Delta Electronics, Inc.

Address(es)
  • 3F & 5F No 16-1, No 16-1, 2F & 3F & 4F No 16 Tungyuan Road Zhongli District
    TW-320023 Taoyuan
    Chinese Taipei

Website Not available
Status

MEMBER

Acceptance date 2006-06-13

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, T.3 - STEADY FORCE TEST, 30 N FORSAFEGUARD THAT ACTS AS FIREENCLOSURE/BARRIER ONLY4.4.3.2, T.4 - STEADY FORCE TEST, 100 N4.4.3.2, T.5 - STEADY FORCE TEST, 250 N4.4.3.3, T.7 - DROP TEST4.4.3.4, T.6 - IMPACT TEST4.4.3.8, T.8 - STRESS RELIEF TEST4.8.3 – EQUIPMENT CONTAINING COIN/BUTTONCELL BATTERIES: COMPARTMENT OPENING TORQUETEST4.8.4.2, T.8 – EQUIPMENT CONTAININGCOIN/BUTTON CELL BATTERIES: STRESS RELIEF TEST4.8.4.3 – EQUIPMENT CONTAINING COIN/BUTTONCELL BATTERIES: BATTERY REPLACEMENT TEST4.8.4.4 – EQUIPMENT CONTAINING COIN/BUTTONCELL BATTERIES: DROP TEST4.8.4.5 – EQUIPMENT CONTAINING COIN/BUTTONCELL BATTERIES: IMPACT TEST4.8.5 – EQUIPMENT CONTAINING COIN/BUTTONCELL BATTERIES: COMPLIANCE5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICALENERGY SOURCES5.4.1.3 – TEST FOR HYGROSCOPIC MATERIALS5.4.1.8 - DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 - BALL PRESSURE TEST5.4.2.4 - MINIMUM CLEARANCE BASED UPONELECTRIC STRENGTH TEST5.4.4.6.2 - SEPARABLE THIN SHEET MATERIAL5.5.2.2 - CAPACITOR DISCHARGE AFTERDISCONNECTION OF A CONNECTOR5.5.8 - INSULATION BETWEEN THE MAINS AND ANEXTERNAL CIRCUIT CONSISTING OF A COAXIALCABLE5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTINGOF SOLID INSULATION5.6.6.2 - RESISTANCE OF THE PROTECTIVE BONDINGSYSTEM5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENTMEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 – TOUCH CURRENT MEASUREMENT –EARTHED ACCESSIBLE CONDUCTIVE PARTS –SINGLE-PHASE5.7.5 – TOUCH CURRENT MEASUREMENT –EARTHED ACCESSIBLE CONDUCTIVE PARTS – THREEPHASEEQUIPMENT5.7.6 - PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 - POWER MEASUREMENTS6.2.3.1 - ARCING PIS DETERMINATION6.2.3.2 - RESISTIVE PIS DETERMINATION8.5.5.2 – HIGH PRESSURE LAMPS8.6.2 - STATIC STABILITY8.6.3 - RELOCATION STABILITY TEST8.6.4 - GLASS SLIDE TEST8.6.5 - HORIZONTAL FORCE TEST8.7 – WALL, CEILING, OR OTHER STRUCTUREMOUNTING TESTS8.8 - HANDLE STRENGTH8.9 - WHEEL OR CASTER SECUREMENT8.10.3 – CART, STAND OR CARRIER LOADING8.10.4 – CART, STAND OR CARRIER IMPACT8.10.5 – CART, STAND OR CARRIER MECHANICALSTABILITY8.10.6, T.8 – CART, STAND OR CARRIERTHERMOPLASTIC TEMPERATURE STABILITYB.2.5 – INPUT TEST: POLYPHASEB.2.5 – INPUT TEST: PRODUCTS CONTAINING ANAUDIO AMPLIFIERB.2.5 – INPUT TEST: TELEVISIONRECEIVERS/MONITORSB.2.5 - INPUT TEST: SINGLE PHASEB.2.6, 5.4.1.4, 6.3, 9.3, B.1.5 – NORMAL OPERATINGCONDITIONS TEMPERATURE MEASUREMENTB.3 - SIMULATED ABNORMAL OPERATINGCONDITIONSB.4 - SIMULATED SINGLE FAULT CONDITIONSF.3.10 – TEST FOR THE PERMANENCE OF MARKINGSG.5.4.6 - LOCKED-ROTOR OVERLOAD TEST FOR DCMOTORSG.5.4.6.3 - ALTERNATIVE LOCKED-ROTOROVERLOAD TEST FOR DC MOTORSG.7.3.2 - CORD STRAIN RELIEF TESTG.10.2, G.10.3 - CONDITIONING AND RESISTOR TESTG.16 - IC INCLUDING CAPACITOR DISCHARGEFUNCTION (ICX)M.3.2 – PROTECTION CIRCUITS FOR BATTERIESP.2.3.2 - CONSEQUENCE OF ENTRY TESTQ.1 - LIMITED POWER SOURCE
2021-01-07

