Delta Electronics Inc (DEKRA508)

Address(es)
  • Delta Electronics Inc
    No. 268 Shangying Road, Guishan Dist., Taoyuan City 33341, Taiwan
    Taoyuan 33341
    China

WebsiteNot available
Status

MEMBER

Acceptance date 2019-12-17

Further information

Stage

Country

Name

2

Netherlands

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

BATT

7.2.1 External Short-Circuit Test (Cell) 7.2.3.2 Whole Drop Test 7.2.3.3 Edge & Corner Drop Test 7.2.4 Thermal Abuse Test (Cell) 7.2.5 Overcharge Test (Cell) 7.2.6 Forced Discharge Test (Cell) 7.3.2 Internal Short-Circuit Test (Cell) 7.3.3 Propagation Test 8.2.2 Overcharge Control of Voltage Test 8.2.3 Overcharge Control of Current Test 8.2.4 Overheating Control Test
2023-05-11

BATT

7.2.1 External Short-Circuit Test (Cell) 7.2.3.2 Whole Drop Test 7.2.3.3 Edge & Corner Drop Test 7.2.4 Thermal Abuse Test (Cell) 7.2.5 Overcharge Test (Cell) 7.2.6 Forced Discharge Test (Cell) 7.3.2 Internal Short-Circuit Test (Cell) 7.3.3 Propagation Test 8.2.2 Overcharge Control of Voltage Test 8.2.3 Overcharge Control of Current Test 8.2.4 Overheating Control Test
2019-12-17

INST

5.2.2.1 Clearance and creepage distance test5.2.2.4.2 Deflection test, 5.2.2.4.2.2&5.2.2.4.2.3 steady force test, 5.2.2.4.3 impact test, 5.2.2.4.4 Drop test, 5.2.2.4.5 stress relief test, 5.2.2.5 stability test, 5.2.3.4 ac. Or dc voltage test, 5.2.3.10 temperature rise test , 5.2.3.11 protective equipotential bonding test, 5.2.4.4 output short circuit test, 5.2.4.5 output overload test, 5.2.4.6 break down of components test
2021-11-08

ITAV

5.6.6 resistance of the protective bonding system, 6.2 classification of power source and potential ignition source, 8.8 handle strength, B.2.5 input test, B.2.6 operating temperature measurement conditions B2.7 battery charging and discharging under normal operating conditions B.3.2 Covering of ventilation openings, B.3.5 Maximum load at output terminals , B.4.5 Short-circuit and interruption of electrodes in tubes and semiconductor , B.4.6 Short-circuit or disconnection of passive components, B.4.9 Battery charging and discharging under single fault conditions, T.2 Steady force test, 10N, T.5 Steady force test 250N, T.6 enclosure impact test, T.7 Drop test
2019-12-17