Delta Electronics, Inc.

Address(es)
  • 39 Sec 2 Huandong RD SHANHUA DISTRICT Tainan City
    TW-74144 Tainan City
    Chinese Taipei

Website Not available
Status

MEMBER

Acceptance date 2010-06-02

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, ANNEX T.3 - STEADY FORCE TEST, 30 N4.4.3.2, ANNEX T.4 - STEADY FORCE TEST, 100 N4.4.3.2, ANNEX T.5 - STEADY FORCE TEST, 250 N4.4.3.3, ANNEX T.7 - DROP TEST4.4.3.4, ANNEX T.6 - IMPACT TEST4.4.3.8, ANNEX T.8 - STRESS RELIEF TEST4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: MOMENT TEST4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: BLADE SECUREMENT TEST4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: SECURITY OF INPUT CONTACTS4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: RESISTANCE TO CRUSHING4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: ROD PRESSURE TEST4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: INPUT BLADE ENDURANCE (RETRACTABLE BLADES)5.2.2.1 - 5.2.2.6 - CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.3 – TEST FOR HYGROSCOPIC MATERIALS5.4.1.8 - DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 - BALL PRESSURE TEST5.4.2.4 - MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST5.4.4.6.2 - SEPARABLE THIN SHEET MATERIAL5.4.9.1 - ELECTRIC STRENGTH TEST5.5.2.2 - SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.5.8 - INSULATION BETWEEN THE MAINS AND AN EXTERNAL CIRCUIT CONSISTING OF A COAXIAL CABLE5.6.6.2 - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS5.7.6 - PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 - POWER MEASUREMENTS6.2.3.1 - ARCING PIS DETERMINATION6.2.3.2 - RESISTIVE PIS DETERMINATION6.6 - TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION8.5.3, ANNEX T.8, ANNEX V - ACCESSIBILITY TO MOVING PARTS8.7 - WALL, CEILING, OR OTHER STRUCTURE MOUNTING TESTS8.8 - HANDLE STRENGTHB.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.2.5 - INPUT TEST: SINGLE PHASEB.2.5 - INPUT TEST: POLYPHASEB.3 - SIMULATED ABNORMAL OPERATING CONDITIONSB.4 - SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 - TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 - TRANSFORMER OVERLOADANNEX G.5.3.3.3 - TRANSFORMER OVERLOAD – ALTERNATIVE TEST METHODANNEX G.5.4.6.3 - ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSANNEX G.7.3.2 – CORD STRAIN RELIEF TESTANNEX G.10.3 - RESISTOR TEST, G.10.2 - CONDITIONINGANNEX G.13.6 - TESTS ON COATED PRINTED WIRING BOARDS AND COATED COMPONENTS (CONFORMAL COATINGS)ANNEX G.14 - COATINGS ON COMPONENT TERMINALSANNEX G.16 - IC INCLUDING CAPACITOR DISCHARGE FUNCTION (ICX)ANNEX P.2.3.2 - CONSEQUENCE OF ENTRY TESTANNEX Q.1 - LIMITED POWER SOURCEANNEX T.2, 5.4.2.6, 5.4.3.2, G.15.2.6 - STEADY FORCE TEST, 10 N
2022-12-20

