BOTTOM OPENINGS AND BOTTOM OPENING PROPERTIES6.4.7.2, 6.4.8.4 ANNEX S.2 - FIRE ENCLOSURE/FIRE BARRIER INTEGRITY TEST6.6 - TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION8.6.2 - STATIC STABILITY8.6.3 - RELOCATION STABILITY TEST8.6.3.2 - HORIZONTAL FORCE TEST8.7 - WALL OR CEILING MOUNTING TESTS8.8 - HANDLE STRENGTHANNEX B.2.5 - INPUT TEST: SINGLE PHASEANNEX B.2.6 - NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 - SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4 - SIMULATED SINGLE FAULT CONDITIONS6.4.2, ANNEX B.4 - SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITIONANNEX F.3.10 - TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.4.6 - LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSANNEX G.7.3.2 - STRAIN RELIEF TESTANNEX M.3.2 - PROTECTION CIRCUITS FOR BATTERIESANNEX Q.1 - LIMITED POWER SOURCEANNEX T.2 (5.4.2.6, 5.4.3.2, G.15.3.6) - STEADY FORCE TEST, 10 NANNEX T.3 (4.4.4.2, 4.4.4.5, 5.3.2.3, G.15.3.6, U.3) - STEADY FORCE TEST, 30 NANNEX T.4 (4.4.4.2) - STEADY FORCE TEST, 100 NANNEX T.4 (4.4.4.2) - STEADY FORCE TEST, 250 NANNEX T.6 (4.4.4.4, 8.10.4) - ENCLOSURE IMPACT TESTANNEX T.7 (4.4.4.3) - DROP TESTANNEX T.8 (4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4) - STRESS RELIEF TEST
2019-08-14

OFF

1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE-PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5,2.1.2,1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.1.1.7 - CAPACITANCE DISCHARGE TEST2.1.1.8 - ENERGY HAZARD MEASUREMENTS - DC MAINS SUPPLIES2.2.2,2.2.3,2.2.4,PART 22 6.1 - SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS2.4.1,2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4,2.6.1 - PROTECTIVE BONDING TEST I2.9.1,2.9.2,5.2.2 - HUMIDITY TEST3.2.6,4.2.1,4.2.7 - STRAIN RELIEF TEST4.1 - STABILITY TESTS4.2.1-4.2.4 - STEADY FORCE TESTS4.2.5,4.2.1,PART 22 10.2 - IMPACT TEST4.2.6,4.2.1 - DROP TEST4.2.7,4.2.1 - STRESS RELIEF TEST4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.2 - KNOB PULL/HANDLE LOADING TEST4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST4.3.8 - BATTERY TESTS4.5.1,1.4.12,1.4.13 - HEATING TEST5.1,ANNEX D - TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.1.8.1 - LIMITATION OF THE TOUCH CURRENT TO A TELECOMMUNICATIONS NETWORK AND A CABLE DISTRIBUTION SYSTEM (SINGLE-PHASE)5.2.2 - ELECTRIC STRENGTH TEST5.3.1,5.3.4,5.3.7 - COMPONENT FAILURE TEST5.3.1-5.3.9 - ABNORMAL OPERATION TESTS5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST6.1.2 - REQUIREMENTS FOR SEPARATION BETWEEN TELECOMMUNICATION NETWORK FROM EARTH6.2.2 (6.2.2.1) - ELECTRIC STRENGTH TEST PROCEDURE - IMPULSE TEST6.2.2 (6.2.2.2) - ELECTRIC STRENGTH TEST PROCEDURE - STEADY-STATE TESTANNEX B.7 - LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2019-08-14

OFF

1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE-PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5,2.1.2,1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.1.1.7 - CAPACITANCE DISCHARGE TEST2.1.1.8 - ENERGY HAZARD MEASUREMENTS - DC MAINS SUPPLIES2.2.2,2.2.3,2.2.4,PART 22 6.1 - SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS2.4.1,2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4,2.6.1 - PROTECTIVE BONDING TEST I2.9.1,2.9.2,5.2.2 - HUMIDITY TEST3.2.6,4.2.1,4.2.7 - STRAIN RELIEF TEST4.1 - STABILITY TESTS4.2.1-4.2.4 - STEADY FORCE TESTS4.2.5,4.2.1,PART 22 10.2 - IMPACT TEST4.2.6,4.2.1 - DROP TEST4.2.7,4.2.1 - STRESS RELIEF TEST4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.2 - KNOB PULL/HANDLE LOADING TEST4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST4.3.8 - BATTERY TESTS4.5.1,1.4.12,1.4.13 - HEATING TEST5.1,ANNEX D - TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.1.8.1 - LIMITATION OF THE TOUCH CURRENT TO A TELECOMMUNICATIONS NETWORK AND A CABLE DISTRIBUTION SYSTEM (SINGLE-PHASE)5.2.2 - ELECTRIC STRENGTH TEST5.3.1,5.3.4,5.3.7 - COMPONENT FAILURE TEST5.3.1-5.3.9 - ABNORMAL OPERATION TESTS5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST6.1.2 - REQUIREMENTS FOR SEPARATION BETWEEN TELECOMMUNICATION NETWORK FROM EARTH6.2.2 (6.2.2.1) - ELECTRIC STRENGTH TEST PROCEDURE - IMPULSE TEST6.2.2 (6.2.2.2) - ELECTRIC STRENGTH TEST PROCEDURE - STEADY-STATE TESTANNEX B.7 - LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2019-08-14

OFF

1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE-PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5,2.1.2,1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.1.1.7 - CAPACITANCE DISCHARGE TEST2.1.1.8 - ENERGY HAZARD MEASUREMENTS - DC MAINS SUPPLIES2.2.2,2.2.3,2.2.4,PART 22 6.1 - SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS2.4.1,2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4,2.6.1 - PROTECTIVE BONDING TEST I2.9.1,2.9.2,5.2.2 - HUMIDITY TEST3.2.6,4.2.1,4.2.7 - STRAIN RELIEF TEST4.1 - STABILITY TESTS4.2.1-4.2.4 - STEADY FORCE TESTS4.2.5,4.2.1,PART 22 10.2 - IMPACT TEST4.2.6,4.2.1 - DROP TEST4.2.7,4.2.1 - STRESS RELIEF TEST4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.2 - KNOB PULL/HANDLE LOADING TEST4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST4.3.8 - BATTERY TESTS4.5.1,1.4.12,1.4.13 - HEATING TEST5.1,ANNEX D - TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.1.8.1 - LIMITATION OF THE TOUCH CURRENT TO A TELECOMMUNICATIONS NETWORK AND A CABLE DISTRIBUTION SYSTEM (SINGLE-PHASE)5.2.2 - ELECTRIC STRENGTH TEST5.3.1,5.3.4,5.3.7 - COMPONENT FAILURE TEST5.3.1-5.3.9 - ABNORMAL OPERATION TESTS5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST6.1.2 - REQUIREMENTS FOR SEPARATION BETWEEN TELECOMMUNICATION NETWORK FROM EARTH6.2.2 (6.2.2.1) - ELECTRIC STRENGTH TEST PROCEDURE - IMPULSE TEST6.2.2 (6.2.2.2) - ELECTRIC STRENGTH TEST PROCEDURE - STEADY-STATE TESTANNEX B.7 - LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2019-08-14