COSEL CO., LTD.
COSEL CO., LTD.
Address(es) |
|
Website | Not available |
Status | WITHDRAWN |
Acceptance date | 2019-09-17 |
Further information
Stage | Country | Name |
---|---|---|
2 | Japan |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
ITAV | IEC 62368-1:2018 | Accepted clauses: 4.4.4.2, T.5 STEADY FORCE TEST, 250N 4.4.4.3, ANNEX T.7 DROP TEST 4.4.4.4, T.6 IMPACT TEST 4.4.4.7, ANNEX T.8 STRESS RELIEF TEST 5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES 5.2.1.1 ACCESSIBLE ES1 CIRCUITS SEPARATED FROM OTHER ES CIRCUITS USING COMPONENTS 5.2.2.2 STEADY-STATE VOLTAGE AND CURRENT LIMITS 5.2.2.4 SINGLE PULSE LIMITS 5.4.1.10.3 BALL PRESSURE TEST 5.4.1.3 TEST FOR HYGROSCOPIC MATERIALS 5.4.1.4 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS 5.4.1.4, ANNEX B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS 5.4.1.5.2 TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR AN INSULATING COMPOUND 5.4.1.7 INSULATIONS IN CIRCUITS GENERATING STARTING PULSES 5.4.1.8 DETERMINATION OF WORKING VOLTAGE 5.4.2.3.2.5 Determining transient voltage levels by measurement 5.4.2.4 DETERMINING THE ADEQUACY OF A CLEARANCE USING AN ELECTRICAL STRENGTH TEST 5.4.2.4 MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST 5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL 5.4.7, 5.4.1.5.3 TESTS FOR SEMICONDUCTOR COMPONENTS AND CEMENTED JOINTS 5.4.7, 5.4.1.5.3, 5.4.4.4, 5.4.4.5 TESTS FOR SEMICONDUCTOR COMPONENTS AND CEMENTED JOINTS 5.4.8 HUMIDITY CONDITIONING 5.4.9 ELECTRIC STRENGTH 5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR 5.6.6 RESISTANCE OF THE PROTECTIVE BONDING SYSTEM 5.6.6.2(A) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM 5.6.6.2(C) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM:ALTERNATE TO 5.6.6.2(B) 5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT 5.7.5 PROTECTIVE CONDUCTOR CURRENT 6.2.2.2, 6.2.2.3 POWER MEASUREMENTS 6.2.3.1 ARCING PIS DETERMINATION 6.2.3.2 RESISTIVE PIS DETERMINATION 6.3 NORMAL OPERATING CONDITIONS TEMPERATURE TEST 6.3 TEMPERATURE TEST:ABNORMAL OPERATING CONDITIONS 6.4.2, ANNEX B.4 SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITION 6.4.3, ANNEX B.4 REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS 6.4.3.3 REDUCTION OF THE LIKELIHOOD OF IGNITION - TEMPERATURES LIMITED BY FUSES 6.6 TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION 9.2.5 TOUCH TEMPERATURE TEST ANNEX B.2.5 INPUT TEST ANNEX B.2.5 INPUT TEST: POLYPHASE ANNEX B.2.5 INPUT TEST: SINGLE PHASE ANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT ANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONS ANNEX B.4 SIMULATED SINGLE FAULT CONDITIONS ANNEX F.3.9, F.3.10 TEST FOR THE PERMANENCE OF MARKINGS ANNEX G.5.3.3 TRANSFORMER OVERLOAD ANNEX G.5.3.3.3 TRANSFORMER OVERLOAD – ALTERNATIVE TEST METHOD ANNEX G.5.4.6 LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORS ANNEX G.7.6.2 STRANDED WIRE ANNEX P.4 Metallized coatings and adhesives securing parts ANNEX T.2 - T.5 STEADY FORCE TEST (10N, 30N, 100N, 250N) ANNEX T.6 ENCLOSURE IMPACT TEST ANNEX T.7 DROP TEST ANNEX T.8 STRESS RELIEF TEST B.2.5 INPUT TEST G.10.2 RESISTOR TEST G.5.4.4 MOTOR LOCKED-ROTOR OVERLOAD G.5.4.6 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS G.5.4.6.3 ALTERNATIVE LOCKED -ROTOR OVERLOAD TEST FOR D.C. MOTORS Q.1 LIMITED POWER SOURCE T.5 STEADY FORCE 250N T.8 STRESS RELIEF T.8, 4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4 STRESS RELIEF - ALTERNATE TEST PER IEC 60695-10-3 | 2021-09-07 | |
