GUTOR Electronic LLC

Address(es)
  • Hardstrasse 72-74
    CH- 5430 Wettingen
    Switzerland

Website https://gutor.com/
Status

MEMBER

Acceptance date 2024-01-05

Further information

Stage

Country

Name

1

Slovenia

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

OFF

5.2.2.1: Clearance and creepage distances5.2.2.2: Non-accessibility test, including energy hazard test after disconnection*5.2.2.4.2.2: Steady force test 30N*5.2.2.4.2.2: Steady force test 250N*5.2.2.4.3: Impact test*5.2.3.4: AC or DC voltage test (dielectric strength test)5.2.3.6: Protective impedance test5.2.3.7: Touch current measurement test*5.2.3.8: Capacitor discharge test5.2.3.9: Limited power source, test including energy hazards test5.2.3.10: Temperature test5.2.3.101: Backfeed protection test5.2.3.11, 5.2.4.3: Protective equipotential bonding (except SCCR)5.2.3.102: Input current5.2.3.104: Transformer protection5.2.4.4: Output short-circuit test5.2.3.105: Unsynchronised load transfer test5.2.4.5: Output overload test5.2.4.6: Breakdown of components test5.2.4.7: PWB short-circuit test5.2.4.8: Loss of phase test5.2.4.9.2: Inoperative blower test5.2.4.9.3: Clogged filter test5.2.6.3.1: Dry heat test5.2.6.3.2: Damp heat test
2024-01-05

OFF

5.2.2.1: Clearance and creepage distances5.2.2.2: Non-accessibility test, including energy hazard test after disconnection*5.2.2.4.2.2: Steady force test 30N*5.2.2.4.2.2: Steady force test 250N*5.2.2.4.3: Impact test*5.2.3.4: AC or DC voltage test (dielectric strength test)5.2.3.6: Protective impedance test5.2.3.7: Touch current measurement test*5.2.3.8: Capacitor discharge test5.2.3.9: Limited power source, test including energy hazards test5.2.3.10: Temperature test5.2.3.101: Backfeed protection test5.2.3.11, 5.2.4.3: Protective equipotential bonding (except SCCR)5.2.3.102: Input current5.2.3.104: Transformer protection5.2.4.4: Output short-circuit test5.2.3.105: Unsynchronised load transfer test5.2.4.5: Output overload test5.2.4.6: Breakdown of components test5.2.4.7: PWB short-circuit test5.2.4.8: Loss of phase test5.2.4.9.2: Inoperative blower test5.2.4.9.3: Clogged filter test5.2.6.3.1: Dry heat test5.2.6.3.2: Damp heat test
2024-01-05

OFF

Accepted clauses: 4.6, 5.1.1, 5.2.1, 5.2.3, 5.2.5, 5.7, 7.7, 8.3
2024-01-05

OFF

Accepted clauses: 4.6, 5.1.1, 5.2.1, 5.2.3, 5.2.5, 5.7, 7.7, 8.3
2024-01-05