Electrolux Fabric and Dish Care Compliance Laboratory

Address(es)
  • Corso Lino Zanussi 24,
    IT- 33080 ITPN
    Porcia,
    Italy

Website Not available
Status

MEMBER

Acceptance date 2018-05-25

Further information

Stage

Country

Name

3

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

EMC

4.3.2, 4.3.3 & 5.2 & 5.4.1 MEASUREMENT OF CONDUCTED DISTURBANCES ON THE MAINS4.3.3; 5.4.2 & 5.4.3 MEASUREMENT OF DISCONTINUOUS DISTURBANCE (TERMINAL VOLTAGE)4.3.4 & 5.3.3 & 5.4.1 MEASUREMENT OF DISTURBANCE POWER 30 MHZ – 300 MHZ4.3.4 & 5.3.4 & 5.4.1 Measurement of Radiated emission – 30 MHz to 1 000 MHz4.3.5 & 5.3.4 & 5.4.1 Measurement of Radiated emission – 1 GHz to 6 GHz
2021-11-15

EMC

4.3.2 & 4.3.3; 5.4.1 MEASUREMENT OF CONDUCTED DISTURBANCES ON THE MAINS4.3.3; 5.4.2 & 5.4.3 MEASUREMENT OF DISCONTINUOUS DISTURBANCE (TERMINAL VOLTAGE)4.3.4; 5.3.3; 5.4.1 MEASUREMENT OF DISTURBANCE POWER 30 MHZ – 300 MHZ4.3.4 & 5.3 & 5.4.1 Measurement of Radiated emission – 30 MHz to 1 000 MHz
2019-12-20

EMC

4.2 MEASUREMENT OF DISCONTINUOUS DISTURBANCE (TERMINAL VOLTAGE)4.1.1 MEASUREMENT OF CONDUCTED DISTURBANCES ON THE MAINS4.1.2 MEASUREMENT OF DISTURBANCE POWER
2019-12-20

EMC

4.2 MEASUREMENT OF DISCONTINUOUS DISTURBANCE (TERMINAL VOLTAGE)4.1.1 MEASUREMENT OF CONDUCTED DISTURBANCES ON THE MAINS4.1.2 MEASUREMENT OF DISTURBANCE POWER
2019-12-20

EMC

4.2 MEASUREMENT OF DISCONTINUOUS DISTURBANCE (TERMINAL VOLTAGE)4.1.1 MEASUREMENT OF CONDUCTED DISTURBANCES ON THE MAINS4.1.2 MEASUREMENT OF DISTURBANCE POWER4.1.2 & 9 Measurement of Radiated emission – 30 MHz to 1 000 MHz
2019-12-20

EMC

4.3.2, 4.3.3 & 5.2 & 5.4.1 MEASUREMENT OF CONDUCTED DISTURBANCES ON THE MAINS4.3.3; 5.4.2 & 5.4.3 MEASUREMENT OF DISCONTINUOUS DISTURBANCE (TERMINAL VOLTAGE)4.3.4 & 5.3.3 & 5.4.1 MEASUREMENT OF DISTURBANCE POWER 30 MHZ – 300 MHZ4.3.4 & 5.3.4 & 5.4.1 Measurement of Radiated emission – 30 MHz to 1 000 MHz4.3.5 & 5.3.4 & 5.4.1 Measurement of Radiated emission – 1 GHz to 6 GHz
2021-11-15

EMC

5.1 Electrostatic Discharge5.2 Fast Transients5.3 Injected Currents, 0.15 MHz to 230 MHz5.4 Injected Currents, 0.15 MHz to 80 MHz5.5 Radio frequency electromagnetic fields, 80 MHz to 1000 MHz5.6 Surges5.7 Voltage dips5.1 Electrostatic Discharge5.2 Fast Transients5.3 Injected Currents, 0.15 MHz to 230 MHz5.4 Injected Currents, 0.15 MHz to 80 MHz5.5 Radio frequency electromagnetic fields, 80 MHz to 6 GHz5.6 Surges5.7 Voltage dips
2019-12-20

