COSEL CO., LTD.

Address(es)
  • Product Safety Center
    6‐10 Higashiohgishima, Kawasaki‐ku
    Kawasaki‐shi 210‐0869
    Kanagawa
    Japan

Website Not available
Status

WITHDRAWN

Acceptance date 2019-09-17

Further information

Stage

Country

Name

2

Japan

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

Accepted clauses:
4.4.4.2, T.5 STEADY FORCE TEST, 250N
4.4.4.3, ANNEX T.7 DROP TEST
4.4.4.4, T.6 IMPACT TEST
4.4.4.7, ANNEX T.8 STRESS RELIEF TEST
5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES
5.2.1.1 ACCESSIBLE ES1 CIRCUITS SEPARATED FROM OTHER ES CIRCUITS USING COMPONENTS
5.2.2.2 STEADY-STATE VOLTAGE AND CURRENT LIMITS
5.2.2.4 SINGLE PULSE LIMITS
5.4.1.10.3 BALL PRESSURE TEST
5.4.1.3 TEST FOR HYGROSCOPIC MATERIALS
5.4.1.4 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS
5.4.1.4, ANNEX B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS
5.4.1.5.2 TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR AN INSULATING COMPOUND
5.4.1.7 INSULATIONS IN CIRCUITS GENERATING STARTING PULSES
5.4.1.8 DETERMINATION OF WORKING VOLTAGE
5.4.2.3.2.5 Determining transient voltage levels by measurement
5.4.2.4 DETERMINING THE ADEQUACY OF A CLEARANCE USING AN ELECTRICAL STRENGTH TEST
5.4.2.4 MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST
5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL
5.4.7, 5.4.1.5.3 TESTS FOR SEMICONDUCTOR COMPONENTS AND CEMENTED JOINTS
5.4.7, 5.4.1.5.3, 5.4.4.4, 5.4.4.5 TESTS FOR SEMICONDUCTOR COMPONENTS AND CEMENTED JOINTS
5.4.8 HUMIDITY CONDITIONING
5.4.9 ELECTRIC STRENGTH
5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR
5.6.6 RESISTANCE OF THE PROTECTIVE BONDING SYSTEM
5.6.6.2(A) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM
5.6.6.2(C) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM:ALTERNATE TO 5.6.6.2(B)
5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT
5.7.5 PROTECTIVE CONDUCTOR CURRENT
6.2.2.2, 6.2.2.3 POWER MEASUREMENTS
6.2.3.1 ARCING PIS DETERMINATION
6.2.3.2 RESISTIVE PIS DETERMINATION
6.3 NORMAL OPERATING CONDITIONS TEMPERATURE TEST
6.3 TEMPERATURE TEST:ABNORMAL OPERATING CONDITIONS
6.4.2, ANNEX B.4 SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITION
6.4.3, ANNEX B.4 REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS
6.4.3.3 REDUCTION OF THE LIKELIHOOD OF IGNITION - TEMPERATURES LIMITED BY FUSES
6.6 TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION
9.2.5 TOUCH TEMPERATURE TEST
ANNEX B.2.5 INPUT TEST
ANNEX B.2.5 INPUT TEST: POLYPHASE
ANNEX B.2.5 INPUT TEST: SINGLE PHASE
ANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT
ANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONS
ANNEX B.4 SIMULATED SINGLE FAULT CONDITIONS
ANNEX F.3.9, F.3.10 TEST FOR THE PERMANENCE OF MARKINGS
ANNEX G.5.3.3 TRANSFORMER OVERLOAD
ANNEX G.5.3.3.3 TRANSFORMER OVERLOAD – ALTERNATIVE TEST METHOD
ANNEX G.5.4.6 LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORS
ANNEX G.7.6.2 STRANDED WIRE
ANNEX P.4 Metallized coatings and adhesives securing parts
ANNEX T.2 - T.5 STEADY FORCE TEST (10N, 30N, 100N, 250N)
ANNEX T.6 ENCLOSURE IMPACT TEST
ANNEX T.7 DROP TEST
ANNEX T.8 STRESS RELIEF TEST
B.2.5 INPUT TEST
G.10.2 RESISTOR TEST
G.5.4.4 MOTOR LOCKED-ROTOR OVERLOAD
G.5.4.6 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS
G.5.4.6.3 ALTERNATIVE LOCKED -ROTOR OVERLOAD TEST FOR D.C. MOTORS
Q.1 LIMITED POWER SOURCE
T.5 STEADY FORCE 250N
T.8 STRESS RELIEF
T.8, 4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4 STRESS RELIEF - ALTERNATE TEST PER IEC 60695-10-3
2021-09-07