ITAV | IEC 62368-1:2014 | Accepted clauses: 4.4.4.2, T.5 STEADY FORCE TEST, 250N 4.4.4.3, ANNEX T.7 DROP TEST 4.4.4.4, T.6 IMPACT TEST 4.4.4.7, ANNEX T.8 STRESS RELIEF TEST 5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES 5.2.1.1 ACCESSIBLE ES1 CIRCUITS SEPARATED FROM OTHER ES CIRCUITS USING COMPONENTS 5.2.2.2 STEADY-STATE VOLTAGE AND CURRENT LIMITS 5.2.2.4 SINGLE PULSE LIMITS 5.4.1.10.3 BALL PRESSURE TEST 5.4.1.3 TEST FOR HYGROSCOPIC MATERIALS 5.4.1.4 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS 5.4.1.4, ANNEX B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS 5.4.1.5.2 TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR AN INSULATING COMPOUND 5.4.1.7 INSULATIONS IN CIRCUITS GENERATING STARTING PULSES 5.4.1.8 DETERMINATION OF WORKING VOLTAGE 5.4.2.3.2.5 Determining transient voltage levels by measurement 5.4.2.4 DETERMINING THE ADEQUACY OF A CLEARANCE USING AN ELECTRICAL STRENGTH TEST 5.4.2.4 MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST 5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL 5.4.7, 5.4.1.5.3 TESTS FOR SEMICONDUCTOR COMPONENTS AND CEMENTED JOINTS 5.4.7, 5.4.1.5.3, 5.4.4.4, 5.4.4.5 TESTS FOR SEMICONDUCTOR COMPONENTS AND CEMENTED JOINTS 5.4.8 HUMIDITY CONDITIONING 5.4.9 ELECTRIC STRENGTH 5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR 5.6.6 RESISTANCE OF THE PROTECTIVE BONDING SYSTEM 5.6.6.2(A) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM 5.6.6.2(C) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM:ALTERNATE TO 5.6.6.2(B) 5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT 5.7.5 PROTECTIVE CONDUCTOR CURRENT 6.2.2.2, 6.2.2.3 POWER MEASUREMENTS 6.2.3.1 ARCING PIS DETERMINATION 6.2.3.2 RESISTIVE PIS DETERMINATION 6.3 NORMAL OPERATING CONDITIONS TEMPERATURE TEST 6.3 TEMPERATURE TEST:ABNORMAL OPERATING CONDITIONS 6.4.2, ANNEX B.4 SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITION 6.4.3, ANNEX B.4 REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS 6.4.3.3 REDUCTION OF THE LIKELIHOOD OF IGNITION - TEMPERATURES LIMITED BY FUSES 6.6 TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION 9.2.5 TOUCH TEMPERATURE TEST ANNEX B.2.5 INPUT TEST ANNEX B.2.5 INPUT TEST: POLYPHASE ANNEX B.2.5 INPUT TEST: SINGLE PHASE ANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT ANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONS ANNEX B.4 SIMULATED SINGLE FAULT CONDITIONS ANNEX F.3.9, F.3.10 TEST FOR THE PERMANENCE OF MARKINGS ANNEX G.5.3.3 TRANSFORMER OVERLOAD ANNEX G.5.3.3.3 TRANSFORMER OVERLOAD – ALTERNATIVE TEST METHOD ANNEX G.5.4.6 LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORS ANNEX G.7.6.2 STRANDED WIRE ANNEX P.4 Metallized coatings and adhesives securing parts ANNEX T.2 - T.5 STEADY FORCE TEST (10N, 30N, 100N, 250N) ANNEX T.6 ENCLOSURE IMPACT TEST ANNEX T.7 DROP TEST ANNEX T.8 STRESS RELIEF TEST B.2.5 INPUT TEST G.10.2 RESISTOR TEST G.5.4.4 MOTOR LOCKED-ROTOR OVERLOAD G.5.4.6 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS G.5.4.6.3 ALTERNATIVE LOCKED -ROTOR OVERLOAD TEST FOR D.C. MOTORS Q.1 LIMITED POWER SOURCE T.5 STEADY FORCE 250N T.8 STRESS RELIEF T.8, 4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4 STRESS RELIEF - ALTERNATE TEST PER IEC 60695-10-3 | 2019-09-17 | |
