Emerson Climate Technologies (Suzhou), Ltd
Emerson Climate Technologies (Suzhou), Ltd
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2019-06-06 |
Further information
Stage | Country | Name |
---|---|---|
2 | United States of America |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
CONT | IEC 60730-1:2013 | 9.3 Adequacy Of Earth Connections10.2.4.3 Push/Pull Test For Tabs12.2 Protection Against Humid Conditions13.2 Electric Strength Test14 Heating Test16.2 Environmental Stress Of Temperature17 Endurance22.1 Resistance To Corrosion2.1.5, 2.1.6, 2.16DV SELV (Class 2) Output Voltage Measurement24.2.1DV.2 / 24.4.1 Switch Mode Power Supply Tests (SMPS)- Overload Test25.2 Overvoltage And Undervoltage TestH.8 Protection Against Electric ShockH.17.1.4.2 Thermal Cycling TestH.26.4 Harmonics And Interharmonics Including Mains Signalling At A.C. Power Port, Low Frequency Immunity TestsH.26.5.1 Voltage Dips And Interruptions – AC Supply OnlyH.26.5.2 Voltage Variation Test – AC Supply OnlyH.26.6 Test of Influence of Voltage UnbalanceH.26.8 Surge Immunity TestH.26.9 Electrical Fast Transient/Burst Immunity TestH.26.10 Ring Wave Immunity TestH.26.11 Electrostatic Discharge TestH.26.13 Test Of Influence Of Supply Frequency GenerationsH.26.15 Evaluation Of ComplianceH.27.1.1 Abnormal OperationH.27.1.1.3, H.27.1.1.4 Electronic Circuit Faults | 2019-05-31 | |
CONT | IEC 60730-1:2013/AMD1:2015 | 9.3 Adequacy Of Earth Connections10.2.4.3 Push/Pull Test For Tabs12.2 Protection Against Humid Conditions13.2 Electric Strength Test14 Heating Test16.2 Environmental Stress Of Temperature17 Endurance22.1 Resistance To Corrosion2.1.5, 2.1.6, 2.16DV SELV (Class 2) Output Voltage Measurement24.2.1DV.2 / 24.4.1 Switch Mode Power Supply Tests (SMPS)- Overload Test25.2 Overvoltage And Undervoltage TestH.8 Protection Against Electric ShockH.17.1.4.2 Thermal Cycling TestH.26.4 Harmonics And Interharmonics Including Mains Signalling At A.C. Power Port, Low Frequency Immunity TestsH.26.5.1 Voltage Dips And Interruptions – AC Supply OnlyH.26.5.2 Voltage Variation Test – AC Supply OnlyH.26.6 Test of Influence of Voltage UnbalanceH.26.8 Surge Immunity TestH.26.9 Electrical Fast Transient/Burst Immunity TestH.26.10 Ring Wave Immunity TestH.26.11 Electrostatic Discharge TestH.26.13 Test Of Influence Of Supply Frequency GenerationsH.26.15 Evaluation Of ComplianceH.27.1.1 Abnormal OperationH.27.1.1.3, H.27.1.1.4 Electronic Circuit Faults | 2019-05-31 |