ITAV

Accepted clauses:
4.4.4.2, T.5 STEADY FORCE TEST, 250N
4.4.4.3, ANNEX T.7 DROP TEST
4.4.4.4, T.6 IMPACT TEST
4.4.4.7, ANNEX T.8 STRESS RELIEF TEST
5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES
5.2.1.1 ACCESSIBLE ES1 CIRCUITS SEPARATED FROM OTHER ES CIRCUITS USING COMPONENTS
5.2.2.2 STEADY-STATE VOLTAGE AND CURRENT LIMITS
5.2.2.4 SINGLE PULSE LIMITS
5.4.1.10.3 BALL PRESSURE TEST
5.4.1.3 TEST FOR HYGROSCOPIC MATERIALS
5.4.1.4 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS
5.4.1.4, ANNEX B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS
5.4.1.5.2 TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR AN INSULATING COMPOUND
5.4.1.7 INSULATIONS IN CIRCUITS GENERATING STARTING PULSES
5.4.1.8 DETERMINATION OF WORKING VOLTAGE
5.4.2.3.2.5 Determining transient voltage levels by measurement
5.4.2.4 DETERMINING THE ADEQUACY OF A CLEARANCE USING AN ELECTRICAL STRENGTH TEST
5.4.2.4 MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST
5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL
5.4.7, 5.4.1.5.3 TESTS FOR SEMICONDUCTOR COMPONENTS AND CEMENTED JOINTS
5.4.7, 5.4.1.5.3, 5.4.4.4, 5.4.4.5 TESTS FOR SEMICONDUCTOR COMPONENTS AND CEMENTED JOINTS
5.4.8 HUMIDITY CONDITIONING
5.4.9 ELECTRIC STRENGTH
5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR
5.6.6 RESISTANCE OF THE PROTECTIVE BONDING SYSTEM
5.6.6.2(A) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM
5.6.6.2(C) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM:ALTERNATE TO 5.6.6.2(B)
5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT
5.7.5 PROTECTIVE CONDUCTOR CURRENT
6.2.2.2, 6.2.2.3 POWER MEASUREMENTS
6.2.3.1 ARCING PIS DETERMINATION
6.2.3.2 RESISTIVE PIS DETERMINATION
6.3 NORMAL OPERATING CONDITIONS TEMPERATURE TEST
6.3 TEMPERATURE TEST:ABNORMAL OPERATING CONDITIONS
6.4.2, ANNEX B.4 SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITION
6.4.3, ANNEX B.4 REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS
6.4.3.3 REDUCTION OF THE LIKELIHOOD OF IGNITION - TEMPERATURES LIMITED BY FUSES
6.6 TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION
9.2.5 TOUCH TEMPERATURE TEST
ANNEX B.2.5 INPUT TEST
ANNEX B.2.5 INPUT TEST: POLYPHASE
ANNEX B.2.5 INPUT TEST: SINGLE PHASE
ANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT
ANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONS
ANNEX B.4 SIMULATED SINGLE FAULT CONDITIONS
ANNEX F.3.9, F.3.10 TEST FOR THE PERMANENCE OF MARKINGS
ANNEX G.5.3.3 TRANSFORMER OVERLOAD
ANNEX G.5.3.3.3 TRANSFORMER OVERLOAD – ALTERNATIVE TEST METHOD
ANNEX G.5.4.6 LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORS
ANNEX G.7.6.2 STRANDED WIRE
ANNEX P.4 Metallized coatings and adhesives securing parts
ANNEX T.2 - T.5 STEADY FORCE TEST (10N, 30N, 100N, 250N)
ANNEX T.6 ENCLOSURE IMPACT TEST
ANNEX T.7 DROP TEST
ANNEX T.8 STRESS RELIEF TEST
B.2.5 INPUT TEST
G.10.2 RESISTOR TEST
G.5.4.4 MOTOR LOCKED-ROTOR OVERLOAD
G.5.4.6 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS
G.5.4.6.3 ALTERNATIVE LOCKED -ROTOR OVERLOAD TEST FOR D.C. MOTORS
Q.1 LIMITED POWER SOURCE
T.5 STEADY FORCE 250N
T.8 STRESS RELIEF
T.8, 4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4 STRESS RELIEF - ALTERNATE TEST PER IEC 60695-10-3
2019-09-17

MED

IEC 60601-1:2005 including all amendmends.