MED | IEC 60601-1:2005 | IEC 60601-1:2005 including all amendmends. Accepted clauses: 4.11: POWER INPUT 5.7: HUMIDITY CONDITIONING 5.9.2: DETERMINATION OF ACCESSIBLE PARTS 7.1.2: LEGIBILITY OF MARKINGS 7.1.3: DURABILITY OF MARKINGS 7.2.6: VOLTAGE MISMATCH 8.1 B: SHORTING ONE MOP 8.11.4.2: ARRANGEMENT OF MAINS TERMINAL 8.11.4.3: FIXING OF MAINS TERMINAL 8.2.2: INCORRECT POLARITY 8.4.2: LIMITATION OF VOLTAGE, CURRENT OR POWER 8.4.3: VOLTAGE OR CHARGE LIMITATION 8.4.4: VOLTAGE LIMITATION (PART 2) 8.5.4: WORKING VOLTAGE MEASUREMENTS 8.6.4 A: IMPEDANCE AND CURRENT CARRYING CAPABILITY 8.7: LEAKAGE CURRENT TESTS 8.7.3 E: NON -FREQUENCY -WEIGHTED LEAKAGE CURRENT 8.7.4.5: EARTH LEAKAGE CURRENT 8.7.4.6: TOUCH LEAKAGE CURRENT 8.7.4.7 A: PATIENT LEAKAGE CURRENT 8.7.4.7 B: PATIENT LEAKAGE CURRENT, MAINS ON F -TYPE APPLIED PART 8.7.4.7 C: PATIENT LEAKAGE CURRENT, MAINS ON INPUT/OUTPUT 8.7.4.7 D: PATIENT LEAKAGE CURRENT MAINS ON NON-PE ENCLOSURE 8.7.4.7 H: TOTAL PATIENT LEAKAGE CURRENT 8.7.4.8: PATIENT AUXILIARY CURRENT 8.8.3: DIELECTRIC VOLTAGE WITHSTAND 8.8.4.1: BALL PRESSURE 8.9.2: SHORT CIRCUITING IN LIEU OF SPACINGS 8.9.3: SPACES FILLED BY INSULATING COMPOUND 8.9.3: THERMAL CYCLING FOR SPACES FILLED WITH INSULATING COMPOUND 8.9.4: CREEPAGE DISTANCES AND AIR CLEARANCES 11: TEMPERATURE 11.1.3: CHANGE OF RESISTANCE CALCULATIONS 13: ABNORMAL OPERATION TESTING 13.1.2: POWER AVAILABILITY 13.2: FAILURE OF THERMOSTATS 13.2: IMPAIRMENT OF COOLING 13.2: LOCKING OF MOVING PARTS 13.2: SINGLE FAULT CONDITIONS 15.3.2: ENCLOSURE FORCE 15.3.2: PUSH 15.3.3: ENCLOSURE IMPACT 15.3.4: DROP IMPACT 15.3.6: MOLD STRESS RELIEF 15.4.2.1: TEMPERATURE AND OVERLOAD CONTROL DEVICES 15.5.1.2: TRANSFORMER SHORT CIRCUIT 15.5.1.3: TRANSFORMER -OVERLOAD TEST 15.5.2: TRANSFORMER DIELECTRIC VOLTAGE WITHSTAND | 2019-09-17 | |
MED | IEC 60601-1:1988 | IEC 60601-1:1988 including all amendmends. Accepted clauses: 4.1: HUMIDITY PRECONDITIONING 6.1: MARKING DURABILITY 7.1: POWER INPUT 10: ENVIRONMENTAL CONDITIONS 15: VOLTAGE LIMITATION - B) 15: VOLTAGE LIMITATION - C) 15: VOLTAGE LIMITATION 16: ENCLOSURE AND PROTECTIVE COVERS - E) 17: SEPARATION - G) 18: EARTHING AND POTENTIAL EQUALIZATION - F) 19: LEAKAGE CURRENT 19.4: EARTH LEAKAGE CURRENT - F) 19.4: ENCLOSURE LEAKAGE CURRENT - G) 19.4: PATIENT LEAKAGE CURRENT - H) 19.4: PATIENT AUXILIARY CURRENT - J) 20.3: WORKING VOLTAGE MEASUREMENTS 20.4: DIELECTRIC VOLTAGE WITHSTAND 21: ENCLOSURE MECHANICAL STRENGTH - A) AND B) 21.5: HAND HELD EQUIPMENT FREE FALL 21.6: PORTABLE EQUIPMENT ROUGH HANDLING - DROP - A) 44.5: HUMIDITY 49: INTERRUPTION OF POWER SUPPLY 52: ABNORMAL OPERATION AND FAULT CONDITIONS 52.5: ABNORMAL OPERATION 56.6: MAXIMUM TEMPERATURE SHUTDOWN 57.1: CREEPAGE DISTANCES AND AIR CLEARANCES 59.2: RESISTANCE TO HEAT - BALL PRESSURE - B) 10.2.2: ENVIRONMENTAL CONDITIONS - SUPPLY MAINS 15B: VOLTAGE LIMITATION (PART 1) 15C: VOLTAGE LIMITATION (PART 2) 16E: LOW VOLTAGE RELIABILITY 52.4.1: POWER DISSIPATION LIMIT 52.5.10: OVERLOAD - HEATING PARTS - E) 52.5.2: FAILURE OF THERMOSTATS 52.5.3: SHORT -CIRCUIT OF PART OF DOUBLE INSULATION 52.5.4: INTERRUPTION OF PROTECTIVE EARTH CONDUCTOR 52.5.5: IMPAIRMENT OF COOLING 52.5.6: LOCKING OF MOVING PARTS 52.5.9: FAILURE OF COMPONENTS 57.9.1: MAINS SUPPLY TRANSFORMERS - OVERHEATING - SHORT CIRCUIT - A) 57.9.1: MAINS SUPPLY TRANSFORMERS - OVERHEATING - OVERLOAD - B) 57.9.2: MAINS SUPPLY TRANSFORMERS - DIELECTRIC STRENGTH 57.9.4: TRANSFORMER CONSTRUCTION | 2019-09-17 | |
