Delta Electronics (Thailand) Public Co. Ltd.

Address(es)
  • 919, Moo 3, Tambol Phraksa-Mai, Amphur Muang
    Samutprakarn 10280
    Thailand

Website Not available
Status

MEMBER

Acceptance date 2024-02-26

Further information

Stage

Country

Name

2

Canada

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

Accepted test clauses,4.4.3.2, ANNEX T.4 – STEADY FORCE TEST, 100 N 4.4.3.2, ANNEX T.5 – STEADY FORCE TEST, 250 N 4.4.3.2, ANNEX T.3 – STEADY FORCE TEST, 30 N 4.4.3.3, ANNEX T.7 – DROP TEST 4.4.3.4, ANNEX T.6, ANNEX Y.6.2 – IMPACT TEST 4.4.3.8, ANNEX T.8 – STRESS RELIEF TEST 5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES 5.4.1.3 – TEST FOR HYGROSCOPIC MATERIALS 5.4.1.5.2, 5.4.1.5.3 – TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR AN INSULATING COMPOUND 5.4.1.8 – DETERMINATION OF WORKING VOLTAGE 5.4.1.10.3 – BALL PRESSURE TEST 5.4.2.4 – MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST 5.4.4.6.2 – SEPARABLE THIN SHEET MATERIAL 5.4.7, 5.4.1.5.3 – TESTS FOR SEMICONDUCTOR COMPONENTS AND CEMENTED JOINTS 5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION 5.4.11.3 – TEST FOR SEPARATION BETWEEN EXTERNAL CIRCUITS AND EARTH 5.5.2.2 – CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR 5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM 5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS 5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS 5.7.6 – PROTECTIVE CONDUCTOR CURRENT 5.7.7 – SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS 6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS 6.2.3.1 – ARCING PIS DETERMINATION 6.2.3.2 – RESISTIVE PIS DETERMINATION 6.6 – TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION 8.5.3, ANNEX T.8, ANNEX V – ACCESSIBILITY TO MOVING PARTS 8.7 – WALL, CEILING, OR OTHER STRUCTURE MOUNTING TESTS 8.8 – HANDLE STRENGTH B.2.5 – INPUT TEST: SINGLE PHASE B.2.5 – INPUT TEST: POLYPHASE B.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT B.3 – SIMULATED ABNORMAL OPERATING CONDITIONS B.4 – SIMULATED SINGLE FAULT CONDITIONS ANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGS ANNEX G.5.3.3 – TRANSFORMER OVERLOAD ANNEX G.5.4.6 – LOCKED-ROTOR OVERLOAD TEST FOR DC MOTORS ANNEX G.5.4.6.3 – ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FOR DC MOTORS ANNEX G.7.3.2 – CORD STRAIN RELIEF TEST ANNEX G.10.3 – RESISTOR TEST, G.10.2 - CONDITIONING ANNEX G.10.6 – OVERLOAD TEST- FOR RESISTORS USED AS A CAPACITOR DISCHARGE SAFEGUARD Q.1 – LIMITED POWER SOURCE ANNEX R.1 – LIMITED SHORT CIRCUIT TEST
2021-02-08