EMC

All Clauses
2019-12-20

EMC

ALL CLAUSES
2021-11-15

EMC

All Clauses
2019-12-20

EMC

All Clauses
2019-12-20

EMC

All Clauses
2019-12-20

EMC

ALL CLAUSES
2021-11-15

EMC

All Clauses
2019-12-20

EMC

ALL CLAUSES
2021-11-15

EMC

All Clauses
2021-11-15

EMC

All Clauses
2021-11-15

EMC

All Clauses
2021-11-15

EMC

All clauses (EXCLUDED TESTS ON SIGNAL AND CONTROL PORTS)
2019-12-20

EMC

ALL CLAUSES (EXCLUDED TESTS ON SIGNAL AND CONTROL PORTS)
2019-12-20

EMC

ALL CLAUSES (EXCLUDED TESTS ON SIGNAL AND CONTROL PORTS)
2019-12-20

EMC

All Clauses(EXCLUDED TESTS ON SIGNAL AND CONTROL PORTS)
2019-12-20

EMC

All Clauses
2019-12-20

EMC

All Clauses
2019-12-20

EMC

All Clauses
2019-12-20

EMC

All Clauses
2019-12-20

EMC

All Clauses
2019-12-20

EMC

All Clauses
2019-12-20

HOUS

19.11.4.27.141011131515.215.316.216.31719.1019.1219.1419.219.319.419.519.619.719.819.920.120.221.121.222.1122.1222.1322.1622.4222.4722.4822.522.622.723.323.524.525.1425.225.2126.1026.326.527.528.130.130.219.11.119.11.219.11.319.11.4.119.11.4.319.11.4.419.11.4.519.11.4.625.15, 25.1629.1, 29.229.2, ANNEX N29.3.230.2.3.2, ANNEX E8.1.18.1.28.1.38.1.48.1.4ANNEX CANNEX DANNEX GANNEX I
2019-12-20

HOUS

19.11.4.27.141011131515.215.316.216.31719.1019.1219.1419.219.319.419.519.619.719.819.920.120.221.121.222.1122.1222.1322.1622.4222.4722.4822.522.622.723.323.524.525.1425.225.2126.1026.326.527.528.130.130.219.11.119.11.219.11.319.11.4.119.11.4.319.11.4.419.11.4.519.11.4.625.15, 25.1629.1, 29.229.2, ANNEX N29.3.230.2.3.2, ANNEX E8.1.18.1.28.1.38.1.48.1.4ANNEX CANNEX DANNEX GANNEX I
2019-12-20

HOUS

19.11.4.27.141011131515.215.316.216.31719.1019.1219.1419.219.319.419.519.619.719.819.920.120.221.121.222.1122.1222.1322.1622.4222.4722.4822.522.622.723.323.524.525.1425.225.2126.1026.326.527.528.130.130.219.11.119.11.219.11.319.11.4.119.11.4.319.11.4.419.11.4.519.11.4.625.15, 25.1629.1, 29.229.2, ANNEX N29.3.230.2.3.2, ANNEX E8.1.18.1.28.1.38.1.48.1.4ANNEX CANNEX DANNEX GANNEX I
2019-12-20

HOUS

7 MARKING AND INSTRUCTIONS8 PROTECTION AGAINST ACCESS TO LIVE PARTS10 POWER INPUT AND CURRENT11 HEATING13 LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE15.101 MOISTURE RESISTANCE16 LEAKAGE CURRENT AND ELECTRIC STRENGTH19.101 ABNORMAL OPERATIONS: FAULT CONDITION20.101 STABILITY: 23 KG TILT TEST20.102 STABILITY: DOOR INTERLOCK22.101 CONSTRUCTION: PRESSURE STRENGT23 INTERNAL WIRING24 COMPONENTS25 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS26 TERMINALS FOR EXTERNAL CONDUCTORS27 PROVISION FOR EARTHING28 SCREWS AND CONNECTIONS29 CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION30 RESISTANCE TO HEAT AND FIRE
2021-11-15

HOUS

7 MARKING AND INSTRUCTIONS8 PROTECTION AGAINST ACCESS TO LIVE PARTS10 POWER INPUT AND CURRENT11 HEATING13 LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE15.101 MOISTURE RESISTANCE16 LEAKAGE CURRENT AND ELECTRIC STRENGTH19.101 ABNORMAL OPERATIONS: FAULT CONDITION20.101 STABILITY: 23 KG TILT TEST20.102 STABILITY: DOOR INTERLOCK22.101 CONSTRUCTION: PRESSURE STRENGT23 INTERNAL WIRING24 COMPONENTS25 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS26 TERMINALS FOR EXTERNAL CONDUCTORS27 PROVISION FOR EARTHING28 SCREWS AND CONNECTIONS29 CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION30 RESISTANCE TO HEAT AND FIRE
2021-11-15