ITAV

4.2 INPUT TEST FOR APPARATUS NOTEMPLOYING SIGNAL INPUTS AND NOTCONTAINING AN AUDIO AMPLIFIERFAULT CONDITIONS - GENERAL4.3.2, 4.3.3, 4.3.5 FAULT CONDITIONS - CLEARANCEAND CREEPAGE, INSULATING MATERIALS ANDELECTRONIC COMPONENTS4.3.10 FAULT CONDITIONS - OUTPUTTERMINAL OVERLOAD4.3.11 FAULT CONDITIONS - VENTILATIONOPENINGS BLOCKED11 DIELECTRIC STRENGTH AFTER FAULT CONDITIONS11.1 TOUCH CURRENT AFTER FAULTCONDITIONS 5 MARKING DURABILITY ANDLEGIBILITY7 HEATING UNDER NORMAL OPERATING CONDITIONS8.8 WINDING INSULATION TEST9.1.1 TOUCH CURRENT9.1.6 WITHDRAWAL OF MAINS PLUGENCLOSURE RESISTANCE TO EXTERNAL FORCES TEST
2019-09-05

ITAV

5.1 POWER TRANSFER USING ES1 OR ES2VOLTAGES, GENERAL REQUIREMENTS5.3.2 DC power transfer interconnection to otherequipment5.4.1 Requirement for the PSE5.4.2 Requirement for the PD
2021-03-05

MED

4.11 Power Input test8.4.3 Voltage Limitation – Part 18.4.4 Voltage Limitation – Part 28.4.2 Low Voltage Reliability8.7 Leakage Current 8.5.4 Working Voltage Measurements8.6.4 a) Earthing and Potential Equalization test8.8.3 Dielectric Voltage Withstand8.8.4.1 Ball Pressure11.1.1 Temperature5.7 Humidity Preconditioning Treatment13.2 Abnormal Operation and Fault Conditions15.3 Mechanical Strength15.3.4 Drop Test15.3.6 Mold Stress Relief test15.5.1 Transformer Overload and Short-circuit tests11.8 Interruption of Power Supply
2019-01-24

MED

4.11 Power Input test8.4.3 Voltage Limitation – Part 18.4.4 Voltage Limitation – Part 28.4.2 Low Voltage Reliability8.7 Leakage Current 8.5.4 Working Voltage Measurements8.6.4 a) Earthing and Potential Equalization test8.8.3 Dielectric Voltage Withstand8.8.4.1 Ball Pressure11.1.1 Temperature5.7 Humidity Preconditioning Treatment13.2 Abnormal Operation and Fault Conditions15.3 Mechanical Strength15.3.4 Drop Test15.3.6 Mold Stress Relief test15.5.1 Transformer Overload and Short-circuit tests11.8 Interruption of Power Supply
2019-01-24

MED

4.11 Power Input test8.4.3 Voltage Limitation – Part 18.4.4 Voltage Limitation – Part 28.4.2 Low Voltage Reliability8.7 Leakage Current 8.5.4 Working Voltage Measurements8.6.4 a) Earthing and Potential Equalization test8.8.3 Dielectric Voltage Withstand8.8.4.1 Ball Pressure11.1.1 Temperature5.7 Humidity Preconditioning Treatment13.2 Abnormal Operation and Fault Conditions15.3 Mechanical Strength15.3.4 Drop Test15.3.6 Mold Stress Relief test15.5.1 Transformer Overload and Short-circuit tests11.8 Interruption of Power Supply
2022-11-23