Accepted clauses:
4.11: POWER INPUT
5.7: HUMIDITY CONDITIONING
5.9.2: DETERMINATION OF ACCESSIBLE PARTS
7.1.2: LEGIBILITY OF MARKINGS
7.1.3: DURABILITY OF MARKINGS
7.2.6: VOLTAGE MISMATCH
8.1 B: SHORTING ONE MOP
8.11.4.2: ARRANGEMENT OF MAINS TERMINAL
8.11.4.3: FIXING OF MAINS TERMINAL
8.2.2: INCORRECT POLARITY
8.4.2: LIMITATION OF VOLTAGE, CURRENT OR POWER
8.4.3: VOLTAGE OR CHARGE LIMITATION
8.4.4: VOLTAGE LIMITATION (PART 2)
8.5.4: WORKING VOLTAGE MEASUREMENTS
8.6.4 A: IMPEDANCE AND CURRENT CARRYING CAPABILITY
8.7: LEAKAGE CURRENT TESTS
8.7.3 E: NON -FREQUENCY -WEIGHTED LEAKAGE CURRENT
8.7.4.5: EARTH LEAKAGE CURRENT
8.7.4.6: TOUCH LEAKAGE CURRENT
8.7.4.7 A: PATIENT LEAKAGE CURRENT
8.7.4.7 B: PATIENT LEAKAGE CURRENT, MAINS ON F -TYPE APPLIED PART
8.7.4.7 C: PATIENT LEAKAGE CURRENT, MAINS ON INPUT/OUTPUT
8.7.4.7 D: PATIENT LEAKAGE CURRENT MAINS ON NON-PE ENCLOSURE
8.7.4.7 H: TOTAL PATIENT LEAKAGE CURRENT
8.7.4.8: PATIENT AUXILIARY CURRENT
8.8.3: DIELECTRIC VOLTAGE WITHSTAND
8.8.4.1: BALL PRESSURE
8.9.2: SHORT CIRCUITING IN LIEU OF SPACINGS
8.9.3: SPACES FILLED BY INSULATING COMPOUND
8.9.3: THERMAL CYCLING FOR SPACES FILLED WITH INSULATING COMPOUND
8.9.4: CREEPAGE DISTANCES AND AIR CLEARANCES
11: TEMPERATURE
11.1.3: CHANGE OF RESISTANCE CALCULATIONS
13: ABNORMAL OPERATION TESTING
13.1.2: POWER AVAILABILITY
13.2: FAILURE OF THERMOSTATS
13.2: IMPAIRMENT OF COOLING
13.2: LOCKING OF MOVING PARTS
13.2: SINGLE FAULT CONDITIONS
15.3.2: ENCLOSURE FORCE
15.3.2: PUSH
15.3.3: ENCLOSURE IMPACT
15.3.4: DROP IMPACT
15.3.6: MOLD STRESS RELIEF
15.4.2.1: TEMPERATURE AND OVERLOAD CONTROL DEVICES
15.5.1.2: TRANSFORMER SHORT CIRCUIT
15.5.1.3: TRANSFORMER -OVERLOAD TEST
15.5.2: TRANSFORMER DIELECTRIC VOLTAGE WITHSTAND
2019-09-17

MED

IEC 60601-1:1988 including all amendmends.

Accepted clauses:
4.1: HUMIDITY PRECONDITIONING
6.1: MARKING DURABILITY
7.1: POWER INPUT
10: ENVIRONMENTAL CONDITIONS
15: VOLTAGE LIMITATION - B)
15: VOLTAGE LIMITATION - C)
15: VOLTAGE LIMITATION
16: ENCLOSURE AND PROTECTIVE COVERS - E)
17: SEPARATION - G)
18: EARTHING AND POTENTIAL EQUALIZATION - F)
19: LEAKAGE CURRENT
19.4: EARTH LEAKAGE CURRENT - F)
19.4: ENCLOSURE LEAKAGE CURRENT - G)
19.4: PATIENT LEAKAGE CURRENT - H)
19.4: PATIENT AUXILIARY CURRENT - J)
20.3: WORKING VOLTAGE MEASUREMENTS
20.4: DIELECTRIC VOLTAGE WITHSTAND
21: ENCLOSURE MECHANICAL STRENGTH - A) AND B)
21.5: HAND HELD EQUIPMENT FREE FALL
21.6: PORTABLE EQUIPMENT ROUGH HANDLING - DROP - A)
44.5: HUMIDITY
49: INTERRUPTION OF POWER SUPPLY
52: ABNORMAL OPERATION AND FAULT CONDITIONS
52.5: ABNORMAL OPERATION
56.6: MAXIMUM TEMPERATURE SHUTDOWN
57.1: CREEPAGE DISTANCES AND AIR CLEARANCES
59.2: RESISTANCE TO HEAT - BALL PRESSURE - B)
10.2.2: ENVIRONMENTAL CONDITIONS - SUPPLY MAINS
15B: VOLTAGE LIMITATION (PART 1)
15C: VOLTAGE LIMITATION (PART 2)
16E: LOW VOLTAGE RELIABILITY
52.4.1: POWER DISSIPATION LIMIT
52.5.10: OVERLOAD - HEATING PARTS - E)
52.5.2: FAILURE OF THERMOSTATS
52.5.3: SHORT -CIRCUIT OF PART OF DOUBLE INSULATION
52.5.4: INTERRUPTION OF PROTECTIVE EARTH CONDUCTOR
52.5.5: IMPAIRMENT OF COOLING
52.5.6: LOCKING OF MOVING PARTS
52.5.9: FAILURE OF COMPONENTS
57.9.1: MAINS SUPPLY TRANSFORMERS - OVERHEATING - SHORT CIRCUIT - A)
57.9.1: MAINS SUPPLY TRANSFORMERS - OVERHEATING - OVERLOAD - B)
57.9.2: MAINS SUPPLY TRANSFORMERS - DIELECTRIC STRENGTH
57.9.4: TRANSFORMER CONSTRUCTION
2019-09-17