HOUS

7 MARKING AND INSTRUCTIONS8 PROTECTION AGAINST ACCESS TO LIVE PARTS10 POWER INPUT AND CURRENT11 HEATING13 LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE15 MOISTURE RESISTANCE16 LEAKAGE CURRENT AND ELECTRIC STRENGTH17 OVERLOAD PROTECTION OF TRANSFORMER AND ASSOCIATED CIRCUITS18.101 ENDURANCE - LID OR DOOR INTERLOCK18.102 ENDURANCE - BRAKING MECHANISM19 ABNORMAL OPERATION19.101 ABNORMAL OPERATION - UNEXPECTED OPERATION19.102 ABNORMAL OPERATION - HOT WATER20 STABILITY AND MECHANICAL HAZARDS20.101 STABILITY AND MECHANICAL HAZARDS - TOP OPENING WITH HINGED LID20.102 STABILITY AND MECHANICAL HAZARDS - UNBALANCED LOAD20.103 STABILITY AND MECHANICAL HAZARDS - DOOR INTERLOCK20.104 STABILITY AND MECHANICAL HAZARDS - DOOR OR LID OPENING20.105 STABILITY AND MECHANICAL HAZARDS - SWITCH OFF MOTOR20.106 STABILITY AND MECHANICAL HAZARDS - START CYCLE20.106 STABILITY AND MECHANICAL HAZARDS - DOUBLE COMMAND20.107 STABILITY AND MECHANICAL HAZARDS - OPENING THE DOOR FROM THE INSIDE21 MECHANICAL STRENGTH21.102 MECHANICAL STRENGTH - LIDS DISTORTION22.101 CONSTRUCTION - WATER LEVEL22.102 CONSTRUCTION - TEXTILE MATERIAL TEST22.103 CONSTRUCTION - FILTER COMPARTMENT OPENING BY SIMPLE ACTION22.104 CONSTRUCTION - INTERLOCK RELEASE MECHANISM22.105 CONSTRUCTION - FORCED OPENING TEST22.106 CONSTRUCTION - STEAM GENERATORS VENTING APERTURE22.107 CONSTRUCTION - STEAM GENERATORS - SPILLAGE OR JET22.108 CONSTRUCTION - SIMULTANEOUS ACTIVATION OF HEATERS AND MOTORS23 INTERNAL WIRING24 COMPONENTS25 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS26 TERMINALS FOR EXTERNAL CONDUCTORS27 PROVISION FOR EARTHING28 SCREWS AND CONNECTIONS29 CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION30 RESISTANCE TO HEAT AND FIRE21.101.1 MECHANICAL STRENGTH - LIDS 21.101.2 MECHANICAL STRENGTH - DOORS ANNEX CC ELECTROLYSER WASHING MACHINE - OZONE CONCENTRATION
2021-05-18

HOUS

7 MARKING AND INSTRUCTIONS8 PROTECTION AGAINST ACCESS TO LIVE PARTS10 POWER INPUT AND CURRENT11 HEATING13 LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE15 MOISTURE RESISTANCE16 LEAKAGE CURRENT AND ELECTRIC STRENGTH17 OVERLOAD PROTECTION OF TRANSFORMER AND ASSOCIATED CIRCUITS19 ABNORMAL OPERATION19.101 ABNORMAL OPERATION - UNEXPECTED OPERATION19.102 ABNORMAL OPERATION - HOT WATER20 STABILITY AND MECHANICAL HAZARDS20.101 STABILITY AND MECHANICAL HAZARDS - DOORLOCK20.102 STABILITY AND MECHANICAL HAZARDS - UNBALANCED LOAD20.103 STABILITY AND MECHANICAL HAZARDS - DOOR OPENING20.104 STABILITY AND MECHANICAL HAZARDS - 70 N20.104 STABILITY AND MECHANICAL HAZARDS - SWITCH OFF MOTOR20.105 STABILITY AND MECHANICAL HAZARDS - INTERLOCK20.105 STABILITY AND MECHANICAL HAZARDS - START CYCLE20.106 STABILITY AND MECHANICAL HAZARDS - DOUBLE COMMAND20.107 STABILITY AND MECHANICAL HAZARDS - OPENING THE DOOR FROM THE INSIDE21 MECHANICAL STRENGTH21.101 MECHANICAL STRENGTH - LIDS DISTORTION22 CONSTRUCTION22.101 CONSTRUCTION - WATER LEVEL22.102 CONSTRUCTION - TEXTILE MATERIAL TEST22.103 CONSTRUCTION - SIMPLE ACTION TEST22.104 CONSTRUCTION - RELEASE MECHANISM22.105 CONSTRUCTION - FORCED OPENING TEST23 INTERNAL WIRING24 COMPONENTS25 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS26 TERMINALS FOR EXTERNAL CONDUCTORS27 PROVISION FOR EARTHING28 SCREWS AND CONNECTIONS29 CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION30 RESISTANCE TO HEAT AND FIRE18.101, 18.102 ENDURANCE21.101.2 MECHANICAL STRENGTH - LIDS AND DOOR MECHANICAL STRENGTHANNEX CC ELECTROLYSER WASHING MACHINE - OZONE CONCENTRATION
2019-12-20