MED

7.1 Power Input test15 b) Voltage Limitation – Part 115 c) Voltage Limitation – Part 216 e) Low Voltage Reliability19 Leakage Current20.3 Working Voltage Measurements18 f) Earthing and Potential Equalization test20.4 Dielectric Voltage Withstand59.2 Ball Pressure42 Temperature44.5 Humidity Preconditioning Treatment52 Abnormal Operation and Fault Conditions21 Mechanical Strength21.5, 21.6 Drop Test57.9.1 Transformer Overload and Short-circuit tests49 Interruption of Power Supply-- Mold Stress Relief test
2020-03-30

MED

7.1 Power Input test15 b) Voltage Limitation – Part 115 c) Voltage Limitation – Part 216 e) Low Voltage Reliability19 Leakage Current20.3 Working Voltage Measurements18 f) Earthing and Potential Equalization test20.4 Dielectric Voltage Withstand59.2 Ball Pressure42 Temperature44.5 Humidity Preconditioning Treatment52 Abnormal Operation and Fault Conditions21 Mechanical Strength21.5, 21.6 Drop Test57.9.1 Transformer Overload and Short-circuit tests49 Interruption of Power Supply-- Mold Stress Relief test
2020-03-30

MED

7.1 Power Input test15 b) Voltage Limitation – Part 115 c) Voltage Limitation – Part 216 e) Low Voltage Reliability19 Leakage Current20.3 Working Voltage Measurements18 f) Earthing and Potential Equalization test20.4 Dielectric Voltage Withstand59.2 Ball Pressure42 Temperature44.5 Humidity Preconditioning Treatment52 Abnormal Operation and Fault Conditions21 Mechanical Strength21.5, 21.6 Drop Test57.9.1 Transformer Overload and Short-circuit tests49 Interruption of Power Supply-- Mold Stress Relief test
2020-03-30

OFF

1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, ANDVOLT‐AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE-PHASE1.6.2 - INPUT TEST: POLYPHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARDMEASUREMENTS2.1.1.7 - CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 - SELV RELIABILITY TES2.4.1, 2.4.2 - LIMITED CURRENT CIRCUITMEASUREMENTS2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4 - LIMITED SHORT-CIRCUIT TEST2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.6.4.1, 3.3.1 - ENGAGEMENT-DISENGAGEMENT TEST2.7 - DC CIRCUIT FUSE TEST2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST2.10.2 - DETERMINATION OF WORKING VOLTAGE -WORKING VOLTAGE MEASUREMENT TEST2.10.2 - DETERMINATION OF WORKING VOLTAGE -SECONDARY OUTPUT VOLTAGE TEST2.10.5.8, ANNEX AA - MANDREL TEST FOR NONSEPARABLETHIN SHEET MATERIAL2.10.5.9, 2.10.5.10, 2.10.5.6 - THIN SHEET MATERIALTESTS2.10.5.13 - Transformer and Wire /Insulation ElectricStrength2.10.8, 2.10.9 - TESTS ON COATED PRINTED WIRINGBOARDS AND COATED COMPONENTS (CONFORMALCOATINGS)2.10.10, 2.10.9 - TEST FOR POLLUTION DEGREE 1ENVIRONMENT AND FOR INSULATING COMPOUND2.10.11, 2.10.9 - TESTS FOR SEMICONDUCTOR DEVICESAND FOR CEMENTED JOINTS3.2.6, 4.2.1, 4.2.7 - STRAIN RELIEF TEST4.1 - STABILITY TESTS4.2.1 - 4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22 10.2 - IMPACT TEST4.2.6, 4.2.1 ‐ DROP TEST4.2.7, 4.2.1 - STRESS RELIEF TEST4.2.10 - LOADING TESTS – WALL AND CEILINGMOUNTED EQUIPMENT4.2.11.1 - RACK MOUNTED EQUIPMENT -MECHANICAL STRENGTH TESTS4.3.1 - SHARP EDGE TEST4.3.2 - KNOB PULL/HANDLE LOADING TEST4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST4.3.6 - DIRECT PLUG IN EQUIPMENT-MOMENT TEST4.3.8 - BATTERY TESTS4.3.8 - LITHIUM BATTERY REVERSECURRENT MEASUREMENT TEST4.4.2, 4.4.4 - HAZARDOUS MOVING PARTS TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST4.5.5, 4.5 - BALL PRESSURE TEST4.6.5 - BARRIER ADHESIVE TEST5.1, ANNEX D - TOUCH CURRENT TEST (SINGLE-PHASE;TN/TT SYSTEM)5.1, ANNEX D - TOUCH CURRENT TEST (POLYPHASE;TN/TT SYSTEM)5.1, ANNEX D - IT TOUCH CURRENT TEST (SINGLEPHASE)5.2.2 - ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.1, 5.3.9 - ABNORMAL OPERATION TESTS5.3.1, 5.3.9 - ABNORMAL OPERATION – LAMP RUPTURE5.3.3, 5.3.7b, ANNEX C.1 - TRANSFORMER ABNORMALOPERATION TEST5.3.7 - POWER SUPPLY OUTPUTSHORT- CIRCUIT/OVERLOAD TEST5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLECONNECTOR TESTANNEX B.7 - LOCKED ROTOR OVERLOAD TEST FOR DC
2019-09-15

