Google LLC

Address(es)
  • 2011 Stierlin Ct
    Mountain View 94043
    CA
    United States of America

Website Not available
Status

MEMBER

Acceptance date 2023-11-08

Further information

Stage

Country

Name

2

Germany

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

Accepted Clauses.Annex B.2.5 (Input Measurements). 6.3. AnnexB.2-6(Normal Operating Conditions TemperatureTest). 6.2.6.3, 9.31 Annex B.2 (Maximum OperatingTemperature for Materials. Components andSystems). Annex B.3(Simulated Abnormal OperatingConditions , Annex E.2 Audio Amplifier NormalOperating Conditions) and Annex E.3 ( AudioAmplifier abnormal Operating conditions). Annex Q(Limited Power Source), Annex F .3_1 0(Test for thePermanence of Markings), StrengthTest), 4.4.38, Annex (Drop Test), 4.4.32, AnnexTA T „5 (Steady Force Test), Tests —Wall and Ceiling Mounted Equipment). 4.4.3.4, Annex4.4.3.8. Annex T.8(Stress Relief), 4 M 2.4.7 (Equipment for direct insertion into mains socket-outlets), 5.4.8 (Humidity). 6.2.2 (Power SourceClassification), 6.2.3.2(Resistive PIS Determination),6.3.1, Glow-Wire Flammability, 6.4.3, Annex(Reduction of likelihood of Ignition under Single FaultCondition (SFC)J. 84 (Sharp Edge), 8.6.2.2 (StabilitY).Annex M.4w2 (Secondary Lithium Battery ChargingSafeguerds), Annex M.4.4, Annex TestEIJT containing Secondary Lithium Battery). AnnexM.3.2(Protection Circuits for Batteries). Annex P .4.2,Metallizod Coatings and Adhesives Securing Parts,G.5.4.6. OC LOCked Rotor Test).Annex V V.l .2 V .'.3 Accesslble Parts of equipment
2023-11-08

ITAV

Accepted Clauses:Annex B.2.S (Input Measurements). 6.3. AnnexB. 2.6(NormaI Operating Conditions TemperatureTest), 6.2. 6.3. 9.2.5, Annex 8.2 (Maximum OperatingTemperature for Materials, Components andSystems), Annex B.3(Simulated Abnormal OperatingConditions), Annex E.' (Audio Amplifier NormalOperating Conditions) and Annex ( AudioAmplitier abnormal operating conditions), Annex Q(Limited Power Source). Annex F -3- IO(Test for thePermanence of Markings), 5.4.9(Electric StrengthTest), 4,4.4.3. Annex T- 7 (Drop Test), 4.4.4.2. AnnexT.4. TS (Steady Force Test), 8.7(Loading Tests -Wall and Ceiling Mounted Equipment), 4.4.4,4, AnnexT.6(lmpact). 4,4.3.8. Annex T.B(Stress Relief). 4.1.2,4,7 (Equipment for direct insertion into mains socket-outlets), 5.4.8 (Humidity), 6_2.2 (Power SourceClassification). PIS Determination),6.4.3, Annex B.4 (Reduction of likelihood of Ignitionunder Single Fault Condition (SFC)J, 8.4 (SharpEdge), 8.6.2.2 (Stability). Annex M.4.2 (SecondaryLithium Battery Charging Safeguards). Annex M .4.4,Annex T.7(Drop Test Of EUT containing SecondaryLithium Battery), Annex M.3.2(Protection Circuits forBatteries),G 5,4.6, 0.5.4.6.3 (Secondary OC Locked Rotor Test),Annex P.4.2, Metallized Coatings and Adhesives SecuringParts Annex V, V.l .2. V. 1.3 (Accessible Parts Of Equipment)
2023-11-08

OFF

Acc,epted Clauses:1.6.2 (Input). 1.7.11(Durability of Matking). 2 S(Limited Power Source). 2,9,2 (Humidity), 3.1.2(Sharp Edges). (Stability), 4.2.6.4.2.1(Drop Test).4,2, 10 (Loading Tests — Wall and Ceiling MountedEquipment). 49 1-4 ? 4 (Steady Force Test), 4_3.6,(Direct Plug-In 1.4.12, 1_4.13(Heating Test), Clauses 4.5.1 (Heating Testunder normal operating conditions for ITE With audioamplifiers), 5.3 (Abnormal Operating and FaultConditionc). ((Abnorrnal Operatione Teet forAudio Amplifiers in Information Technology Equipment(ITE)), 5.22 (Electric Strength Test), 4.2.5,4.2. '(Impact), 4.2.7.4.2.1 (Stress Relief). 4.3.8(Battery Tests), 4.7.3.1, Glow-wire Flammability,Annex B. 7(secondary DC Locked Rotor Test)
2023-11-08

OFF

Acc,epted Clauses:1.6.2 (Input). 1.7.11(Durability of Matking). 2 S(Limited Power Source). 2,9,2 (Humidity), 3.1.2(Sharp Edges). (Stability), 4.2.6.4.2.1(Drop Test).4,2, 10 (Loading Tests — Wall and Ceiling MountedEquipment). 49 1-4 ? 4 (Steady Force Test), 4_3.6,(Direct Plug-In 1.4.12, 1_4.13(Heating Test), Clauses 4.5.1 (Heating Testunder normal operating conditions for ITE With audioamplifiers), 5.3 (Abnormal Operating and FaultConditionc). ((Abnorrnal Operatione Teet forAudio Amplifiers in Information Technology Equipment(ITE)), 5.22 (Electric Strength Test), 4.2.5,4.2. '(Impact), 4.2.7.4.2.1 (Stress Relief). 4.3.8(Battery Tests), 4.7.3.1, Glow-wire Flammability,Annex B. 7(secondary DC Locked Rotor Test)
2023-11-08

OFF

Acc,epted Clauses:1.6.2 (Input). 1.7.11(Durability of Matking). 2 S(Limited Power Source). 2,9,2 (Humidity), 3.1.2(Sharp Edges). (Stability), 4.2.6.4.2.1(Drop Test).4,2, 10 (Loading Tests — Wall and Ceiling MountedEquipment). 49 1-4 ? 4 (Steady Force Test), 4_3.6,(Direct Plug-In 1.4.12, 1_4.13(Heating Test), Clauses 4.5.1 (Heating Testunder normal operating conditions for ITE With audioamplifiers), 5.3 (Abnormal Operating and FaultConditionc). ((Abnorrnal Operatione Teet forAudio Amplifiers in Information Technology Equipment(ITE)), 5.22 (Electric Strength Test), 4.2.5,4.2. '(Impact), 4.2.7.4.2.1 (Stress Relief). 4.3.8(Battery Tests), 4.7.3.1, Glow-wire Flammability,Annex B. 7(secondary DC Locked Rotor Test)
2023-11-08