HOUS

7 MARKING AND INSTRUCTIONS8 PROTECTION AGAINST ACCESS TO LIVE PARTS10 POWER INPUT AND CURRENT11 HEATING13 LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE15 MOISTURE RESISTANCE16 LEAKAGE CURRENT AND ELECTRIC STRENGTH17 OVERLOAD PROTECTION OF TRANSFORMER AND ASSOCIATED CIRCUITS19 ABNORMAL OPERATION19.101 ABNORMAL OPERATION - UNEXPECTED OPERATION19.102 ABNORMAL OPERATION - HOT WATER20 STABILITY AND MECHANICAL HAZARDS20.101 STABILITY AND MECHANICAL HAZARDS - DOORLOCK20.102 STABILITY AND MECHANICAL HAZARDS - UNBALANCED LOAD20.103 STABILITY AND MECHANICAL HAZARDS - DOOR OPENING20.104 STABILITY AND MECHANICAL HAZARDS - 70 N20.104 STABILITY AND MECHANICAL HAZARDS - SWITCH OFF MOTOR20.105 STABILITY AND MECHANICAL HAZARDS - INTERLOCK20.105 STABILITY AND MECHANICAL HAZARDS - START CYCLE20.106 STABILITY AND MECHANICAL HAZARDS - DOUBLE COMMAND20.107 STABILITY AND MECHANICAL HAZARDS - OPENING THE DOOR FROM THE INSIDE21 MECHANICAL STRENGTH21.101 MECHANICAL STRENGTH - LIDS DISTORTION22 CONSTRUCTION22.101 CONSTRUCTION - WATER LEVEL22.102 CONSTRUCTION - TEXTILE MATERIAL TEST22.103 CONSTRUCTION - SIMPLE ACTION TEST22.104 CONSTRUCTION - RELEASE MECHANISM22.105 CONSTRUCTION - FORCED OPENING TEST23 INTERNAL WIRING24 COMPONENTS25 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS26 TERMINALS FOR EXTERNAL CONDUCTORS27 PROVISION FOR EARTHING28 SCREWS AND CONNECTIONS29 CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION30 RESISTANCE TO HEAT AND FIRE18.101, 18.102 ENDURANCE21.101.2 MECHANICAL STRENGTH - LIDS AND DOOR MECHANICAL STRENGTHANNEX CC ELECTROLYSER WASHING MACHINE - OZONE CONCENTRATION
2019-12-20

HOUS

7 MARKING AND INSTRUCTIONS8 PROTECTION AGAINST ACCESS TO LIVE PARTS10 POWER INPUT AND CURRENT11 HEATING13 LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE15 MOISTURE RESISTANCE16 LEAKAGE CURRENT AND ELECTRIC STRENGTH17 OVERLOAD PROTECTION OF TRANSFORMER AND ASSOCIATED CIRCUITS19 ABNORMAL OPERATION19.101 ABNORMAL OPERATION - UNEXPECTED OPERATION19.102 ABNORMAL OPERATION - HOT WATER20 STABILITY AND MECHANICAL HAZARDS20.101 STABILITY AND MECHANICAL HAZARDS - DOORLOCK20.102 STABILITY AND MECHANICAL HAZARDS - UNBALANCED LOAD20.103 STABILITY AND MECHANICAL HAZARDS - DOOR OPENING20.104 STABILITY AND MECHANICAL HAZARDS - 70 N20.104 STABILITY AND MECHANICAL HAZARDS - SWITCH OFF MOTOR20.105 STABILITY AND MECHANICAL HAZARDS - INTERLOCK20.105 STABILITY AND MECHANICAL HAZARDS - START CYCLE20.106 STABILITY AND MECHANICAL HAZARDS - DOUBLE COMMAND20.107 STABILITY AND MECHANICAL HAZARDS - OPENING THE DOOR FROM THE INSIDE21 MECHANICAL STRENGTH21.101 MECHANICAL STRENGTH - LIDS DISTORTION22 CONSTRUCTION22.101 CONSTRUCTION - WATER LEVEL22.102 CONSTRUCTION - TEXTILE MATERIAL TEST22.103 CONSTRUCTION - SIMPLE ACTION TEST22.104 CONSTRUCTION - RELEASE MECHANISM22.105 CONSTRUCTION - FORCED OPENING TEST23 INTERNAL WIRING24 COMPONENTS25 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS26 TERMINALS FOR EXTERNAL CONDUCTORS27 PROVISION FOR EARTHING28 SCREWS AND CONNECTIONS29 CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION30 RESISTANCE TO HEAT AND FIRE18.101, 18.102 ENDURANCE21.101.2 MECHANICAL STRENGTH - LIDS AND DOOR MECHANICAL STRENGTHANNEX CC ELECTROLYSER WASHING MACHINE - OZONE CONCENTRATION
2019-12-20