OFF

1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, ANDVOLT‐AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE-PHASE1.6.2 - INPUT TEST: POLYPHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARDMEASUREMENTS2.1.1.7 - CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 - SELV RELIABILITY TES2.4.1, 2.4.2 - LIMITED CURRENT CIRCUITMEASUREMENTS2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4 - LIMITED SHORT-CIRCUIT TEST2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.6.4.1, 3.3.1 - ENGAGEMENT-DISENGAGEMENT TEST2.7 - DC CIRCUIT FUSE TEST2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST2.10.2 - DETERMINATION OF WORKING VOLTAGE -WORKING VOLTAGE MEASUREMENT TEST2.10.2 - DETERMINATION OF WORKING VOLTAGE -SECONDARY OUTPUT VOLTAGE TEST2.10.5.8, ANNEX AA - MANDREL TEST FOR NONSEPARABLETHIN SHEET MATERIAL2.10.5.9, 2.10.5.10, 2.10.5.6 - THIN SHEET MATERIALTESTS2.10.5.13 - Transformer and Wire /Insulation ElectricStrength2.10.8, 2.10.9 - TESTS ON COATED PRINTED WIRINGBOARDS AND COATED COMPONENTS (CONFORMALCOATINGS)2.10.10, 2.10.9 - TEST FOR POLLUTION DEGREE 1ENVIRONMENT AND FOR INSULATING COMPOUND2.10.11, 2.10.9 - TESTS FOR SEMICONDUCTOR DEVICESAND FOR CEMENTED JOINTS3.2.6, 4.2.1, 4.2.7 - STRAIN RELIEF TEST4.1 - STABILITY TESTS4.2.1 - 4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22 10.2 - IMPACT TEST4.2.6, 4.2.1 ‐ DROP TEST4.2.7, 4.2.1 - STRESS RELIEF TEST4.2.10 - LOADING TESTS – WALL AND CEILINGMOUNTED EQUIPMENT4.2.11.1 - RACK MOUNTED EQUIPMENT -MECHANICAL STRENGTH TESTS4.3.1 - SHARP EDGE TEST4.3.2 - KNOB PULL/HANDLE LOADING TEST4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST4.3.6 - DIRECT PLUG IN EQUIPMENT-MOMENT TEST4.3.8 - BATTERY TESTS4.3.8 - LITHIUM BATTERY REVERSECURRENT MEASUREMENT TEST4.4.2, 4.4.4 - HAZARDOUS MOVING PARTS TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST4.5.5, 4.5 - BALL PRESSURE TEST4.6.5 - BARRIER ADHESIVE TEST5.1, ANNEX D - TOUCH CURRENT TEST (SINGLE-PHASE;TN/TT SYSTEM)5.1, ANNEX D - TOUCH CURRENT TEST (POLYPHASE;TN/TT SYSTEM)5.1, ANNEX D - IT TOUCH CURRENT TEST (SINGLEPHASE)5.2.2 - ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.1, 5.3.9 - ABNORMAL OPERATION TESTS5.3.1, 5.3.9 - ABNORMAL OPERATION – LAMP RUPTURE5.3.3, 5.3.7b, ANNEX C.1 - TRANSFORMER ABNORMALOPERATION TEST5.3.7 - POWER SUPPLY OUTPUTSHORT- CIRCUIT/OVERLOAD TEST5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLECONNECTOR TESTANNEX B.7 - LOCKED ROTOR OVERLOAD TEST FOR DC
2019-09-15

