ELGA LabWater
ELGA LabWater
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2023-03-27 |
Further information
Stage | Country | Name |
---|---|---|
1 | Denmark |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
MEAS | IEC 61010-1:2010 | Accepted Clauses:4.4.1 – Component Abnormal4.4.2.3 – Protective Conductor Abnormal Test4.4.2.5 – Motor Abnormal Test4.4.2.6 – Capacitors (in Aux. Windings of motors)4.4.2.10 – Cooling Abnormal Test5.1.3 – Mains Supply5.3 – Durability of Marking Test6.2 – Determination of Accessible Parts6.3 – Limit Values for Accessible Parts6.5.2.4 – Bonding Impedance of Plug connected equipment6.8 – Dielectric Withstand Test6.10.3 – Plugs and Connectors7.4 – Stability7.6 – Wall mounting8.2.1 – Rigidity Test8.2.2 – Impact test8.3.1 – Drop Test, Other than Hand-Held Equipment and Direct Plug-in Equipment10.1 - 10.4 – Temperature Test11.2 – Cleaning Test11.7.1 – Maximum Working Pressure Test11.7.2, Annex G – Leakage and Rupture at high pressure | 2023-03-27 | |
MEAS | IEC 61010-1:2010/AMD1:2016 | Accepted Clauses:4.4.1 – Component Abnormal4.4.2.3 – Protective Conductor Abnormal Test4.4.2.5 – Motor Abnormal Test4.4.2.6 – Capacitors (in Aux. Windings of motors)4.4.2.10 – Cooling Abnormal Test5.1.3 – Mains Supply5.3 – Durability of Marking Test6.2 – Determination of Accessible Parts6.3 – Limit Values for Accessible Parts6.5.2.4 – Bonding Impedance of Plug connected equipment6.8 – Dielectric Withstand Test6.10.3 – Plugs and Connectors7.4 – Stability7.6 – Wall mounting8.2.1 – Rigidity Test8.2.2 – Impact test8.3.1 – Drop Test, Other than Hand-Held Equipment and Direct Plug-in Equipment10.1 - 10.4 – Temperature Test11.2 – Cleaning Test11.7.1 – Maximum Working Pressure Test11.7.2, Annex G – Leakage and Rupture at high pressure | 2023-03-27 |