HOUS

7 MARKING AND INSTRUCTIONS8 PROTECTION AGAINST ACCESS TO LIVE PARTS10 POWER INPUT AND CURRENT11 HEATING13 LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE15 MOISTURE RESISTANCE16 LEAKAGE CURRENT AND ELECTRIC STRENGTH17 OVERLOAD PROTECTION OF TRANSFORMER AND ASSOCIATED CIRCUITS19 ABNORMAL OPERATION19.101 ABNORMAL OPERATION - UNEXPECTED OPERATION19.102 ABNORMAL OPERATION - TEST PROBE C OF IEC 61032 + 50 MM PIN TEST19.103 ABNORMAL OPERATION - TEXTILE20 STABILITY AND MECHANICAL HAZARDS20.101 STABILITY AND MECHANICAL HAZARD - UNEXPECTED START MOTOR20.102 STABILITY AND MECHANICAL HAZARD - 70 N20.103 STABILITY AND MECHANICAL HAZARD - 23 KG20.104 STABILITY AND MECHANICAL HAZARD - DOUBLE COMMAND21 MECHANICAL STRENGTH22.101 CONSTRUCTION - TEXTILE22.102 CONSTRUCTION - INTERLOCK22.103 CONSTRUCTION - TILTING22.104 CONSTRUCTION - COOLDOWN22.105 CONSTRUCTION - COOLDOWN AIR TEMPERATURE NOT EXCEEDING 55°C23 INTERNAL WIRING24 COMPONENTS25 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORD26 TERMINALS FOR EXTERNAL CONDUCTORS27 PROVISION FOR EARTHING28 SCREWS AND CONNECTIONS29 CLEARANCE, CREEPAGE DISTANCES AND SOLID INSULATION30 RESISTANCE TO HEAT AND FIRE30.101 RESISTANCE TO HEAT AND FIRE - NEEDLE FLAMEANNEX BB HEAT PUMPANNEX CC EQUIPMENT PROTECTION BY TYPE OF PROTECTION "N"
2021-05-18

HOUS

7 MARKING AND INSTRUCTIONS8 PROTECTION AGAINST ACCESS TO LIVE PARTS10 POWER INPUT AND CURRENT11 HEATING13 LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE15 MOISTURE RESISTANCE16 LEAKAGE CURRENT AND ELECTRIC STRENGTH17 OVERLOAD PROTECTION OF TRANSFORMER AND ASSOCIATED CIRCUITS19 ABNORMAL OPERATION19.101 ABNORMAL OPERATION - UNEXPECTED OPERATION19.102 ABNORMAL OPERATION - TEST PROBE C OF IEC 61032 + 50 MM PIN TEST19.103 ABNORMAL OPERATION - TEXTILE20 STABILITY AND MECHANICAL HAZARDS20.101 STABILITY AND MECHANICAL HAZARD - UNEXPECTED START MOTOR20.102 STABILITY AND MECHANICAL HAZARD - 70 N20.103 STABILITY AND MECHANICAL HAZARD - 23 KG20.104 STABILITY AND MECHANICAL HAZARD - DOUBLE COMMAND21 MECHANICAL STRENGTH22.101 CONSTRUCTION - TEXTILE22.102 CONSTRUCTION - INTERLOCK22.103 CONSTRUCTION - TILTING22.104 CONSTRUCTION - COOLDOWN22.105 CONSTRUCTION - COOLDOWN AIR TEMPERATURE NOT EXCEEDING 55°C23 INTERNAL WIRING24 COMPONENTS25 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORD26 TERMINALS FOR EXTERNAL CONDUCTORS27 PROVISION FOR EARTHING28 SCREWS AND CONNECTIONS29 CLEARANCE, CREEPAGE DISTANCES AND SOLID INSULATION30 RESISTANCE TO HEAT AND FIRE30.101 RESISTANCE TO HEAT AND FIRE - NEEDLE FLAMEANNEX BB HEAT PUMPANNEX CC EQUIPMENT PROTECTION BY TYPE OF PROTECTION "N"
2019-12-20