OFF

1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, ANDVOLT‐AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE-PHASE1.6.2 - INPUT TEST: POLYPHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARDMEASUREMENTS2.1.1.7 - CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 - SELV RELIABILITY TES2.4.1, 2.4.2 - LIMITED CURRENT CIRCUITMEASUREMENTS2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4 - LIMITED SHORT-CIRCUIT TEST2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.6.4.1, 3.3.1 - ENGAGEMENT-DISENGAGEMENT TEST2.7 - DC CIRCUIT FUSE TEST2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST2.10.2 - DETERMINATION OF WORKING VOLTAGE -WORKING VOLTAGE MEASUREMENT TEST2.10.2 - DETERMINATION OF WORKING VOLTAGE -SECONDARY OUTPUT VOLTAGE TEST2.10.5.8, ANNEX AA - MANDREL TEST FOR NONSEPARABLETHIN SHEET MATERIAL2.10.5.9, 2.10.5.10, 2.10.5.6 - THIN SHEET MATERIALTESTS2.10.5.13 - Transformer and Wire /Insulation ElectricStrength2.10.8, 2.10.9 - TESTS ON COATED PRINTED WIRINGBOARDS AND COATED COMPONENTS (CONFORMALCOATINGS)2.10.10, 2.10.9 - TEST FOR POLLUTION DEGREE 1ENVIRONMENT AND FOR INSULATING COMPOUND2.10.11, 2.10.9 - TESTS FOR SEMICONDUCTOR DEVICESAND FOR CEMENTED JOINTS3.2.6, 4.2.1, 4.2.7 - STRAIN RELIEF TEST4.1 - STABILITY TESTS4.2.1 - 4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22 10.2 - IMPACT TEST4.2.6, 4.2.1 ‐ DROP TEST4.2.7, 4.2.1 - STRESS RELIEF TEST4.2.10 - LOADING TESTS – WALL AND CEILINGMOUNTED EQUIPMENT4.2.11.1 - RACK MOUNTED EQUIPMENT -MECHANICAL STRENGTH TESTS4.3.1 - SHARP EDGE TEST4.3.2 - KNOB PULL/HANDLE LOADING TEST4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST4.3.6 - DIRECT PLUG IN EQUIPMENT-MOMENT TEST4.3.8 - BATTERY TESTS4.3.8 - LITHIUM BATTERY REVERSECURRENT MEASUREMENT TEST4.4.2, 4.4.4 - HAZARDOUS MOVING PARTS TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST4.5.5, 4.5 - BALL PRESSURE TEST4.6.5 - BARRIER ADHESIVE TEST5.1, ANNEX D - TOUCH CURRENT TEST (SINGLE-PHASE;TN/TT SYSTEM)5.1, ANNEX D - TOUCH CURRENT TEST (POLYPHASE;TN/TT SYSTEM)5.1, ANNEX D - IT TOUCH CURRENT TEST (SINGLEPHASE)5.2.2 - ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.1, 5.3.9 - ABNORMAL OPERATION TESTS5.3.1, 5.3.9 - ABNORMAL OPERATION – LAMP RUPTURE5.3.3, 5.3.7b, ANNEX C.1 - TRANSFORMER ABNORMALOPERATION TEST5.3.7 - POWER SUPPLY OUTPUTSHORT- CIRCUIT/OVERLOAD TEST5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLECONNECTOR TESTANNEX B.7 - LOCKED ROTOR OVERLOAD TEST FOR DC
2019-09-15

