HEFEI LCFC INFORMATION TECHNOLOGY CO LTD

Address(es)
  • 230601.Anhui.Hefei.Lenovo science and technology harbor in Xiyou Road and Guanhai Road.Hefei Economic and Technological Development Area..
    China

Website Not available
Status

MEMBER

Acceptance date 2020-11-19

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, ANNEX T.4 – STEADY FORCE TEST, 100 N4.4.3.3, ANNEX T.7 – DROP TEST4.4.3.4, ANNEX T.6 – IMPACT TEST4.4.3.7, ANNEX T.8 – STRESS RELIEF TEST5.4.1.3 – TEST FOR HYGROSCOPIC MATERIALS5.4.4.6.2 – SEPARABLE THIN SHEET MATERIAL5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS – SINGLE-PHASE EQUIPMENT ON TN OR TT SYSTEMB.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT6.2.2.2, 6.2.2.3 – POWER MEASUREMENTSB.2.5 – INPUT TEST: SINGLE PHASEB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSM.3.2 – PROTECTION CIRCUITS FOR BATTERIESM.4.2 – SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDSM.4.4, ANNEX T.7 – DROP TEST OF EQUIPMENT CONTAINING A SECONDARY LITHIUM BATTERYP.4 Metallized coatings and adhesives securing partsANNEX Q.1 – LIMITED POWER SOURCE
2020-10-20

ITAV

4.4.4.2, ANNEX T.4 – STEADY FORCE TEST, 100 N4.4.4.3, ANNEX T.7 – DROP TEST4.4.4.4, ANNEX T.6 – IMPACT TEST4.4.4.7, ANNEX T.8 – STRESS RELIEF TEST5.4.1.3 – TEST FOR HYGROSCOPIC MATERIALS5.4.1.4, Annex B.2 – MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.4.6.2 – SEPARABLE THIN SHEET MATERIAL5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS6.3 – NORMAL OPERATING CONDITIONS TEMPERATURE TESTB.2.5 – INPUT TEST: SINGLE PHASEB.2.6 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSANNEX M.3.2 – PROTECTION CIRCUITS FOR BATTERIESANNEX M.4.2 – SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDSANNEX M.4.4, ANNEX T.7 – DROP TEST OF EQUIPMENT CONTAINING A SECONDARY LITHIUM BATTERYP.4 Metallized coatings and adhesives securing partsANNEX Q.1 – LIMITED POWER SOURCE
2020-10-20

ITAV

PART 3 – 5.1 POWER TRANSFER USING ES1 OR ES2 VOLTAGES, GENERAL REQUIREMENTSIEC 62368-3 - Part 3 - 5.3.2 DC power transfer interconnection to other equipmentIEC 62368-3, 5.4.1 Requirement for the PSEPart 3 (IEC 62368-3) - 5.4.2 Requirement for the PD
2020-10-20

OFF

1.6.2 - Input Test: Single-Phase1.7.11 - DURABILITY OF MARKING TEST2.5 ‑ Limited Power Source Measurements2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST4.1 - STABILITY TESTS4.2.1 - 4.2.4 – Steady Force Tests4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.2.6, 4.2.1 ‑ Drop Test4.2.7, 4.2.1 ‑ Stress Relief Test4.3.8 ‑ Battery Tests4.3.8 ‑ LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.5.1, 1.4.12, 1.4.13 ‑ Heating Test4.6.5 ‑ Adhesives for constructional purposes5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1 5.3.9 ABNORMAL OPERATION TESTS
2020-10-20

OFF

1.6.2 - Input Test: Single-Phase1.7.11 - DURABILITY OF MARKING TEST2.5 ‑ Limited Power Source Measurements2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST4.1 - STABILITY TESTS4.2.1 - 4.2.4 – Steady Force Tests4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.2.6, 4.2.1 ‑ Drop Test4.2.7, 4.2.1 ‑ Stress Relief Test4.3.8 ‑ Battery Tests4.3.8 ‑ LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.5.1, 1.4.12, 1.4.13 ‑ Heating Test4.6.5 ‑ Adhesives for constructional purposes5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1 5.3.9 ABNORMAL OPERATION TESTS
2020-10-20

OFF

1.6.2 - Input Test: Single-Phase1.7.11 - DURABILITY OF MARKING TEST2.5 ‑ Limited Power Source Measurements2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST4.1 - STABILITY TESTS4.2.1 - 4.2.4 – Steady Force Tests4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.2.6, 4.2.1 ‑ Drop Test4.2.7, 4.2.1 ‑ Stress Relief Test4.3.8 ‑ Battery Tests4.3.8 ‑ LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.5.1, 1.4.12, 1.4.13 ‑ Heating Test4.6.5 ‑ Adhesives for constructional purposes5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1 5.3.9 ABNORMAL OPERATION TESTS
2020-10-20