DELTA ELECTRONICS (THAILAND) PUBLIC CO LTD

Address(es)
  • 909 SOI 9, MOO 4, PATTANA 1RD, BANGPOO INDUSTRIAL ESTATE (E P Z), TAMBOL PHRAKSA AMPHUR MUANG SAMUTPRAKARN, 10280
    Thailand

Website Not available
Status

MEMBER

Acceptance date 2017-06-15

Further information

Stage

Country

Name

2

Denmark

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, ANNEX T.4 – STEADY FORCE TEST, 100 N4.4.3.2, ANNEX T.5 – STEADY FORCE TEST, 250 N4.4.3.2, ANNEX T.3 – STEADY FORCE TEST, 30 N4.4.3.3, ANNEX T.7 – DROP TEST4.4.3.4, ANNEX T.6, ANNEX Y.6.2 – IMPACT TEST4.4.3.8, ANNEX T.8 – STRESS RELIEF TEST5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.3 – TEST FOR HYGROSCOPIC MATERIALS5.4.1.5.2, 5.4.1.5.3 – TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR AN INSULATING COMPOUND5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 – BALL PRESSURE TEST5.4.2.4 – MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST5.4.4.6.2 – SEPARABLE THIN SHEET MATERIAL5.4.7, 5.4.1.5.3 – TESTS FOR SEMICONDUCTOR COMPONENTS AND CEMENTED JOINTS5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.4.11.3 – TEST FOR SEPARATION BETWEEN EXTERNAL CIRCUITS AND EARTH5.5.2.2 – CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS5.7.6 – PROTECTIVE CONDUCTOR CURRENT5.7.7 – SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS6.2.3.1 – ARCING PIS DETERMINATION6.2.3.2 – RESISTIVE PIS DETERMINATION6.6 – TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION8.5.3, ANNEX T.8, ANNEX V – ACCESSIBILITY TO MOVING PARTS8.7 – WALL, CEILING, OR OTHER STRUCTURE MOUNTING TESTS8.8 – HANDLE STRENGTHB.2.5 – INPUT TEST: SINGLE PHASEB.2.5 – INPUT TEST: POLYPHASEB.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 – TRANSFORMER OVERLOADANNEX G.5.4.6 – LOCKED-ROTOR OVERLOAD TEST FOR DC MOTORSANNEX G.5.4.6.3 – ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FOR DC MOTORSANNEX G.7.3.2 – CORD STRAIN RELIEF TESTANNEX G.10.3 – RESISTOR TEST, G.10.2 - CONDITIONINGANNEX G.10.6 – OVERLOAD TEST- FOR RESISTORS USED AS A CAPACITOR DISCHARGE SAFEGUARDQ.1 – LIMITED POWER SOURCEANNEX R.1 – LIMITED SHORT CIRCUIT TEST
2020-12-07

