CIMBALI GROUP S.P.A.
CIMBALI GROUP S.P.A.
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2014-10-15 |
Further information
Stage | Country | Name |
---|---|---|
2 | Denmark |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
HOUS | IEC 60335-1:2020 | Clause 8 PROTECTION AGAINST ACCESS TO LIVE PARTSClause 10 Power Input And CurrentClause 11 HeatingClause 13.3 / 16.3 Electric Strength TestClause 13.2 / 16.2 Leakage Current TestClause 15 Moisture Resistance, Only Limited to Cl. 15.2 and 15.3Clause 17 Overload Protection of Transformers and Associated CircuitsClause 19 Abnormal Operation, Excluding 19.11.4Clause 20 Stability and Mechanical HazardsClause 22 Detachable Parts. Push/Pull TestClause 22 Water Pressure ApparatusClause 23 Internal WiringClause 24 ComponentsClause 25 Supply Connection And External Flexible CordsClause 26 Terminals For External ConductorsClause 27.5 Provision For EarthingClause 28 Screws And ConnectionsClause 29 Clearance And Creepage MeasurementClause 30 Resistance To Heat And Fire, Excluding Annex EClause 31 Resistance To RustingClause 32 Radiation, Toxicity And Similar Hazards | 2023-04-27 | |
HOUS | IEC 60335-1:2010 | Clause 8 PROTECTION AGAINST ACCESS TO LIVE PARTSClause 10 Power Input And CurrentClause 11 HeatingClause 13.3 / 16.3 Electric Strength TestClause 13.2 / 16.2 Leakage Current TestClause 15 Moisture Resistance, Only Limited to Cl. 15.2 and 15.3Clause 17 Overload Protection of Transformers and Associated CircuitsClause 19 Abnormal Operation, Excluding 19.11.4Clause 20 Stability and Mechanical HazardsClause 22 Detachable Parts. Push/Pull TestClause 22 Water Pressure ApparatusClause 23 Internal WiringClause 24 ComponentsClause 25 Supply Connection And External Flexible CordsClause 26 Terminals For External ConductorsClause 27.5 Provision For EarthingClause 28 Screws And ConnectionsClause 29 Clearance And Creepage MeasurementClause 30 Resistance To Heat And Fire, Excluding Annex EClause 31 Resistance To RustingClause 32 Radiation, Toxicity And Similar Hazards | 2019-02-20 | |
HOUS | IEC 60335-1:2010/AMD1:2013 | Clause 8 PROTECTION AGAINST ACCESS TO LIVE PARTSClause 10 Power Input And CurrentClause 11 HeatingClause 13.3 / 16.3 Electric Strength TestClause 13.2 / 16.2 Leakage Current TestClause 15 Moisture Resistance, Only Limited to Cl. 15.2 and 15.3Clause 17 Overload Protection of Transformers and Associated CircuitsClause 19 Abnormal Operation, Excluding 19.11.4Clause 20 Stability and Mechanical HazardsClause 22 Detachable Parts. Push/Pull TestClause 22 Water Pressure ApparatusClause 23 Internal WiringClause 24 ComponentsClause 25 Supply Connection And External Flexible CordsClause 26 Terminals For External ConductorsClause 27.5 Provision For EarthingClause 28 Screws And ConnectionsClause 29 Clearance And Creepage MeasurementClause 30 Resistance To Heat And Fire, Excluding Annex EClause 31 Resistance To RustingClause 32 Radiation, Toxicity And Similar Hazards | 2019-02-20 | |