OFF

4.4.7.4 to 4.4.7.5/RD, 4.4.7.8.3.2/RD to 4.4.7.9 4 5.2.2.1 WORKING VOLTAGE MEASUREMENT, CLEARANCES AND CREEPAGE DISTANCES TEST, DISTANCE THROUGH INSULATION MEASUREMENTS:4.4.4.3, 5.2.2.2, RD 5.2.2.3 INGRESS PROTECTION TEST (IP RATING):5.2.2.4.2.2, 5.2.2.4.2.3 STEADY FORCE TEST (30 N and /or 250 N):5.2.2.4.3 IMPACT TEST:5.2.2.4.4 DROP TEST:5.2.2.4.5 STRESS RELIEF TEST:5.2.2.5 STABILITY TEST:5.2.2.6.101 WALL AND CEILING MOUNTED EQUIPMENT TEST:5.2.2.6.102, Annex GG RACK MOUNTED EQUIPMENT test:5.2.2.7 HANDLES AND MANUAL CONTROLS SECUREMENT TEST:5.2.3.2, 5.2.3.3 IMPULS VOLTAGE TEST, ALTERNATE TO IMPULSE VOLTAGE TEST:5.2.3.4.2 AC OR D.C. VOLTAGE TEST:5.2.3.6 PROTECTIVE IMPEDANCE TEST:4.4.5.4 PROTECTIVE IMPEDANCE DISCHARGE ENERGY TEST:5.2.3.7 TOUCH CURRENT MEASUREMENT TEST:5.2.3.8 CAPACITOR DISCHARGE TEST:5.2.3.9 LIMITED POWER SOURCE TEST:5.2.3.10 TEMPERATURE RISE TEST:5.2.3.11.2 PROTECTIVE EQUIPOTENTIAL BONDING IMPEDANCE TEST:5.2.3.101 BACKFEED PROTECTION TEST:5.2.3.102 INPUT CURRENT TEST:5.2.3.104 TRANSFORMER PROTECTION TEST:5.2.3.105 UNSYNCHRONISED LOAD TRANSFER TEST:5.2.4, RD 5.2.4 ABNORMAL OPERATION AND SIMULATED FAULTS TESTS:5.2.4.4 OUTPUT SHORT-CIRCUIT TEST:5.2.4.5 OUTPUT OVERLOAD TEST:5.2.4.6 BREAKDOWN OF COMPONENTS TEST:5.2.4.7 PWB SHORT CIRCUIT TEST:5.2.4.8 LOSS OF PHASE TEST:5.2.4.9 COOLING FAILURE TESTS:5.2.6.3.1 DRY HEAT TEST5.2.6.3.2 DAMP HEAT TESTAnnex CC, CC.4 BATTERY OVERCHARGE TEST
2023-08-30

OFF

4.4.7.4 to 4.4.7.5/RD, 4.4.7.8.3.2/RD to 4.4.7.9 4 5.2.2.1 WORKING VOLTAGE MEASUREMENT, CLEARANCES AND CREEPAGE DISTANCES TEST, DISTANCE THROUGH INSULATION MEASUREMENTS:4.4.4.3, 5.2.2.2, RD 5.2.2.3 INGRESS PROTECTION TEST (IP RATING):5.2.2.4.2.2, 5.2.2.4.2.3 STEADY FORCE TEST (30 N and /or 250 N):5.2.2.4.3 IMPACT TEST:5.2.2.4.4 DROP TEST:5.2.2.4.5 STRESS RELIEF TEST:5.2.2.5 STABILITY TEST:5.2.2.6.101 WALL AND CEILING MOUNTED EQUIPMENT TEST:5.2.2.6.102, Annex GG RACK MOUNTED EQUIPMENT test:5.2.2.7 HANDLES AND MANUAL CONTROLS SECUREMENT TEST:5.2.3.2, 5.2.3.3 IMPULS VOLTAGE TEST, ALTERNATE TO IMPULSE VOLTAGE TEST:5.2.3.4.2 AC OR D.C. VOLTAGE TEST:5.2.3.6 PROTECTIVE IMPEDANCE TEST:4.4.5.4 PROTECTIVE IMPEDANCE DISCHARGE ENERGY TEST:5.2.3.7 TOUCH CURRENT MEASUREMENT TEST:5.2.3.8 CAPACITOR DISCHARGE TEST:5.2.3.9 LIMITED POWER SOURCE TEST:5.2.3.10 TEMPERATURE RISE TEST:5.2.3.11.2 PROTECTIVE EQUIPOTENTIAL BONDING IMPEDANCE TEST:5.2.3.101 BACKFEED PROTECTION TEST:5.2.3.102 INPUT CURRENT TEST:5.2.3.104 TRANSFORMER PROTECTION TEST:5.2.3.105 UNSYNCHRONISED LOAD TRANSFER TEST:5.2.4, RD 5.2.4 ABNORMAL OPERATION AND SIMULATED FAULTS TESTS:5.2.4.4 OUTPUT SHORT-CIRCUIT TEST:5.2.4.5 OUTPUT OVERLOAD TEST:5.2.4.6 BREAKDOWN OF COMPONENTS TEST:5.2.4.7 PWB SHORT CIRCUIT TEST:5.2.4.8 LOSS OF PHASE TEST:5.2.4.9 COOLING FAILURE TESTS:5.2.6.3.1 DRY HEAT TEST5.2.6.3.2 DAMP HEAT TESTAnnex CC, CC.4 BATTERY OVERCHARGE TEST
2023-08-30