ITAV

4.4.4.2, ANNEX T.3 - STEADY FORCE TEST, 30 N4.4.4.2, ANNEX T.4 - STEADY FORCE TEST, 100 N4.4.4.2, ANNEX T.5 - STEADY FORCE TEST, 250 N4.4.4.3, ANNEX T.7 - DROP TEST4.4.4.4, ANNEX T.6 - IMPACT TEST4.4.4.7, ANNEX T.8 - STRESS RELIEF TEST4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: MOMENT TEST4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: BLADE SECUREMENT TEST4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: SECURITY OF INPUT CONTACTS4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: RESISTANCE TO CRUSHING4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: ROD PRESSURE TEST4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: INPUT BLADE ENDURANCE (RETRACTABLE BLADES)5.2, 5.7 - CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.4, Annex B.2 - MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.8 - DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 - BALL PRESSURE TEST5.4.2.4 - MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST5.4.4.6.2 - SEPARABLE THIN SHEET MATERIAL5.4.8 - HUMIDITY CONDITIONING5.4.9 - ELECTRIC STRENGTH TEST5.5.2.2 - SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.5.8 - INSULATION BETWEEN THE MAINS AND AN EXTERNAL CIRCUIT CONSISTING OF A COAXIAL CABLE5.6.6.2(a) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 - PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 - PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 - POWER MEASUREMENTS6.2.3.1 - ARCING PIS DETERMINATION6.2.3.2 - RESISTIVE PIS DETERMINATION6.3 - NORMAL OPERATING CONDITIONS TEMPERATURE TEST6.4.3, ANNEX B.4- REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS6.4.3.3 - REDUCTION OF THE LIKELIHOOD OF IGNITION - TEMPERATURES LIMITED BY FUSES6.6 - TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION8.5.3, ANNEX T.8, ANNEX V - ACCESSIBILITY TO MOVING PARTS8.7 - WALL OR CEILING MOUNTING TESTS8.8 - HANDLE STRENGTHB.2.5 - INPUT TEST: SINGLE PHASEB.2.5 - INPUT TEST: POLYPHASEB.2.6 - NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 - SIMULATED ABNORMAL OPERATING CONDITIONSB.4 - SIMULATED SINGLE FAULT CONDITIONS6.4.2, ANNEX B.4 - SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITIONANNEX F.3.10 - TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 - TRANSFORMER OVERLOADANNEX G.5.3.3.3 - TRANSFORMER OVERLOAD – ALTERNATIVE TEST METHODANNEX G.5.4.6.3 - ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSANNEX G.7.3.2 - STRAIN RELIEF TESTANNEX G.10.2 - RESISTOR TESTANNEX G.13.6 - TESTS ON COATED PRINTED WIRING BOARDS AND COATED COMPONENTS (CONFORMAL COATINGS)ANNEX G.14 - COATINGS ON COMPONENT TERMINALSANNEX G.16 - IC INCLUDING CAPACITOR DISCHARGE FUNCTION (ICX)ANNEX P.2.3.2 - CONSEQUENCE OF ENTRY TESTANNEX Q.1 - LIMITED POWER SOURCEANNEX T.2, 5.4.2.6, 5.4.3.2, G.15.3.6 - STEADY FORCE TEST, 10 N
2018-10-17

OFF

1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT‑AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE-PHASE1.6.2 - INPUT TEST: POLYPHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.1.1.7 - CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 - SELV RELIABILITY TES2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4 - LIMITED SHORT-CIRCUIT TEST2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.6.4.1, 3.3.1 - ENGAGEMENT-DISENGAGEMENT TEST2.7 - DC CIRCUIT FUSE TEST2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST2.10.2 - DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST2.10.2 - DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE TEST2.10.5.8, ANNEX AA - MANDREL TEST FOR NON-SEPARABLE THIN SHEET MATERIAL2.10.5.9, 2.10.5.10, 2.10.5.6 - THIN SHEET MATERIAL TESTS2.10.5.13 - Transformer and Wire /Insulation Electric Strength2.10.8, 2.10.9 - TESTS ON COATED PRINTED WIRING BOARDS AND COATED COMPONENTS (CONFORMAL COATINGS)2.10.10, 2.10.9 - TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR INSULATING COMPOUND2.10.11, 2.10.9 - TESTS FOR SEMICONDUCTOR DEVICES AND FOR CEMENTED JOINTS3.2.6, 4.2.1, 4.2.7 - STRAIN RELIEF TEST4.1 - STABILITY TESTS4.2.1 - 4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22 10.2 - IMPACT TEST4.2.6, 4.2.1 - DROP TEST4.2.7, 4.2.1 - STRESS RELIEF TEST4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.2.11.1 - RACK MOUNTED EQUIPMENT - MECHANICAL STRENGTH TESTS4.3.1 - SHARP EDGE TEST4.3.2 - KNOB PULL/HANDLE LOADING TEST4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST4.3.6 - DIRECT PLUG IN EQUIPMENT-MOMENT TEST4.3.8 - BATTERY TESTS4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.4.2, 4.4.4 - HAZARDOUS MOVING PARTS TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST4.5.5, 4.5 - BALL PRESSURE TEST4.6.5 - BARRIER ADHESIVE TEST5.1, ANNEX D - TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.1, ANNEX D - TOUCH CURRENT TEST (POLYPHASE; TN/TT SYSTEM)5.1, ANNEX D - IT TOUCH CURRENT TEST (SINGLE-PHASE)5.2.2 - ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.1, 5.3.9 - ABNORMAL OPERATION TESTS5.3.3, 5.3.7b, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST5.3.7 - POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TESTANNEX B, B.8 - INPUT TEST: SINGLE PHASEANNEX B.4 - RUNNING OVERLOAD TESTANNEX B.5, B.8 - LOCKED‐ROTOR OVERLOAD AND ENDURANCE TESTSANNEX B.7 - LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2018-10-17