OFF

IEC 60950-1:2005 including all amendmends.

Accepted clauses:
1.2.2.1 MAX. OUTPUT VOLTAGE, CURRENT & VA MEASUREMENT TEST
1.5.6 CAPACITOR BRIDGING INSULATION
1.6.2 INPUT TEST: SINGLE-PHASE
1.6.2 INPUT TEST: POLYPHASE
1.7.11 DURABILITY OF MARKING TEST
2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS
2.1.1.7 CAPACITANCE DISCHARGE TEST
2.1.1.9 TOUCH CURRENT
2.10.10, 2.10.9 TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR INSULATING COMPOUND
2.10.11, 2.10.9 TESTS FOR SEMICONDUCTOR DEVICES AND FOR CEMENTED JOINTS
2.10.2 DETERMINATION OF WORKING VOLTAGE - HAZARDOUS VOLTAGE (CIRCUIT) MEASUREMENT
2.10.2 DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE
2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT
2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST
2.10.3.5 ELECTRIC STRENGTH TESTS FOR CIRCUITS WITH STARTING PULSES
2.10.3.9 MEASUREMENT OF TRANSIENT LEVELS
2.10.5.2, 2.10.5.13 TRANSFORMER/INSULATION ELECTRIC STRENGTH
2.10.5.5, 2.10.11 CEMENTED JOINTS
2.10.5.6, 2.10.5.13 TRANSFORMER AND WIRE INSULATION ELECTRIC STRENGTH TEST
2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL TESTS
2.2 SELV CIRCUITS
2.2.2, 2.2.3, 2.2.4 SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS
2.4 LIMITED CURRENT CIRCUIT MEASUREMENTS
2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS
2.5 LIMITED POWER SOURCE MEASUREMENTS
2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I
2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II
2.6.4.1, 3.3.1 ENGAGEMENT-DISENGAGEMENT TEST
2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST
3.1.9 CONDUCTOR TERMINATIONS - STEADY FORCE TEST
3.3.8, 3.2.9 FIELD WIRING TEST
4.2.1 - 4.2.4 STEADY FORCE TESTS
4.2.5, 4.2.1 IMPACT TEST
4.2.6, 4.2.1 DROP TEST
4.2.7, 4.2.1 STRESS RELIEF TEST
4.2.7, 4.2.1 STRESS RELIEF TEST - ALTERNATE TEST PER IEC 60695-10-3
4.5 THERMAL REQUIREMENTS
4.5.1, 1.4.12, 1.4.13 HEATING TEST
4.5.5, 4.5 BALL PRESSURE TEST
4.6.5 BARRIER ADHESIVE TEST
5.1, ANNEX D IT TOUCH CURRENT (THREE-PHASE)
5.1, ANNEX D IT TOUCH CURRENT TEST (SINGLE-PHASE)
5.1, ANNEX D TOUCH CURRENT TEST (POLYPHASE; TN/TT SYSTEM)
5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)
5.2.2 ELECTRIC STRENGTH TEST
5.3.1 - 5.3.9 ABNORMAL OPERATION
5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS
5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST
5.3.1, 5.3.9 ABNORMAL OPERATION TESTS
5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST
5.3.4, 5.2 ELECTRIC STRENGTH TEST (FOR SPACING DEFICIENT PWBS)
5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR
5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST
5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST
6.2.2 (6.2.2.1) ELECTRIC STRENGTH TEST PROCEDURE - IMPULSE TEST
6.2.2 (6.2.2.2) ELECTRIC STRENGTH TEST PROCEDURE - STEADY-STATE TEST
ANNEX B.5, B.8 LOCKED ROTOR OVERLOAD AND ENDURANCE TESTS
ANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
ANNEX K.2, 1.5.3 200 CYCLE THERMOSTAT TEST
ANNEX K.3, 1.5.3 10,000 CYCLE THERMOSTAT ENDURANCE TEST
ANNEX K.4, 1.5.3 1000 CYCLE TEMPERATURE LIMITER TEST
ANNEX K.5, 1.5.3, 4.5.1 200 CYCLE THERMAL CUT-OUT TEST
2019-09-17