ITAV

Accepted test clauses,5.2, 5.7 - CLASSIFICATION OF ELECTRICAL ENERGY SOURCES 5.2.1.1 - ACCESSIBLE ES1 CIRCUITS SEPARATED FROM OTHER ES CIRCUITS USING COMPONENTS 5.4.1.10.3 - BALL PRESSURE TEST 5.4.1.3 - TEST FOR HYGROSCOPIC MATERIALS 5.4.1.4, 9.2, B.1.6 , B.2.6 - HEATING 5.4.1.4, ANNEX B.2 - MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS 5.4.1.5.2 - TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR AN INSULATING COMPOUND 5.4.1.8 - DETERMINATION OF WORKING VOLTAGE 5.4.2.4 - MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST 5.4.4.6.2 - SEPARABLE THIN SHEET MATERIAL 5.4.8 - HUMIDITY CONDITIONING 5.4.9 - ELECTRIC STRENGTH 5.4.11.3 - TEST FOR SEPARATION BETWEEN EXTERNAL CIRCUITS AND EARTH 5.5.2.2 - SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR 5.6.4, ANNEX R - PROTECTIVE BONDING CONDUCTORS: LIMITED SHORT CIRCUIT TEST 5.6.6.2 A) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: 25 A OR LESS 5.6.6.2 B) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: EXCEEDING 25 A 5.6.6.2 C) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: ALTERNATIVE TO 5.6.6.2 B) 5.6.6.2 D) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: DC MIANS 5.6.6.2 E) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: EXTERNAL CIRCUIT 5.7 - PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT 5.7.4 - EARTHED ACCESSIBLE CONDUCTIVE PARTS 5.7.5 - PROTECTIVE CONDUCTOR CURRENT 5.7.7 A) - SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS: EARTHED EXTERNAL CIRCUIT 5.7.7 B) - SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS: NO REFERENCE TO PROTECTIVE EARTH 6.2.2.2 - POWER MEASUREMENT: WORST-CASE FAULT 6.2.2.2, 6.2.2.3 - POWER MEASUREMENTS 6.2.2.3 - POWER MEASUREMENT: WORST-CASE POWER SOURCE FAULT 6.2.3.1 - ARCING PIS DETERMINATION 6.2.3.2 - RESISTIVE PIS DETERMINATION 6.5.3, 6.6, ANNEX Q.1 - LIMITED POWER SOURCE 6.6 - TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION 6.6 - TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION - WORST-CASE FAULT 6.6 - TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION - WORST-CASE POWER SOURCE FAULT 8.5.3, ANNEX T.8, ANNEX V - ACCESSIBILITY TO MOVING PARTS 8.7 - WALL OR CEILING MOUNTING TESTS 8.8 - HANDLE STRENGTH 9.2.5 - TOUCH TEMPERATURE TEST: ABNORMAL OPERATING CONDITIONS 9.2.5 - TOUCH TEMPERATURE TEST: NORMAL OPERATING CONDITIONS ANNEX B.2.5 - INPUT TEST: POLYPHASE ANNEX B.2.5 - INPUT TEST: SINGLE PHASE ANNEX B.2.6 - NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT ANNEX B.3 - SIMULATED ABNORMAL OPERATING CONDITIONS ANNEX B.3.2 - SIMULATED ABNORMAL OPERATING CONDITIONS: COVERING OF VENTILATION OPENINGS ANNEX B.3.3 - SIMULATED ABNORMAL OPERATING CONDITIONS: DC MAINS POLARITY ANNEX B.3.4 - SIMULATED ABNORMAL OPERATING CONDITIONS: SETTING OF VOLTAGE SELECTOR ANNEX B.3.5 - SIMULATED ABNORMAL OPERATING CONDITIONS: MAXIMUM LOAD AT OUTPUT TERMINALS ANNEX B.3.6 - SIMULATED ABNORMAL OPERATING CONDITIONS: REVERSE BATTERY POLARITY ANNEX B.4 - SIMULATED SINGLE FAULT CONDITIONS ANNEX B.4.1, B.4.4, B.4.5, B.4.6 - SIMULATED SINGLE FAULT CONDITIONS: BLOCKED MOTOR ANNEX B.4.7 - SIMULATED SINGLE FAULT CONDITIONS CONTINUOUS OPERATION OF COMPONENTS ANNEX F.3.10 - TEST FOR THE PERMANENCE OF MARKINGS ANNEX G.5.3.3 - TRANSFORMER OVERLOAD ANNEX G.5.3.3.3 - TRANSFORMER OVERLOAD – ALTERNATIVE TEST METHOD ANNEX G.7.3.2 - STRAIN RELIEF TEST 4.4.4.2, ANNEX T.2 - STEADY FORCE TEST, 10N 4.4.4.2, 4.4.4.5, ANNEX T.2 - T.5 - STEADY FORCE TEST (10N, 30N, 100N, 250N) 4.4.4.2, ANNEX T.5 - STEADY FORCE TEST (250N) 4.4.4.4, ANNEX T.6 - ENCLOSURE IMPACT TEST 4.4.4.3, ANNEX T.7 – DROP TEST 4.4.4.7, ANNEX T.8 - STRESS RELIEF TEST ANNEX T.8 (4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4) - STRESS RELIEF – ALTERNATE TEST PER IEC 60695-10-3
2018-01-24

OFF

Accepted test clauses,1.2.2.1 Guide Information Page - Maximum Output Voltage, Current, and Volt Ampere Measurement 1.6.2 Input: Single-Phase 1.6.2 Input: Polyphase 1.7.11 Durability of Marking 2.1.1.1, 2.8.2, Part 21 4.2 Access To Energized Parts Test 2.1.1.5, 2.1.2, 1.2.8.10 Energy Hazard Measurements 2.1.1.7 Capacitance Discharge 2.2.2, 2.2.3, 2.2.4, Part 22 6.1 Selv Reliability Test Including Hazardous Voltage Measurements 2.4.1, 2.4.2 Limited Current Circuit Measurement 2.5 Limited Power Source Measurement 2.6.3.4, 2.6.1 Protective Bonding I 2.6.3.4, 2.6.1 Protective Bonding II 2.9.1, 2.9.2, 5.2.2 Humidity 2.10.2 Determination Of Working Voltage; Working Voltage Measurement 2.10.5.9, 2.10.5.10, 2.10.5.6 Thin Sheet Material Tests 2.10.5.6, 2.10.5.13 Transformer And Wire Insulation Electric Strength Test 3.2.6, 4.2.1, 4.2.7 Strain Relief 4.1 Stability 4.2.1 - 4.2.4 Steady Force 4.2.5, 4.2.1, Part 22 10.2 Impact 4.2.6, 4.2.1 Drop 4.2.7, 4.2.1 Stress Relief 4.3.2 Knob Pull/Handle Loading 4.5.1, 1.4.12, 1.4.13 Heating 4.5.5, 4.5 Ball Pressure 5.1, Annex D Touch Current (Single-Phase; TN/TT System) 5.1, Annex D Touch Current (Polyphase; TN/TT System) 5.1, Annex D IT Touch Current (Single-Phase) 5.2.2 Electric Strength 5.3.1, 5.3.4, 5.3.7 Component Failure 5.3.1 - 5.3.9 Abnormal Operation 5.3.3, 5.3.7b, Annex C.1 Transformer Abnormal Operation 5.3.7 Power Supply Output Short-Circuit/Overload Annex B.7 Locked-Rotor Overload for DC Motors in Secondary Circuit
2018-01-24