OFF

1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT‑AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE-PHASE1.6.2 - INPUT TEST: POLYPHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.1.1.7 - CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 - SELV RELIABILITY TES2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4 - LIMITED SHORT-CIRCUIT TEST2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.6.4.1, 3.3.1 - ENGAGEMENT-DISENGAGEMENT TEST2.7 - DC CIRCUIT FUSE TEST2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST2.10.2 - DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST2.10.2 - DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE TEST2.10.5.8, ANNEX AA - MANDREL TEST FOR NON-SEPARABLE THIN SHEET MATERIAL2.10.5.9, 2.10.5.10, 2.10.5.6 - THIN SHEET MATERIAL TESTS2.10.5.13 - Transformer and Wire /Insulation Electric Strength2.10.8, 2.10.9 - TESTS ON COATED PRINTED WIRING BOARDS AND COATED COMPONENTS (CONFORMAL COATINGS)2.10.10, 2.10.9 - TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR INSULATING COMPOUND2.10.11, 2.10.9 - TESTS FOR SEMICONDUCTOR DEVICES AND FOR CEMENTED JOINTS3.2.6, 4.2.1, 4.2.7 - STRAIN RELIEF TEST4.1 - STABILITY TESTS4.2.1 - 4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22 10.2 - IMPACT TEST4.2.6, 4.2.1 - DROP TEST4.2.7, 4.2.1 - STRESS RELIEF TEST4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.2.11.1 - RACK MOUNTED EQUIPMENT - MECHANICAL STRENGTH TESTS4.3.1 - SHARP EDGE TEST4.3.2 - KNOB PULL/HANDLE LOADING TEST4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST4.3.6 - DIRECT PLUG IN EQUIPMENT-MOMENT TEST4.3.8 - BATTERY TESTS4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.4.2, 4.4.4 - HAZARDOUS MOVING PARTS TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST4.5.5, 4.5 - BALL PRESSURE TEST4.6.5 - BARRIER ADHESIVE TEST5.1, ANNEX D - TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.1, ANNEX D - TOUCH CURRENT TEST (POLYPHASE; TN/TT SYSTEM)5.1, ANNEX D - IT TOUCH CURRENT TEST (SINGLE-PHASE)5.2.2 - ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.1, 5.3.9 - ABNORMAL OPERATION TESTS5.3.3, 5.3.7b, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST5.3.7 - POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TESTANNEX B, B.8 - INPUT TEST: SINGLE PHASEANNEX B.4 - RUNNING OVERLOAD TESTANNEX B.5, B.8 - LOCKED‐ROTOR OVERLOAD AND ENDURANCE TESTSANNEX B.7 - LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2018-10-17