TRON

4.2 INPUT TEST FOR APPARATUS NOTEMPLOYING SIGNAL INPUTS AND NOTCONTAINING AN AUDIO AMPLIFIER4.3 FAULT CONDITIONS - GENERAL4.3.1, 4.3.2, 4.3.4 FAULT CONDITIONS - CLEARANCE ANDCREEPAGE, INSULATING MATERIALS AND ELECTRONICCOMPONENTS4.3.9 FAULT CONDITIONS - OUTPUTTERMINAL OVERLOAD4.3.10 FAULT CONDITIONS - VENTILATIONOPENINGS BLOCKED11 DIELECTRIC STRENGTH AFTER FAULT CONDITIONS11.1 TOUCH CURRENT AFTER FAULTCONDITIONS 5 MARKING DURABILITY ANDLEGIBILITY7 HEATING UNDER NORMAL OPERATING CONDITIONS8.8 WINDING INSULATION TEST9.1.1 TOUCH CURRENT9.1.6 WITHDRAWAL OF MAINS PLUG9.1.7 ENCLOSURE RESISTANCE TO EXTERNALFORCES TEST10.1 SURGE TEST10.2 HUMIDITY TREATMENT10.3 INSULATION RESISTANCE ANDDIELECTRIC STRENGTH AFTER HUMIDITYTREATMENT12.1.2 VIBRATION TEST12.1.3 IMPACT TEST12.1.3 DIELECTRIC STRENGTH AFTER IMPACT TEST IEC60065,12.1.3 IMPACT TEST IEC 60065,12.1.3 DIELECTRIC STRENGTH AFTER IMPACT TEST12.1.4 DROP TEST12.1.4 DIELECTRIC STRENGTH AFTER DROP TEST12.1.5 STRESS RELIEF TEST12.1.6 HANDLE STRENGTH TEST13.2 DETERMINATION OF OPERATING VOLTAGE15.4.1 MOMENT DETERMINATION FOR DEVICESFORMING A PART OF THE MAINS PLUG - DIRECT PLUGINUNIT15.4.3a DROP TEST - DIRECT PLUG-IN UNIT15.4.3b BLADE TORQUE TEST - DIRECT PLUG-IN UNIT15.4.3c BLADE SECURENESS PULL TEST - DIRECT PLUGINUNIT16.5 MAINS FLEXIBLE CORD STRAIN AND TORQUE TEST16.5 MAINS FLEXIBLE CORD STRAIN AND TORQUETEST FOLLOWING STRESS RELIEF CONDITIONING17.1 SCREW SECUREMENT TEST
2019-09-15