OFF

Accepted test clauses,1.2.2.1 Guide Information Page - Maximum Output Voltage, Current, and Volt Ampere Measurement 1.6.2 Input: Single-Phase 1.6.2 Input: Polyphase 1.7.11 Durability of Marking 2.1.1.1, 2.8.2, Part 21 4.2 Access To Energized Parts Test 2.1.1.5, 2.1.2, 1.2.8.10 Energy Hazard Measurements 2.1.1.7 Capacitance Discharge 2.2.2, 2.2.3, 2.2.4, Part 22 6.1 Selv Reliability Test Including Hazardous Voltage Measurements 2.4.1, 2.4.2 Limited Current Circuit Measurement 2.5 Limited Power Source Measurement 2.6.3.4, 2.6.1 Protective Bonding I 2.6.3.4, 2.6.1 Protective Bonding II 2.9.1, 2.9.2, 5.2.2 Humidity 2.10.2 Determination Of Working Voltage; Working Voltage Measurement 2.10.5.9, 2.10.5.10, 2.10.5.6 Thin Sheet Material Tests 2.10.5.6, 2.10.5.13 Transformer And Wire Insulation Electric Strength Test 3.2.6, 4.2.1, 4.2.7 Strain Relief 4.1 Stability 4.2.1 - 4.2.4 Steady Force 4.2.5, 4.2.1, Part 22 10.2 Impact 4.2.6, 4.2.1 Drop 4.2.7, 4.2.1 Stress Relief 4.3.2 Knob Pull/Handle Loading 4.5.1, 1.4.12, 1.4.13 Heating 4.5.5, 4.5 Ball Pressure 5.1, Annex D Touch Current (Single-Phase; TN/TT System) 5.1, Annex D Touch Current (Polyphase; TN/TT System) 5.1, Annex D IT Touch Current (Single-Phase) 5.2.2 Electric Strength 5.3.1, 5.3.4, 5.3.7 Component Failure 5.3.1 - 5.3.9 Abnormal Operation 5.3.3, 5.3.7b, Annex C.1 Transformer Abnormal Operation 5.3.7 Power Supply Output Short-Circuit/Overload Annex B.7 Locked-Rotor Overload for DC Motors in Secondary Circuit
2018-01-24

OFF

Accepted test clauses,1.2.2.1 Guide Information Page - Maximum Output Voltage, Current, and Volt Ampere Measurement 1.6.2 Input: Single-Phase 1.6.2 Input: Polyphase 1.7.11 Durability of Marking 2.1.1.1, 2.8.2, Part 21 4.2 Access To Energized Parts Test 2.1.1.5, 2.1.2, 1.2.8.10 Energy Hazard Measurements 2.1.1.7 Capacitance Discharge 2.2.2, 2.2.3, 2.2.4, Part 22 6.1 Selv Reliability Test Including Hazardous Voltage Measurements 2.4.1, 2.4.2 Limited Current Circuit Measurement 2.5 Limited Power Source Measurement 2.6.3.4, 2.6.1 Protective Bonding I 2.6.3.4, 2.6.1 Protective Bonding II 2.9.1, 2.9.2, 5.2.2 Humidity 2.10.2 Determination Of Working Voltage; Working Voltage Measurement 2.10.5.9, 2.10.5.10, 2.10.5.6 Thin Sheet Material Tests 2.10.5.6, 2.10.5.13 Transformer And Wire Insulation Electric Strength Test 3.2.6, 4.2.1, 4.2.7 Strain Relief 4.1 Stability 4.2.1 - 4.2.4 Steady Force 4.2.5, 4.2.1, Part 22 10.2 Impact 4.2.6, 4.2.1 Drop 4.2.7, 4.2.1 Stress Relief 4.3.2 Knob Pull/Handle Loading 4.5.1, 1.4.12, 1.4.13 Heating 4.5.5, 4.5 Ball Pressure 5.1, Annex D Touch Current (Single-Phase; TN/TT System) 5.1, Annex D Touch Current (Polyphase; TN/TT System) 5.1, Annex D IT Touch Current (Single-Phase) 5.2.2 Electric Strength 5.3.1, 5.3.4, 5.3.7 Component Failure 5.3.1 - 5.3.9 Abnormal Operation 5.3.3, 5.3.7b, Annex C.1 Transformer Abnormal Operation 5.3.7 Power Supply Output Short-Circuit/Overload Annex B.7 Locked-Rotor Overload for DC Motors in Secondary Circuit
2018-01-24