OFF

1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT‑AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE-PHASE1.6.2 - INPUT TEST: POLYPHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.1.1.7 - CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 - SELV RELIABILITY TES2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4 - LIMITED SHORT-CIRCUIT TEST2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.6.4.1, 3.3.1 - ENGAGEMENT-DISENGAGEMENT TEST2.7 - DC CIRCUIT FUSE TEST2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST2.10.2 - DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST2.10.2 - DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE TEST2.10.5.8, ANNEX AA - MANDREL TEST FOR NON-SEPARABLE THIN SHEET MATERIAL2.10.5.9, 2.10.5.10, 2.10.5.6 - THIN SHEET MATERIAL TESTS2.10.5.13 - Transformer and Wire /Insulation Electric Strength2.10.8, 2.10.9 - TESTS ON COATED PRINTED WIRING BOARDS AND COATED COMPONENTS (CONFORMAL COATINGS)2.10.10, 2.10.9 - TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR INSULATING COMPOUND2.10.11, 2.10.9 - TESTS FOR SEMICONDUCTOR DEVICES AND FOR CEMENTED JOINTS3.2.6, 4.2.1, 4.2.7 - STRAIN RELIEF TEST4.1 - STABILITY TESTS4.2.1 - 4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22 10.2 - IMPACT TEST4.2.6, 4.2.1 - DROP TEST4.2.7, 4.2.1 - STRESS RELIEF TEST4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.2.11.1 - RACK MOUNTED EQUIPMENT - MECHANICAL STRENGTH TESTS4.3.1 - SHARP EDGE TEST4.3.2 - KNOB PULL/HANDLE LOADING TEST4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST4.3.6 - DIRECT PLUG IN EQUIPMENT-MOMENT TEST4.3.8 - BATTERY TESTS4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.4.2, 4.4.4 - HAZARDOUS MOVING PARTS TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST4.5.5, 4.5 - BALL PRESSURE TEST4.6.5 - BARRIER ADHESIVE TEST5.1, ANNEX D - TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.1, ANNEX D - TOUCH CURRENT TEST (POLYPHASE; TN/TT SYSTEM)5.1, ANNEX D - IT TOUCH CURRENT TEST (SINGLE-PHASE)5.2.2 - ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.1, 5.3.9 - ABNORMAL OPERATION TESTS5.3.3, 5.3.7b, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST5.3.7 - POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TESTANNEX B, B.8 - INPUT TEST: SINGLE PHASEANNEX B.4 - RUNNING OVERLOAD TESTANNEX B.5, B.8 - LOCKED‐ROTOR OVERLOAD AND ENDURANCE TESTSANNEX B.7 - LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2018-10-17

OFF

4.4.7.4 to 4.4.7.5/RD, 4.4.7.8.3.2/RD to 4.4.7.9 4 5.2.2.1 WORKING VOLTAGE MEASUREMENT, CLEARANCES AND CREEPAGE DISTANCES TEST, DISTANCE THROUGH INSULATION MEASUREMENTS:4.4.4.3, 5.2.2.2, RD 5.2.2.3 INGRESS PROTECTION TEST (IP RATING):5.2.2.4.2.2, 5.2.2.4.2.3 STEADY FORCE TEST (30 N and /or 250 N):5.2.2.4.3 IMPACT TEST:5.2.2.4.4 DROP TEST:5.2.2.4.5 STRESS RELIEF TEST:5.2.2.5 STABILITY TEST:5.2.2.6.101 WALL AND CEILING MOUNTED EQUIPMENT TEST:5.2.2.6.102, Annex GG RACK MOUNTED EQUIPMENT test:5.2.2.7 HANDLES AND MANUAL CONTROLS SECUREMENT TEST:5.2.3.2, 5.2.3.3 IMPULS VOLTAGE TEST, ALTERNATE TO IMPULSE VOLTAGE TEST:5.2.3.4.2 AC OR D.C. VOLTAGE TEST:5.2.3.6 PROTECTIVE IMPEDANCE TEST:4.4.5.4 PROTECTIVE IMPEDANCE DISCHARGE ENERGY TEST:5.2.3.7 TOUCH CURRENT MEASUREMENT TEST:5.2.3.8 CAPACITOR DISCHARGE TEST:5.2.3.9 LIMITED POWER SOURCE TEST:5.2.3.10 TEMPERATURE RISE TEST:5.2.3.11.2 PROTECTIVE EQUIPOTENTIAL BONDING IMPEDANCE TEST:5.2.3.101 BACKFEED PROTECTION TEST:5.2.3.102 INPUT CURRENT TEST:5.2.3.104 TRANSFORMER PROTECTION TEST:5.2.3.105 UNSYNCHRONISED LOAD TRANSFER TEST:5.2.4, RD 5.2.4 ABNORMAL OPERATION AND SIMULATED FAULTS TESTS:5.2.4.4 OUTPUT SHORT-CIRCUIT TEST:5.2.4.5 OUTPUT OVERLOAD TEST:5.2.4.6 BREAKDOWN OF COMPONENTS TEST:5.2.4.7 PWB SHORT CIRCUIT TEST:5.2.4.8 LOSS OF PHASE TEST:5.2.4.9 COOLING FAILURE TESTS:5.2.6.3.1 DRY HEAT TEST5.2.6.3.2 DAMP HEAT TESTAnnex CC, CC.4 BATTERY OVERCHARGE TEST
2023-03-21

