Enedo SpA

Address(es)
  • VIA ANCONA 59, 60027

    OSIMO (AN)
    Italy

Website Not available
Status

MEMBER

Acceptance date 2020-12-02

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

5.4.8 – HUMIDITY CONDITIONING5.6.6.2(a) – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 – PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 – PROTECTIVE CONDUCTOR CURRENT5.7.7 – SUMMATION OF TOUCH CURRENTS FROMEXTERNAL CIRCUITSANNEX G.5.4.5 – RUNNING OVERLOAD TEST FOR D.C.MOTORSANNEX G.5.4.6 – LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORS5.4.9 – ELECTRIC STRENGTH TEST5.2, 5.7 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.5.2.2 – SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR8.8 – HANDLE STRENGTH4.4.3.2, ANNEX T.5 – STEADY FORCE TEST, 250 N 4.4.3.2, ANNEX T.3 – STEADY FORCE TEST, 30 N 4.4.3.3, ANNEX T.7 – DROP TEST 4.4.3.4, ANNEX T.6, ANNEX Y.6.2 – IMPACT TEST 4.4.3.6, ANNEX T.9 – GLASS IMPACT TEST 4.4.3.8, ANNEX T.8 – STRESS RELIEF TEST B.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT 5.4.1.8 – DETERMINATION OF WORKING VOLTAGE 5.4.4.6.2 – SEPARABLE THIN SHEET MATERIAL8.6.2 – STATIC STABILITY B.2.5 – INPUT TEST: SINGLE PHASE B.3 – SIMULATED ABNORMAL OPERATING CONDITIONS B.4 – SIMULATED SINGLE FAULT CONDITIONS ANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGS Q.1 – LIMITED POWER SOURCE6.4 - POWER SOURCE MEASUREMENTS6.2.3.1 – ARCING PIS DETERMINATION6.2.3.2 – RESISTIVE PIS DETERMINATIONANNEX G.5.3.3 – TRANSFORMER OVERLOAD
2022-12-12

ITAV

5.4.8 – HUMIDITY CONDITIONING5.6.6.2(a) – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 – PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 – PROTECTIVE CONDUCTOR CURRENT5.7.7 – SUMMATION OF TOUCH CURRENTS FROMEXTERNAL CIRCUITSANNEX G.5.4.5 – RUNNING OVERLOAD TEST FOR D.C.MOTORSANNEX G.5.4.6 – LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORS5.4.9 – ELECTRIC STRENGTH TEST5.2, 5.7 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.5.2.2 – SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR8.8 – HANDLE STRENGTH
2020-12-02

MED

4.11 – Power Input5.7 – Humidity Conditioning5.9.2 – Determination of Accessible Parts7.1.2 – Legibility of Markings7.2.6 -Voltage Mismatch8.1 b - Shorting One MOP8.2.2 - Incorrect Polarity8.4.2 - Limitation of Voltage, Current or Power8.4.3 - Voltage or Charge Limitation8.5.4 - Working Voltage Measurements8.6.4 a) – Impedance and Current Carrying Capability8.7 – Leakage Current Tests8.7.4.5 – Earth Leakage Current8.7.4.6 – Touch Leakage Current8.7.4.7 a) – Patient Leakage Current8.8.3 – Dielectric Voltage Withstand8.9.2 - Short Circuiting in Lieu of Spacings11 – Temperature11.6.6 – Cleaning and Disinfection11.8 – Interruption of the Power Supply13 – Abnormal Operation Testing13.2 - Impairment of Cooling15.3.6 – Mold Stress Relief
2020-12-02

MED

4.11 – Power Input5.7 – Humidity Conditioning5.9.2 – Determination of Accessible Parts7.1.2 – Legibility of Markings7.2.6 -Voltage Mismatch8.1 b - Shorting One MOP8.2.2 - Incorrect Polarity8.4.2 - Limitation of Voltage, Current or Power8.4.3 - Voltage or Charge Limitation8.5.4 - Working Voltage Measurements8.6.4 a) – Impedance and Current Carrying Capability8.7 – Leakage Current Tests8.7.4.5 – Earth Leakage Current8.7.4.6 – Touch Leakage Current8.7.4.7 a) – Patient Leakage Current8.8.3 – Dielectric Voltage Withstand8.9.2 - Short Circuiting in Lieu of Spacings11 – Temperature11.6.6 – Cleaning and Disinfection11.8 – Interruption of the Power Supply13 – Abnormal Operation Testing13.2 - Impairment of Cooling15.3.6 – Mold Stress Relief
2020-12-02

MED

4.11 – Power Input5.7 – Humidity Conditioning5.9.2 – Determination of Accessible Parts7.1.2 – Legibility of Markings7.2.6 -Voltage Mismatch8.1 b - Shorting One MOP8.2.2 - Incorrect Polarity8.4.2 - Limitation of Voltage, Current or Power8.4.3 - Voltage or Charge Limitation8.5.4 - Working Voltage Measurements8.6.4 a) – Impedance and Current Carrying Capability8.7 – Leakage Current Tests8.7.4.5 – Earth Leakage Current8.7.4.6 – Touch Leakage Current8.7.4.7 a) – Patient Leakage Current8.8.3 – Dielectric Voltage Withstand8.9.2 - Short Circuiting in Lieu of Spacings9.6.2.1 - Acoustic Energy Measurement11 – Temperature11.6.6 – Cleaning and Disinfection11.8 – Interruption of the Power Supply13 – Abnormal Operation Testing13.1.2 – Power availability13.2 - Impairment of Cooling15.3.6 – Mold Stress Relief15.5.1.2– Transformer short circuit test15.5.1.3– Transformer overload test
2024-04-16