ITAV

5.2, 5.7 - CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.2.1.1 - ACCESSIBLE ES1 CIRCUITS SEPARATED FROM OTHER ES CIRCUITS USING COMPONENTS5.4.1.10.3 - BALL PRESSURE TEST5.4.1.3 - TEST FOR HYGROSCOPIC MATERIALS5.4.1.4, 9.2, B.1.6 , B.2.6 - HEATING5.4.1.4, ANNEX B.2 - MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.5.2 - TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR AN INSULATING COMPOUND5.4.1.8 - DETERMINATION OF WORKING VOLTAGE5.4.2.4 - MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST5.4.4.6.2 - SEPARABLE THIN SHEET MATERIAL5.4.8 - HUMIDITY CONDITIONING5.4.9 - ELECTRIC STRENGTH5.4.11.3 - TEST FOR SEPARATION BETWEEN EXTERNAL CIRCUITS AND EARTH5.5.2.2 - SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.4, ANNEX R - PROTECTIVE BONDING CONDUCTORS: LIMITED SHORT CIRCUIT TEST5.6.6.2 A) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: 25 A OR LESS5.6.6.2 B) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: EXCEEDING 25 A5.6.6.2 C) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: ALTERNATIVE TO 5.6.6.2 B)5.6.6.2 D) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: DC MIANS5.6.6.2 E) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: EXTERNAL CIRCUIT5.7 - PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.4 - EARTHED ACCESSIBLE CONDUCTIVE PARTS5.7.5 - PROTECTIVE CONDUCTOR CURRENT5.7.7 A) - SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS: EARTHED EXTERNAL CIRCUIT5.7.7 B) - SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS: NO REFERENCE TO PROTECTIVE EARTH6.2.2.2 - POWER MEASUREMENT: WORST-CASE FAULT6.2.2.2, 6.2.2.3 - POWER MEASUREMENTS6.2.2.3 - POWER MEASUREMENT: WORST-CASE POWER SOURCE FAULT6.2.3.1 - ARCING PIS DETERMINATION6.2.3.2 - RESISTIVE PIS DETERMINATION6.5.3, 6.6, ANNEX Q.1 - LIMITED POWER SOURCE6.6 - TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION6.6 - TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION - WORST-CASE FAULT6.6 - TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION - WORST-CASE POWER SOURCE FAULT8.5.3, ANNEX T.8, ANNEX V - ACCESSIBILITY TO MOVING PARTS8.7 - WALL OR CEILING MOUNTING TESTS8.8 - HANDLE STRENGTH9.2.5 - TOUCH TEMPERATURE TEST: ABNORMAL OPERATING CONDITIONS9.2.5 - TOUCH TEMPERATURE TEST: NORMAL OPERATING CONDITIONSANNEX B.2.5 - INPUT TEST: POLYPHASEANNEX B.2.5 - INPUT TEST: SINGLE PHASEANNEX B.2.6 - NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 - SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.3.2 - SIMULATED ABNORMAL OPERATING CONDITIONS: COVERING OF VENTILATION OPENINGSANNEX B.3.3 - SIMULATED ABNORMAL OPERATING CONDITIONS: DC MAINS POLARITYANNEX B.3.4 - SIMULATED ABNORMAL OPERATING CONDITIONS: SETTING OF VOLTAGE SELECTORANNEX B.3.5 - SIMULATED ABNORMAL OPERATING CONDITIONS: MAXIMUM LOAD AT OUTPUT TERMINALSANNEX B.3.6 - SIMULATED ABNORMAL OPERATING CONDITIONS: REVERSE BATTERY POLARITYANNEX B.4 - SIMULATED SINGLE FAULT CONDITIONSANNEX B.4.1, B.4.4, B.4.5, B.4.6 - SIMULATED SINGLE FAULT CONDITIONS: BLOCKED MOTORANNEX B.4.7 - SIMULATED SINGLE FAULT CONDITIONS: CONTINUOUS OPERATION OF COMPONENTSANNEX F.3.10 - TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 - TRANSFORMER OVERLOADANNEX G.5.3.3.3 - TRANSFORMER OVERLOAD – ALTERNATIVE TEST METHODANNEX G.7.3.2 - STRAIN RELIEF TEST4.4.4.2, ANNEX T.2 - STEADY FORCE TEST, 10N4.4.4.2, 4.4.4.5, ANNEX T.2 - T.5 - STEADY FORCE TEST (10N, 30N, 100N, 250N)4.4.4.2, ANNEX T.5 - STEADY FORCE TEST (250N)4.4.4.4, ANNEX T.6 - ENCLOSURE IMPACT TEST4.4.4.3, ANNEX T.7 – DROP TEST4.4.4.7, ANNEX T.8 - STRESS RELIEF TESTANNEX T.8 (4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4) - STRESS RELIEF – ALTERNATE TEST PER IEC 60695-10-3
2020-12-07

OFF

1.2.2.1 Guide Information Page - Maximum Output Voltage, Current, and Volt Ampere Measurement1.6.2 Input: Single-Phase1.6.2 Input: Polyphase1.7.11 Durability of Marking2.1.1.1, 2.8.2, Part 21 4.2 Access To Energized Parts Test2.1.1.5, 2.1.2, 1.2.8.10 Energy Hazard Measurements2.1.1.7 Capacitance Discharge2.2.2, 2.2.3, 2.2.4, Part 22 6.1 Selv Reliability Test Including Hazardous Voltage Measurements2.4.1, 2.4.2 Limited Current Circuit Measurement2.5 Limited Power Source Measurement2.6.3.4, 2.6.1 Protective Bonding I2.6.3.4, 2.6.1 Protective Bonding II2.9.1, 2.9.2, 5.2.2 Humidity2.10.2 Determination Of Working Voltage; Working Voltage Measurement2.10.5.9, 2.10.5.10, 2.10.5.6 Thin Sheet Material Tests2.10.5.6, 2.10.5.13 Transformer And Wire Insulation Electric Strength Test3.2.6, 4.2.1, 4.2.7 Strain Relief4.1 Stability4.2.1 - 4.2.4 Steady Force4.2.5, 4.2.1, Part 22 10.2 Impact4.2.6, 4.2.1 Drop4.2.7, 4.2.1 Stress Relief4.3.2 Knob Pull/Handle Loading4.5.1, 1.4.12, 1.4.13 Heating4.5.5, 4.5 Ball Pressure5.1, Annex D Touch Current (Single-Phase; TN/TT System)5.1, Annex D Touch Current (Polyphase; TN/TT System)5.1, Annex D IT Touch Current (Single-Phase)5.2.2 Electric Strength5.3.1, 5.3.4, 5.3.7 Component Failure5.3.1 - 5.3.9 Abnormal Operation5.3.3, 5.3.7b, Annex C.1 Transformer Abnormal Operation5.3.7 Power Supply Output Short-Circuit/OverloadAnnex B.7 Locked-Rotor Overload for DC Motors in Secondary Circuits
2020-12-07