OFF

4.4.7.4 to 4.4.7.5/RD, 4.4.7.8.3.2/RD to 4.4.7.9 4 5.2.2.1 WORKING VOLTAGE MEASUREMENT, CLEARANCES AND CREEPAGE DISTANCES TEST, DISTANCE THROUGH INSULATION MEASUREMENTS:4.4.4.3, 5.2.2.2, RD 5.2.2.3 INGRESS PROTECTION TEST (IP RATING):5.2.2.4.2.2, 5.2.2.4.2.3 STEADY FORCE TEST (30 N and /or 250 N):5.2.2.4.3 IMPACT TEST:5.2.2.4.4 DROP TEST:5.2.2.4.5 STRESS RELIEF TEST:5.2.2.5 STABILITY TEST:5.2.2.6.101 WALL AND CEILING MOUNTED EQUIPMENT TEST:5.2.2.6.102, Annex GG RACK MOUNTED EQUIPMENT test:5.2.2.7 HANDLES AND MANUAL CONTROLS SECUREMENT TEST:5.2.3.2, 5.2.3.3 IMPULS VOLTAGE TEST, ALTERNATE TO IMPULSE VOLTAGE TEST:5.2.3.4.2 AC OR D.C. VOLTAGE TEST:5.2.3.6 PROTECTIVE IMPEDANCE TEST:4.4.5.4 PROTECTIVE IMPEDANCE DISCHARGE ENERGY TEST:5.2.3.7 TOUCH CURRENT MEASUREMENT TEST:5.2.3.8 CAPACITOR DISCHARGE TEST:5.2.3.9 LIMITED POWER SOURCE TEST:5.2.3.10 TEMPERATURE RISE TEST:5.2.3.11.2 PROTECTIVE EQUIPOTENTIAL BONDING IMPEDANCE TEST:5.2.3.101 BACKFEED PROTECTION TEST:5.2.3.102 INPUT CURRENT TEST:5.2.3.104 TRANSFORMER PROTECTION TEST:5.2.3.105 UNSYNCHRONISED LOAD TRANSFER TEST:5.2.4, RD 5.2.4 ABNORMAL OPERATION AND SIMULATED FAULTS TESTS:5.2.4.4 OUTPUT SHORT-CIRCUIT TEST:5.2.4.5 OUTPUT OVERLOAD TEST:5.2.4.6 BREAKDOWN OF COMPONENTS TEST:5.2.4.7 PWB SHORT CIRCUIT TEST:5.2.4.8 LOSS OF PHASE TEST:5.2.4.9 COOLING FAILURE TESTS:5.2.6.3.1 DRY HEAT TEST5.2.6.3.2 DAMP HEAT TESTAnnex CC, CC.4 BATTERY OVERCHARGE TEST
2023-08-21