HOUS

7 MARKING AND INSTRUCTIONS8 PROTECTION AGAINST ACCESS TO LIVE PARTS10 POWER INPUT AND CURRENT11 HEATING13 LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE15 MOISTURE RESISTANCE16 LEAKAGE CURRENT AND ELECTRIC STRENGTH17 OVERLOAD PROTECTION OF TRANSFORMER AND ASSOCIATED CIRCUITS19 ABNORMAL OPERATION19.101 ABNORMAL OPERATION - UNEXPECTED OPERATION19.102 ABNORMAL OPERATION - TEST PROBE C OF IEC 61032 + 50 MM PIN TEST19.103 ABNORMAL OPERATION - TEXTILE20 STABILITY AND MECHANICAL HAZARDS20.101 STABILITY AND MECHANICAL HAZARD - UNEXPECTED START MOTOR20.102 STABILITY AND MECHANICAL HAZARD - 70 N20.103 STABILITY AND MECHANICAL HAZARD - 23 KG20.104 STABILITY AND MECHANICAL HAZARD - DOUBLE COMMAND21 MECHANICAL STRENGTH22.101 CONSTRUCTION - TEXTILE22.102 CONSTRUCTION - INTERLOCK22.103 CONSTRUCTION - TILTING22.104 CONSTRUCTION - COOLDOWN22.105 CONSTRUCTION - COOLDOWN AIR TEMPERATURE NOT EXCEEDING 55°C23 INTERNAL WIRING24 COMPONENTS25 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORD26 TERMINALS FOR EXTERNAL CONDUCTORS27 PROVISION FOR EARTHING28 SCREWS AND CONNECTIONS29 CLEARANCE, CREEPAGE DISTANCES AND SOLID INSULATION30 RESISTANCE TO HEAT AND FIRE30.101 RESISTANCE TO HEAT AND FIRE - NEEDLE FLAMEANNEX BB HEAT PUMPANNEX CC EQUIPMENT PROTECTION BY TYPE OF PROTECTION "N"
2019-12-20

HOUS

7 MARKING AND INSTRUCTIONS8 PROTECTION AGAINST ACCESS TO LIVE PARTS10 POWER INPUT AND CURRENT11 HEATING13 LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE15 MOISTURE RESISTANCE16 LEAKAGE CURRENT AND ELECTRIC STRENGTH17 OVERLOAD PROTECTION OF TRANSFORMER AND ASSOCIATED CIRCUITS19 ABNORMAL OPERATION19.101 ABNORMAL OPERATION - UNEXPECTED OPERATION19.102 ABNORMAL OPERATION - TEST PROBE C OF IEC 61032 + 50 MM PIN TEST19.103 ABNORMAL OPERATION - TEXTILE20 STABILITY AND MECHANICAL HAZARDS20.101 STABILITY AND MECHANICAL HAZARD - UNEXPECTED START MOTOR20.102 STABILITY AND MECHANICAL HAZARD - 70 N20.103 STABILITY AND MECHANICAL HAZARD - 23 KG20.104 STABILITY AND MECHANICAL HAZARD - DOUBLE COMMAND21 MECHANICAL STRENGTH22.101 CONSTRUCTION - TEXTILE22.102 CONSTRUCTION - INTERLOCK22.103 CONSTRUCTION - TILTING22.104 CONSTRUCTION - COOLDOWN22.105 CONSTRUCTION - COOLDOWN AIR TEMPERATURE NOT EXCEEDING 55°C23 INTERNAL WIRING24 COMPONENTS25 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORD26 TERMINALS FOR EXTERNAL CONDUCTORS27 PROVISION FOR EARTHING28 SCREWS AND CONNECTIONS29 CLEARANCE, CREEPAGE DISTANCES AND SOLID INSULATION30 RESISTANCE TO HEAT AND FIRE30.101 RESISTANCE TO HEAT AND FIRE - NEEDLE FLAMEANNEX BB HEAT PUMPANNEX CC EQUIPMENT PROTECTION BY TYPE OF PROTECTION "N"
2019-12-20