OFF

1.2.2.1 Guide Information Page - Maximum Output Voltage, Current, and Volt Ampere Measurement1.6.2 Input: Single-Phase1.6.2 Input: Polyphase1.7.11 Durability of Marking2.1.1.1, 2.8.2, Part 21 4.2 Access To Energized Parts Test2.1.1.5, 2.1.2, 1.2.8.10 Energy Hazard Measurements2.1.1.7 Capacitance Discharge2.2.2, 2.2.3, 2.2.4, Part 22 6.1 Selv Reliability Test Including Hazardous Voltage Measurements2.4.1, 2.4.2 Limited Current Circuit Measurement2.5 Limited Power Source Measurement2.6.3.4, 2.6.1 Protective Bonding I2.6.3.4, 2.6.1 Protective Bonding II2.9.1, 2.9.2, 5.2.2 Humidity2.10.2 Determination Of Working Voltage; Working Voltage Measurement2.10.5.9, 2.10.5.10, 2.10.5.6 Thin Sheet Material Tests2.10.5.6, 2.10.5.13 Transformer And Wire Insulation Electric Strength Test3.2.6, 4.2.1, 4.2.7 Strain Relief4.1 Stability4.2.1 - 4.2.4 Steady Force4.2.5, 4.2.1, Part 22 10.2 Impact4.2.6, 4.2.1 Drop4.2.7, 4.2.1 Stress Relief4.3.2 Knob Pull/Handle Loading4.5.1, 1.4.12, 1.4.13 Heating4.5.5, 4.5 Ball Pressure5.1, Annex D Touch Current (Single-Phase; TN/TT System)5.1, Annex D Touch Current (Polyphase; TN/TT System)5.1, Annex D IT Touch Current (Single-Phase)5.2.2 Electric Strength5.3.1, 5.3.4, 5.3.7 Component Failure5.3.1 - 5.3.9 Abnormal Operation5.3.3, 5.3.7b, Annex C.1 Transformer Abnormal Operation5.3.7 Power Supply Output Short-Circuit/OverloadAnnex B.7 Locked-Rotor Overload for DC Motors in Secondary Circuits
2020-12-07

OFF

1.2.2.1 Guide Information Page - Maximum Output Voltage, Current, and Volt Ampere Measurement1.6.2 Input: Single-Phase1.6.2 Input: Polyphase1.7.11 Durability of Marking2.1.1.1, 2.8.2, Part 21 4.2 Access To Energized Parts Test2.1.1.5, 2.1.2, 1.2.8.10 Energy Hazard Measurements2.1.1.7 Capacitance Discharge2.2.2, 2.2.3, 2.2.4, Part 22 6.1 Selv Reliability Test Including Hazardous Voltage Measurements2.4.1, 2.4.2 Limited Current Circuit Measurement2.5 Limited Power Source Measurement2.6.3.4, 2.6.1 Protective Bonding I2.6.3.4, 2.6.1 Protective Bonding II2.9.1, 2.9.2, 5.2.2 Humidity2.10.2 Determination Of Working Voltage; Working Voltage Measurement2.10.5.9, 2.10.5.10, 2.10.5.6 Thin Sheet Material Tests2.10.5.6, 2.10.5.13 Transformer And Wire Insulation Electric Strength Test3.2.6, 4.2.1, 4.2.7 Strain Relief4.1 Stability4.2.1 - 4.2.4 Steady Force4.2.5, 4.2.1, Part 22 10.2 Impact4.2.6, 4.2.1 Drop4.2.7, 4.2.1 Stress Relief4.3.2 Knob Pull/Handle Loading4.5.1, 1.4.12, 1.4.13 Heating4.5.5, 4.5 Ball Pressure5.1, Annex D Touch Current (Single-Phase; TN/TT System)5.1, Annex D Touch Current (Polyphase; TN/TT System)5.1, Annex D IT Touch Current (Single-Phase)5.2.2 Electric Strength5.3.1, 5.3.4, 5.3.7 Component Failure5.3.1 - 5.3.9 Abnormal Operation5.3.3, 5.3.7b, Annex C.1 Transformer Abnormal Operation5.3.7 Power Supply Output Short-Circuit/OverloadAnnex B.7 Locked-Rotor Overload for DC Motors in Secondary Circuits
2020-12-07