OFF

4.4.7.4 to 4.4.7.5/RD, 4.4.7.8.3.2/RD to 4.4.7.9 4 5.2.2.1 WORKING VOLTAGE MEASUREMENT, CLEARANCES AND CREEPAGE DISTANCES TEST, DISTANCE THROUGH INSULATION MEASUREMENTS:4.4.4.3, 5.2.2.2, RD 5.2.2.3 INGRESS PROTECTION TEST (IP RATING):5.2.2.4.2.2, 5.2.2.4.2.3 STEADY FORCE TEST (30 N and /or 250 N):5.2.2.4.3 IMPACT TEST:5.2.2.4.4 DROP TEST:5.2.2.4.5 STRESS RELIEF TEST:5.2.2.5 STABILITY TEST:5.2.2.6.101 WALL AND CEILING MOUNTED EQUIPMENT TEST:5.2.2.6.102, Annex GG RACK MOUNTED EQUIPMENT test:5.2.2.7 HANDLES AND MANUAL CONTROLS SECUREMENT TEST:5.2.3.2, 5.2.3.3 IMPULS VOLTAGE TEST, ALTERNATE TO IMPULSE VOLTAGE TEST:5.2.3.4.2 AC OR D.C. VOLTAGE TEST:5.2.3.6 PROTECTIVE IMPEDANCE TEST:4.4.5.4 PROTECTIVE IMPEDANCE DISCHARGE ENERGY TEST:5.2.3.7 TOUCH CURRENT MEASUREMENT TEST:5.2.3.8 CAPACITOR DISCHARGE TEST:5.2.3.9 LIMITED POWER SOURCE TEST:5.2.3.10 TEMPERATURE RISE TEST:5.2.3.11.2 PROTECTIVE EQUIPOTENTIAL BONDING IMPEDANCE TEST:5.2.3.101 BACKFEED PROTECTION TEST:5.2.3.102 INPUT CURRENT TEST:5.2.3.104 TRANSFORMER PROTECTION TEST:5.2.3.105 UNSYNCHRONISED LOAD TRANSFER TEST:5.2.4, RD 5.2.4 ABNORMAL OPERATION AND SIMULATED FAULTS TESTS:5.2.4.4 OUTPUT SHORT-CIRCUIT TEST:5.2.4.5 OUTPUT OVERLOAD TEST:5.2.4.6 BREAKDOWN OF COMPONENTS TEST:5.2.4.7 PWB SHORT CIRCUIT TEST:5.2.4.8 LOSS OF PHASE TEST:5.2.4.9 COOLING FAILURE TESTS:5.2.6.3.1 DRY HEAT TEST5.2.6.3.2 DAMP HEAT TESTAnnex CC, CC.4 BATTERY OVERCHARGE TEST
2023-08-21

OFF

4.6, 1.6.1/RD, 1.6.2/RD, 1.6.4/RD POWER INTERFACES5.1.1, 2.1.7/RD CAPACITANCE DISCHARGE TEST5.2.1, 2.2/RD SAFETY EXTRA LOW VOLTAGE CIRCUITS – SELV5.2.3 LIMITED CURRENT CIRCUITS5.1.4, ANNEX I BACKFEED PROTECTION5.2.5, 2.5/RD LIMITED POWER SOURCE5.3, 2.6.4/RD EARTHING TEST II5.7 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST7.2, 4.1/RD Stability Tests7.4, 4.5.5/RD Ball pressure test7.7, 4.5/RD TEMPERATURE RISE8.1, 5.1.1/RD GENERAL PROVISIONS FOR EARTH LEAKAGE8.2, 5.2/RD ELECTRIC STRENGTH8.3.2 COMPONENT SHORT AND OPEN CIRCUIT8.3.2 TRANSFORMER ABNORMAL OPERATION8.3 ABNORMAL OPERATING AND FAULT CONDITION8.3.3 CONDITIONS FOR TESTS, FORESEEABLE MISUSE - OUTPUT OVERLOAD ABNORMAL TEST
2019-06-06

OFF

4.6, 1.6.1/RD, 1.6.2/RD, 1.6.4/RD POWER INTERFACES5.1.1, 2.1.7/RD CAPACITANCE DISCHARGE TEST5.2.1, 2.2/RD SAFETY EXTRA LOW VOLTAGE CIRCUITS – SELV5.2.3 LIMITED CURRENT CIRCUITS5.1.4, ANNEX I BACKFEED PROTECTION5.2.5, 2.5/RD LIMITED POWER SOURCE5.3, 2.6.4/RD EARTHING TEST II5.7 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST7.2, 4.1/RD Stability Tests7.4, 4.5.5/RD Ball pressure test7.7, 4.5/RD TEMPERATURE RISE8.1, 5.1.1/RD GENERAL PROVISIONS FOR EARTH LEAKAGE8.2, 5.2/RD ELECTRIC STRENGTH8.3.2 COMPONENT SHORT AND OPEN CIRCUIT8.3.2 TRANSFORMER ABNORMAL OPERATION8.3 ABNORMAL OPERATING AND FAULT CONDITION8.3.3 CONDITIONS FOR TESTS, FORESEEABLE MISUSE - OUTPUT OVERLOAD ABNORMAL TEST
2019-06-06