HOUS | IEC 60335-1:2010/AMD2:2016 | Clause 8 PROTECTION AGAINST ACCESS TO LIVE PARTSClause 10 Power Input And CurrentClause 11 HeatingClause 13.3 / 16.3 Electric Strength TestClause 13.2 / 16.2 Leakage Current TestClause 15 Moisture Resistance, Only Limited to Cl. 15.2 and 15.3Clause 17 Overload Protection of Transformers and Associated CircuitsClause 19 Abnormal Operation, Excluding 19.11.4Clause 20 Stability and Mechanical HazardsClause 22 Detachable Parts. Push/Pull TestClause 22 Water Pressure ApparatusClause 23 Internal WiringClause 24 ComponentsClause 25 Supply Connection And External Flexible CordsClause 26 Terminals For External ConductorsClause 27.5 Provision For EarthingClause 28 Screws And ConnectionsClause 29 Clearance And Creepage MeasurementClause 30 Resistance To Heat And Fire, Excluding Annex EClause 31 Resistance To RustingClause 32 Radiation, Toxicity And Similar Hazards | 2019-02-20 | |
HOUS | IEC 60335-2-14:2016 | Clause 8 PROTECTION AGAINST ACCESS TO LIVE PARTSClause 10 Power Input And CurrentClause 11 HeatingClause 13.3 / 16.3 Electric Strength TestClause 13.2 / 16.2 Leakage Current TestClause 15 Moisture Resistance, Only Limited to Cl. 15.2 and 15.3Clause 17 Overload Protection of Transformers and Associated CircuitsClause 19 Abnormal Operation, Excluding 19.11.4Clause 20 Stability and Mechanical HazardsClause 22 Detachable Parts. Push/Pull TestClause 22 Water Pressure ApparatusClause 23 Internal WiringClause 24 ComponentsClause 25 Supply Connection And External Flexible CordsClause 26 Terminals For External ConductorsClause 27.5 Provision For EarthingClause 28 Screws And ConnectionsClause 29 Clearance And Creepage MeasurementClause 30 Resistance To Heat And Fire, Excluding Annex EClause 31 Resistance To RustingClause 32 Radiation, Toxicity And Similar Hazards | 2019-02-20 | |
HOUS | IEC 60335-2-14:2016/AMD1:2019 | Clause 8 PROTECTION AGAINST ACCESS TO LIVE PARTSClause 10 Power Input And CurrentClause 11 HeatingClause 13.3 / 16.3 Electric Strength TestClause 13.2 / 16.2 Leakage Current TestClause 15 Moisture Resistance, Only Limited to Cl. 15.2 and 15.3Clause 17 Overload Protection of Transformers and Associated CircuitsClause 19 Abnormal Operation, Excluding 19.11.4Clause 20 Stability and Mechanical HazardsClause 22 Detachable Parts. Push/Pull TestClause 22 Water Pressure ApparatusClause 23 Internal WiringClause 24 ComponentsClause 25 Supply Connection And External Flexible CordsClause 26 Terminals For External ConductorsClause 27.5 Provision For EarthingClause 28 Screws And ConnectionsClause 29 Clearance And Creepage MeasurementClause 30 Resistance To Heat And Fire, Excluding Annex EClause 31 Resistance To RustingClause 32 Radiation, Toxicity And Similar Hazards | 2019-02-20 | |
HOUS | IEC 60335-2-15:2012 | Clause 8 PROTECTION AGAINST ACCESS TO LIVE PARTSClause 10 Power Input And CurrentClause 11 HeatingClause 13.3 / 16.3 Electric Strength TestClause 13.2 / 16.2 Leakage Current TestClause 15 Moisture Resistance, Only Limited to Cl. 15.2 and 15.3Clause 17 Overload Protection of Transformers and Associated CircuitsClause 19 Abnormal Operation, Excluding 19.11.4Clause 20 Stability and Mechanical HazardsClause 22 Detachable Parts. Push/Pull TestClause 22 Water Pressure ApparatusClause 23 Internal WiringClause 24 ComponentsClause 25 Supply Connection And External Flexible CordsClause 26 Terminals For External ConductorsClause 27.5 Provision For EarthingClause 28 Screws And ConnectionsClause 29 Clearance And Creepage MeasurementClause 30 Resistance To Heat And Fire, Excluding Annex EClause 31 Resistance To RustingClause 32 Radiation, Toxicity And Similar Hazards | 2019-02-20 | |
