Hangzhou Boco Electronics Co., Ltd

Address(es)
  • 11th Floor, Block A, Kechuang Building, No. 611, Dongguan Road, Puyan Street
    Hangzhou 310051
    Binjiang Distric
    China

Website Not available
Status

MEMBER

Acceptance date 2023-11-10

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, T.5 – STEADY FORCE TEST, 250 N4.4.3.4, T.6 - IMPACT TEST4.4.4.7, ANNEX T.8 - STRESS RELIEF TEST5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.3 – TEST FOR HYGROSCOPIC MATERIALS5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.4.6.2 – SEPARABLE THIN SHEET MATERIAL5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.5.2.2 – CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS – SINGLE-PHASE EQUIPMENT ON TN OR TT SYSTEMB.2.5 – INPUT TEST: SINGLE PHASEB.2.6, 5.4.1.4, 6.3, 9.3, B.1.5 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSG.5.3.3 – TRANSFORMER OVERLOAD
2023-11-10

ITAV

4.4.4.2, T.5 – STEADY FORCE TEST, 250 N4.4.4.4, T.6 - IMPACT TEST4.4.4.7, ANNEX T.8 - STRESS RELIEF TEST5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.3 – TEST FOR HYGROSCOPIC MATERIALS5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.4.6.2 – SEPARABLE THIN SHEET MATERIAL5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.5.2.2 – SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS – SINGLE-PHASE EQUIPMENT ON TN OR TT SYSTEMB.2.5 – INPUT TEST: SINGLE PHASEB.2.6, 5.4.1.4, 6.3, 9.2, B.1.6 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSG.5.3.3 – TRANSFORMER OVERLOAD
2023-11-10