OFF | IEC 60950-1:2005 | IEC 60950-1:2005 including all amendmends. Accepted clauses: 1.2.2.1 MAX. OUTPUT VOLTAGE, CURRENT & VA MEASUREMENT TEST 1.5.6 CAPACITOR BRIDGING INSULATION 1.6.2 INPUT TEST: SINGLE-PHASE 1.6.2 INPUT TEST: POLYPHASE 1.7.11 DURABILITY OF MARKING TEST 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS 2.1.1.7 CAPACITANCE DISCHARGE TEST 2.1.1.9 TOUCH CURRENT 2.10.10, 2.10.9 TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR INSULATING COMPOUND 2.10.11, 2.10.9 TESTS FOR SEMICONDUCTOR DEVICES AND FOR CEMENTED JOINTS 2.10.2 DETERMINATION OF WORKING VOLTAGE - HAZARDOUS VOLTAGE (CIRCUIT) MEASUREMENT 2.10.2 DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST 2.10.3.5 ELECTRIC STRENGTH TESTS FOR CIRCUITS WITH STARTING PULSES 2.10.3.9 MEASUREMENT OF TRANSIENT LEVELS 2.10.5.2, 2.10.5.13 TRANSFORMER/INSULATION ELECTRIC STRENGTH 2.10.5.5, 2.10.11 CEMENTED JOINTS 2.10.5.6, 2.10.5.13 TRANSFORMER AND WIRE INSULATION ELECTRIC STRENGTH TEST 2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL TESTS 2.2 SELV CIRCUITS 2.2.2, 2.2.3, 2.2.4 SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS 2.4 LIMITED CURRENT CIRCUIT MEASUREMENTS 2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS 2.5 LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II 2.6.4.1, 3.3.1 ENGAGEMENT-DISENGAGEMENT TEST 2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST 3.1.9 CONDUCTOR TERMINATIONS - STEADY FORCE TEST 3.3.8, 3.2.9 FIELD WIRING TEST 4.2.1 - 4.2.4 STEADY FORCE TESTS 4.2.5, 4.2.1 IMPACT TEST 4.2.6, 4.2.1 DROP TEST 4.2.7, 4.2.1 STRESS RELIEF TEST 4.2.7, 4.2.1 STRESS RELIEF TEST - ALTERNATE TEST PER IEC 60695-10-3 4.5 THERMAL REQUIREMENTS 4.5.1, 1.4.12, 1.4.13 HEATING TEST 4.5.5, 4.5 BALL PRESSURE TEST 4.6.5 BARRIER ADHESIVE TEST 5.1, ANNEX D IT TOUCH CURRENT (THREE-PHASE) 5.1, ANNEX D IT TOUCH CURRENT TEST (SINGLE-PHASE) 5.1, ANNEX D TOUCH CURRENT TEST (POLYPHASE; TN/TT SYSTEM) 5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM) 5.2.2 ELECTRIC STRENGTH TEST 5.3.1 - 5.3.9 ABNORMAL OPERATION 5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST 5.3.1, 5.3.9 ABNORMAL OPERATION TESTS 5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST 5.3.4, 5.2 ELECTRIC STRENGTH TEST (FOR SPACING DEFICIENT PWBS) 5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR 5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST 5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST 6.2.2 (6.2.2.1) ELECTRIC STRENGTH TEST PROCEDURE - IMPULSE TEST 6.2.2 (6.2.2.2) ELECTRIC STRENGTH TEST PROCEDURE - STEADY-STATE TEST ANNEX B.5, B.8 LOCKED ROTOR OVERLOAD AND ENDURANCE TESTS ANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS ANNEX K.2, 1.5.3 200 CYCLE THERMOSTAT TEST ANNEX K.3, 1.5.3 10,000 CYCLE THERMOSTAT ENDURANCE TEST ANNEX K.4, 1.5.3 1000 CYCLE TEMPERATURE LIMITER TEST ANNEX K.5, 1.5.3, 4.5.1 200 CYCLE THERMAL CUT-OUT TEST | 2019-09-17 |