HOUS | IEC 60335-2-15:2012/AMD1:2016 | Clause 8 PROTECTION AGAINST ACCESS TO LIVE PARTSClause 10 Power Input And CurrentClause 11 HeatingClause 13.3 / 16.3 Electric Strength TestClause 13.2 / 16.2 Leakage Current TestClause 15 Moisture Resistance, Only Limited to Cl. 15.2 and 15.3Clause 17 Overload Protection of Transformers and Associated CircuitsClause 19 Abnormal Operation, Excluding 19.11.4Clause 20 Stability and Mechanical HazardsClause 22 Detachable Parts. Push/Pull TestClause 22 Water Pressure ApparatusClause 23 Internal WiringClause 24 ComponentsClause 25 Supply Connection And External Flexible CordsClause 26 Terminals For External ConductorsClause 27.5 Provision For EarthingClause 28 Screws And ConnectionsClause 29 Clearance And Creepage MeasurementClause 30 Resistance To Heat And Fire, Excluding Annex EClause 31 Resistance To RustingClause 32 Radiation, Toxicity And Similar Hazards | 2019-02-20 | |
HOUS | IEC 60335-2-15:2012/AMD2:2018 | Clause 8 PROTECTION AGAINST ACCESS TO LIVE PARTSClause 10 Power Input And CurrentClause 11 HeatingClause 13.3 / 16.3 Electric Strength TestClause 13.2 / 16.2 Leakage Current TestClause 15 Moisture Resistance, Only Limited to Cl. 15.2 and 15.3Clause 17 Overload Protection of Transformers and Associated CircuitsClause 19 Abnormal Operation, Excluding 19.11.4Clause 20 Stability and Mechanical HazardsClause 22 Detachable Parts. Push/Pull TestClause 22 Water Pressure ApparatusClause 23 Internal WiringClause 24 ComponentsClause 25 Supply Connection And External Flexible CordsClause 26 Terminals For External ConductorsClause 27.5 Provision For EarthingClause 28 Screws And ConnectionsClause 29 Clearance And Creepage MeasurementClause 30 Resistance To Heat And Fire, Excluding Annex EClause 31 Resistance To RustingClause 32 Radiation, Toxicity And Similar Hazards | 2019-02-20 | |
HOUS | IEC 60335-2-58:2017 | Clause 8 PROTECTION AGAINST ACCESS TO LIVE PARTSClause 10 PowClause 8 PROTECTION AGAINST ACCESS TO LIVE PARTSClause 10 Power input and currentClause 11 HeatingClause 13.3 / 16.3 ELECTRIC STRENGTH TESTClause 13.2 / 16.2 LEAKAGE CURRENT TESTClause 15 Moisture resistance, only limited to cl. 15.2 and 15.3Clause 17 Overload protection of transformers and associated circuitsClause 19 ABNORMAL OPERATION, excluding 19.11.4Clause 20 Stability and mechanical hazardsClause 22 DETACHABLE PARTS. PUSH/PULL TESTClause 22 Water pressure apparatusClause 23 Internal wiringClause 24 ComponentsClause 25 Supply connection and external flexible cordsClause 26 Terminals for external conductorsClause 27.5 Provision for earthingClause 28 Screws and connectionsClause 29 CLEARANCE AND CREEPAGE MEASUREMENTClause 31 Resistance to rustingClause 32 Radiation, toxicity and similar hazards | 2019-02-20 | |
HOUS | IEC 60335-2-64:2021 | Clause 8 PROTECTION AGAINST ACCESS TO LIVE PARTSClause 10 Power Input And CurrentClause 11 HeatingClause 13.3 / 16.3 Electric Strength TestClause 13.2 / 16.2 Leakage Current TestClause 15 Moisture Resistance, Only Limited to Cl. 15.2 and 15.3Clause 17 Overload Protection of Transformers and Associated CircuitsClause 19 Abnormal Operation, Excluding 19.11.4Clause 20 Stability and Mechanical HazardsClause 22 Detachable Parts. Push/Pull TestClause 22 Water Pressure ApparatusClause 23 Internal WiringClause 24 ComponentsClause 25 Supply Connection And External Flexible CordsClause 26 Terminals For External ConductorsClause 27.5 Provision For EarthingClause 28 Screws And ConnectionsClause 29 Clearance And Creepage MeasurementClause 30 Resistance To Heat And Fire, Excluding Annex EClause 31 Resistance To RustingClause 32 Radiation, Toxicity And Similar Hazards | 2023-04-27 | |