TRON

4.2 INPUT TEST FOR APPARATUS NOTEMPLOYING SIGNAL INPUTS AND NOTCONTAINING AN AUDIO AMPLIFIER4.3 FAULT CONDITIONS - GENERAL4.3.1, 4.3.2, 4.3.4 FAULT CONDITIONS - CLEARANCE ANDCREEPAGE, INSULATING MATERIALS AND ELECTRONICCOMPONENTS4.3.9 FAULT CONDITIONS - OUTPUTTERMINAL OVERLOAD4.3.10 FAULT CONDITIONS - VENTILATIONOPENINGS BLOCKED11 DIELECTRIC STRENGTH AFTER FAULT CONDITIONS11.1 TOUCH CURRENT AFTER FAULTCONDITIONS 5 MARKING DURABILITY ANDLEGIBILITY7 HEATING UNDER NORMAL OPERATING CONDITIONS8.8 WINDING INSULATION TEST9.1.1 TOUCH CURRENT9.1.6 WITHDRAWAL OF MAINS PLUG9.1.7 ENCLOSURE RESISTANCE TO EXTERNALFORCES TEST10.1 SURGE TEST10.2 HUMIDITY TREATMENT10.3 INSULATION RESISTANCE ANDDIELECTRIC STRENGTH AFTER HUMIDITYTREATMENT12.1.2 VIBRATION TEST12.1.3 IMPACT TEST12.1.3 DIELECTRIC STRENGTH AFTER IMPACT TEST IEC60065,12.1.3 IMPACT TEST IEC 60065,12.1.3 DIELECTRIC STRENGTH AFTER IMPACT TEST12.1.4 DROP TEST12.1.4 DIELECTRIC STRENGTH AFTER DROP TEST12.1.5 STRESS RELIEF TEST12.1.6 HANDLE STRENGTH TEST13.2 DETERMINATION OF OPERATING VOLTAGE15.4.1 MOMENT DETERMINATION FOR DEVICESFORMING A PART OF THE MAINS PLUG - DIRECT PLUGINUNIT15.4.3a DROP TEST - DIRECT PLUG-IN UNIT15.4.3b BLADE TORQUE TEST - DIRECT PLUG-IN UNIT15.4.3c BLADE SECURENESS PULL TEST - DIRECT PLUGINUNIT16.5 MAINS FLEXIBLE CORD STRAIN AND TORQUE TEST16.5 MAINS FLEXIBLE CORD STRAIN AND TORQUETEST FOLLOWING STRESS RELIEF CONDITIONING17.1 SCREW SECUREMENT TEST
2019-09-15

TRON

4.2 INPUT TEST FOR APPARATUS NOTEMPLOYING SIGNAL INPUTS AND NOTCONTAINING AN AUDIO AMPLIFIER4.3 FAULT CONDITIONS - GENERAL4.3.1, 4.3.2, 4.3.4 FAULT CONDITIONS - CLEARANCE ANDCREEPAGE, INSULATING MATERIALS AND ELECTRONICCOMPONENTS4.3.9 FAULT CONDITIONS - OUTPUTTERMINAL OVERLOAD4.3.10 FAULT CONDITIONS - VENTILATIONOPENINGS BLOCKED11 DIELECTRIC STRENGTH AFTER FAULT CONDITIONS11.1 TOUCH CURRENT AFTER FAULTCONDITIONS 5 MARKING DURABILITY ANDLEGIBILITY7 HEATING UNDER NORMAL OPERATING CONDITIONS8.8 WINDING INSULATION TEST9.1.1 TOUCH CURRENT9.1.6 WITHDRAWAL OF MAINS PLUG9.1.7 ENCLOSURE RESISTANCE TO EXTERNALFORCES TEST10.1 SURGE TEST10.2 HUMIDITY TREATMENT10.3 INSULATION RESISTANCE ANDDIELECTRIC STRENGTH AFTER HUMIDITYTREATMENT12.1.2 VIBRATION TEST12.1.3 IMPACT TEST12.1.3 DIELECTRIC STRENGTH AFTER IMPACT TEST IEC60065,12.1.3 IMPACT TEST IEC 60065,12.1.3 DIELECTRIC STRENGTH AFTER IMPACT TEST12.1.4 DROP TEST12.1.4 DIELECTRIC STRENGTH AFTER DROP TEST12.1.5 STRESS RELIEF TEST12.1.6 HANDLE STRENGTH TEST13.2 DETERMINATION OF OPERATING VOLTAGE15.4.1 MOMENT DETERMINATION FOR DEVICESFORMING A PART OF THE MAINS PLUG - DIRECT PLUGINUNIT15.4.3a DROP TEST - DIRECT PLUG-IN UNIT15.4.3b BLADE TORQUE TEST - DIRECT PLUG-IN UNIT15.4.3c BLADE SECURENESS PULL TEST - DIRECT PLUGINUNIT16.5 MAINS FLEXIBLE CORD STRAIN AND TORQUE TEST16.5 MAINS FLEXIBLE CORD STRAIN AND TORQUETEST FOLLOWING STRESS RELIEF CONDITIONING17.1 SCREW SECUREMENT TEST
2019-09-15