Eltek s.r.o.

Address(es)
  • Palenica 53/79
    SK-SK-033 17 Liptovsky Hradok
    Slovakia
    +47 32 20 32 95
    +47 32 20 31 20
Website https://www.eltek.com
Status

MEMBER

Acceptance date 2023-02-21

Further information

Stage

Country

Name

1

Slovenia

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

Accepted clauses: B.2.5: Input test6.2.2.2: Power measurement for worst-case fault6.2.2.3:Power measurement for worst-case power source fault5.5.2.2: Capacitor discharge test5.2: Electrical energy source measurement5.4.1.4:Measurement of maximum operating temperatures for materials, components and systems5.4.9. Electric strength test5.6.6: Resistance of the protective bonding system5.7: Protective conductor current5.4.1.8:Determination of working voltage9.2.5: Temperature testB.3.1 – B.3.8: Simulated abnormal operating conditions:- Covering of ventilation openings*- DC mains polarity test- Setting of voltage selector- Maximum load at output terminals- Reverse battery polarityB.4.1 – B.4.9 Simulated single fault conditions:- Blocked motor test- Short circuit of clearances for functional insulation- Short circuit of creepage distances for functional insulation- Short circuit and interruption of electrodes in tubes and semiconductors- Short circuit or disconnection of passive devices- Continuous operation of componentsV.1.2. Test method 1 - Surfaces and openings tested with jointed test probeV.1.3. Test method 2 - Openings tested with straight unjointed test probes
2023-02-22

ITAV

Accepted clauses: B.2.5: Input test6.2.2.2: Power measurement for worst-case fault6.2.2.3:Power measurement for worst-case power source fault5.5.2.2: Capacitor discharge test5.2: Electrical energy source measurement5.4.1.4:Measurement of maximum operating temperatures for materials, components and systems5.4.9. Electric strength test5.6.6: Resistance of the protective bonding system5.7: Protective conductor current5.4.1.8:Determination of working voltage9.2.5: Temperature testB.3.1 – B.3.8: Simulated abnormal operating conditions:- Covering of ventilation openings*- DC mains polarity test- Setting of voltage selector- Maximum load at output terminals- Reverse battery polarityB.4.1 – B.4.9 Simulated single fault conditions:- Blocked motor test- Short circuit of clearances for functional insulation- Short circuit of creepage distances for functional insulation- Short circuit and interruption of electrodes in tubes and semiconductors- Short circuit or disconnection of passive devices- Continuous operation of componentsV.1.2. Test method 1 - Surfaces and openings tested with jointed test probeV.1.3. Test method 2 - Openings tested with straight unjointed test probes
2023-02-22

OFF

Accepted clauses: 1.6.2, 1.7.11, 2.1.1, 2.1.1.5, 2.1.1.7, 2.1.1.8, 2.2, 2.3, 2.4, 2.5, 2.6, 2.9.2, 2.10.2, 2.10.3/4, 4.1, 4.2.1, 4.2.3, 4.2.4, 4.2.5, 4.3.8, 4.5.2, 5.1, 5.2, 5.3
2023-02-21

OFF

Accepted clauses: 1.6.2, 1.7.11, 2.1.1, 2.1.1.5, 2.1.1.7, 2.1.1.8, 2.2, 2.3, 2.4, 2.5, 2.6, 2.9.2, 2.10.2, 2.10.3/4, 4.1, 4.2.1, 4.2.3, 4.2.4, 4.2.5, 4.3.8, 4.5.2, 5.1, 5.2, 5.3
2023-02-21

OFF

Accepted clauses: 1.6.2, 1.7.11, 2.1.1, 2.1.1.5, 2.1.1.7, 2.1.1.8, 2.2, 2.3, 2.4, 2.5, 2.6, 2.9.2, 2.10.2, 2.10.3/4, 4.1, 4.2.1, 4.2.3, 4.2.4, 4.2.5, 4.3.8, 4.5.2, 5.1, 5.2, 5.3
2023-02-21

OFF

Accepted clauses: 4.6, 4.7.16, 5.1, 5.2.1, 5.2.3, 5.2.5, 5.3, 5.7, 7.2, 7.3, 7.7, 8.1, 8.2, 8.3
2023-02-21

OFF

Accepted clauses: 4.6, 4.7.16, 5.1, 5.2.1, 5.2.3, 5.2.5, 5.3, 5.7, 7.2, 7.3, 7.7, 8.1, 8.2, 8.3
2023-02-21