HOUS | IEC 60335-2-64:2002 | Clause 8 PROTECTION AGAINST ACCESS TO LIVE PARTSClause 10 Power Input And CurrentClause 11 HeatingClause 13.3 / 16.3 Electric Strength TestClause 13.2 / 16.2 Leakage Current TestClause 15 Moisture Resistance, Only Limited to Cl. 15.2 and 15.3Clause 17 Overload Protection of Transformers and Associated CircuitsClause 19 Abnormal Operation, Excluding 19.11.4Clause 20 Stability and Mechanical HazardsClause 22 Detachable Parts. Push/Pull TestClause 22 Water Pressure ApparatusClause 23 Internal WiringClause 24 ComponentsClause 25 Supply Connection And External Flexible CordsClause 26 Terminals For External ConductorsClause 27.5 Provision For EarthingClause 28 Screws And ConnectionsClause 29 Clearance And Creepage MeasurementClause 30 Resistance To Heat And Fire, Excluding Annex EClause 31 Resistance To RustingClause 32 Radiation, Toxicity And Similar Hazards | 2019-02-20 | |
HOUS | IEC 60335-2-64:2002/AMD1:2007 | Clause 8 PROTECTION AGAINST ACCESS TO LIVE PARTSClause 10 Power Input And CurrentClause 11 HeatingClause 13.3 / 16.3 Electric Strength TestClause 13.2 / 16.2 Leakage Current TestClause 15 Moisture Resistance, Only Limited to Cl. 15.2 and 15.3Clause 17 Overload Protection of Transformers and Associated CircuitsClause 19 Abnormal Operation, Excluding 19.11.4Clause 20 Stability and Mechanical HazardsClause 22 Detachable Parts. Push/Pull TestClause 22 Water Pressure ApparatusClause 23 Internal WiringClause 24 ComponentsClause 25 Supply Connection And External Flexible CordsClause 26 Terminals For External ConductorsClause 27.5 Provision For EarthingClause 28 Screws And ConnectionsClause 29 Clearance And Creepage MeasurementClause 30 Resistance To Heat And Fire, Excluding Annex EClause 31 Resistance To RustingClause 32 Radiation, Toxicity And Similar Hazards | 2019-02-20 | |
HOUS | IEC 60335-2-64:2002/AMD2:2017 | Clause 8 PROTECTION AGAINST ACCESS TO LIVE PARTSClause 10 Power Input And CurrentClause 11 HeatingClause 13.3 / 16.3 Electric Strength TestClause 13.2 / 16.2 Leakage Current TestClause 15 Moisture Resistance, Only Limited to Cl. 15.2 and 15.3Clause 17 Overload Protection of Transformers and Associated CircuitsClause 19 Abnormal Operation, Excluding 19.11.4Clause 20 Stability and Mechanical HazardsClause 22 Detachable Parts. Push/Pull TestClause 22 Water Pressure ApparatusClause 23 Internal WiringClause 24 ComponentsClause 25 Supply Connection And External Flexible CordsClause 26 Terminals For External ConductorsClause 27.5 Provision For EarthingClause 28 Screws And ConnectionsClause 29 Clearance And Creepage MeasurementClause 30 Resistance To Heat And Fire, Excluding Annex EClause 31 Resistance To RustingClause 32 Radiation, Toxicity And Similar Hazards | 2019-02-20 | |
HOUS | IEC 60335-2-75:2012 | Clause 8 PROTECTION AGAINST ACCESS TO LIVE PARTSClause 10 Power Input And CurrentClause 11 HeatingClause 13.3 / 16.3 Electric Strength TestClause 13.2 / 16.2 Leakage Current TestClause 15 Moisture Resistance, Only Limited to Cl. 15.2 and 15.3Clause 17 Overload Protection of Transformers and Associated CircuitsClause 19 Abnormal Operation, Excluding 19.11.4Clause 20 Stability and Mechanical HazardsClause 22 Detachable Parts. Push/Pull TestClause 22 Water Pressure ApparatusClause 23 Internal WiringClause 24 ComponentsClause 25 Supply Connection And External Flexible CordsClause 26 Terminals For External ConductorsClause 27.5 Provision For EarthingClause 28 Screws And ConnectionsClause 29 Clearance And Creepage MeasurementClause 30 Resistance To Heat And Fire, Excluding Annex EClause 31 Resistance To RustingClause 32 Radiation, Toxicity And Similar Hazards | 2019-02-20 | |
HOUS | IEC 60335-2-75:2012/AMD1:2015 | Clause 8 PROTECTION AGAINST ACCESS TO LIVE PARTSClause 10 Power Input And CurrentClause 11 HeatingClause 13.3 / 16.3 Electric Strength TestClause 13.2 / 16.2 Leakage Current TestClause 15 Moisture Resistance, Only Limited to Cl. 15.2 and 15.3Clause 17 Overload Protection of Transformers and Associated CircuitsClause 19 Abnormal Operation, Excluding 19.11.4Clause 20 Stability and Mechanical HazardsClause 22 Detachable Parts. Push/Pull TestClause 22 Water Pressure ApparatusClause 23 Internal WiringClause 24 ComponentsClause 25 Supply Connection And External Flexible CordsClause 26 Terminals For External ConductorsClause 27.5 Provision For EarthingClause 28 Screws And ConnectionsClause 29 Clearance And Creepage MeasurementClause 30 Resistance To Heat And Fire, Excluding Annex EClause 31 Resistance To RustingClause 32 Radiation, Toxicity And Similar Hazards | 2019-02-20 | |
HOUS | IEC 60335-2-75:2012/AMD2:2018 | Clause 8 PROTECTION AGAINST ACCESS TO LIVE PARTSClause 10 Power Input And CurrentClause 11 HeatingClause 13.3 / 16.3 Electric Strength TestClause 13.2 / 16.2 Leakage Current TestClause 15 Moisture Resistance, Only Limited to Cl. 15.2 and 15.3Clause 17 Overload Protection of Transformers and Associated CircuitsClause 19 Abnormal Operation, Excluding 19.11.4Clause 20 Stability and Mechanical HazardsClause 22 Detachable Parts. Push/Pull TestClause 22 Water Pressure ApparatusClause 23 Internal WiringClause 24 ComponentsClause 25 Supply Connection And External Flexible CordsClause 26 Terminals For External ConductorsClause 27.5 Provision For EarthingClause 28 Screws And ConnectionsClause 29 Clearance And Creepage MeasurementClause 30 Resistance To Heat And Fire, Excluding Annex EClause 31 Resistance To RustingClause 32 Radiation, Toxicity And Similar Hazards | 2019-02-20 | |
HOUS | IEC 60335-2-102:2017 | Clause 8 PROTECTION AGAINST ACCESS TO LIVE PARTSClause 10 Power Input And CurrentClause 11 HeatingClause 13.3 / 16.3 Electric Strength TestClause 13.2 / 16.2 Leakage Current TestClause 15 Moisture Resistance, Only Limited to Cl. 15.2 and 15.3Clause 17 Overload Protection of Transformers and Associated CircuitsClause 19 Abnormal Operation, Excluding 19.11.4Clause 20 Stability and Mechanical HazardsClause 22 Detachable Parts. Push/Pull TestClause 22 Water Pressure ApparatusClause 23 Internal WiringClause 24 ComponentsClause 25 Supply Connection And External Flexible CordsClause 26 Terminals For External ConductorsClause 27.5 Provision For EarthingClause 28 Screws And ConnectionsClause 29 Clearance And Creepage MeasurementClause 30 Resistance To Heat And Fire, Excluding Annex EClause 31 Resistance To RustingClause 32 Radiation, Toxicity And Similar Hazards | 2019-02-20 |