Compal Electronics, Inc.

Address(es)
  • No. 500, Ruiguang Rd., Neihu District, Taipei City 11492
    Chinese Taipei

Website Not available
Status

MEMBER

Acceptance date 2019-10-22

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, ANNEX T.3 - STEADY FORCE TEST, 30 N4.4.3.2, ANNEX T.4 - STEADY FORCE TEST, 100 N4.4.3.2, ANNEX T.5 - STEADY FORCE TEST, 250 N4.4.3.3, ANNEX T.7 - DROP TEST4.4.3.4, ANNEX T.6 - IMPACT TEST4.4.3.8, ANNEX T.8 - STRESS RELIEF TEST4.8.3 – EQUIPMENT CONTAINING COIN/BUTTON CELL BATTERIES: COMPARTMENT OPENING TORQUE TEST4.8.4.2, ANNEX T.8 – EQUIPMENT CONTAINING COIN/BUTTONCELL BATTERIES: STRESS RELIEF TEST4.8.4.3 – EQUIPMENT CONTAINING COIN/BUTTON CELL BATTERIES: BATTERY REPLACEMENT TEST4.8.4.4 – EQUIPMENT CONTAINING COIN/BUTTON CELL BATTERIES: DROP TEST4.8.4.5 – EQUIPMENT CONTAINING COIN/BUTTON CELLBATTERIES: IMPACT TEST4.8.5 – EQUIPMENT CONTAINING COIN/BUTTON CELL BATTERIES: COMPLIANCE5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGYSOURCES5.4.1.4, 6.3, 9.3, B.1.5, B.2.6 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT5.4.1.3, 5.4.8 – HUMIDITY CONDITIONING5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.6.6.2 - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7, 5.7.4, 5.7.5 - Prospective touch voltage and touch currentmeasurement6.2.2.2, 6.2.2.3 - POWER MEASUREMENTS6.4.3, ANNEX B.4 - REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS8.6.2 - STATIC STABILITY8.6.3 - RELOCATION STABILITY TEST8.6.4 - GLASS SLIDE TEST8.6.5 - HORIZONTAL FORCE TEST8.7 – WALL, CEILING, OR OTHER STRUCTURE MOUNTING TESTSB.2.5 - INPUT TEST: SINGLE PHASEB.3 - SIMULATED ABNORMAL OPERATING CONDITIONSB.4 - SIMULATED SINGLE FAULT CONDITIONSF.3.10 – TEST FOR THE PERMANENCE OF MARKINGSG.5.4.6 - LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSG.5.4.6.3 - ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FORD.C. MOTORSANNEX M.3.2 – PROTECTION CIRCUITS FOR BATTERIESANNEX Q.1 - LIMITED POWER SOURCE
2020-07-14

ITAV

4.4.4.2, ANNEX T.3 – STEADY FORCE TEST, 30 N4.4.4.2, ANNEX T.4 - STEADY FORCE TEST, 100 N4.4.4.2, ANNEX T.5 - STEADY FORCE TEST, 250 N4.4.4.3, ANNEX T.7 - DROP TEST4.4.4.4, ANNEX T.6 - IMPACT TEST4.4.4.7, ANNEX T.8 - STRESS RELIEF TEST4.8.4.2, ANNEX T.8 – PRODUCTS CONTAINING LITHIUMCOIN/BUTTON CELL BATTERIES: STRESS RELIEF TEST4.8.4.3 – PRODUCTS CONTAINING LITHIUM COIN/BUTTON CELLBATTERIES: BATTERY REPLACEMENT TEST4.8.4.4 – PRODUCTS CONTAINING LITHIUM COIN/BUTTON CELL BATTERIES: DROP TEST4.8.4.5 – PRODUCTS CONTAINING LITHIUMCOIN/BUTTON CELL BATTERIES: IMPACT TEST4.8.5 – PRODUCTS CONTAINING LITHIUM COIN/BUTTONCELL BATTERIES: COMPLIANCE5.2, 5.7CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.4, Annex B.2 – MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS ANDSYSTEMS5.4.8 – HUMIDITY CONDITIONING5.4.9 – ELECTRIC STRENGTH TEST5.6.6.2(a) – RESISTANCE OF THE PROTECTIVE BONDINGSYSTEM5.7 – PROSPECTIVE TOUCH VOLTAGE AND TOUCHCURRENT MEASUREMENT5.7.5 – PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 - POWER MEASUREMENTS6.4.3, ANNEX B.4 - REDUCTION OF THE LIKELIHOOD OFIGNITION UNDER SINGLE FAULT CONDITIONS8.6.2 - STATIC STABILITY8.6.3 – RELOCATION STABILITY TEST8.6.4 – GLASS SLIDE TEST8.6.5 – HORIZONTAL FORCE TEST8.7 – WALL OR CEILING MOUNTING TESTSB.2.5 - INPUT TEST: SINGLE PHASEB.2.6 - NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 - SIMULATED ABNORMAL OPERATING CONDITIONSB.4 - SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSG.5.4.6 - LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSG.5.4.6.3 - ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FORD.C. MOTORSANNEX M.3.2 – PROTECTION CIRCUITS FOR BATTERIESANNEX Q.1 - LIMITED POWER SOURCE
2019-10-22

ITAV

5.1 POWER TRANSFER USING ES1 OR ES2 VOLTAGES, GENERAL REQUIREMENTS5.3.2 DC power transfer interconnection to other equipment5.4.1 Requirement for the PSE5.4.2 Requirement for the PD
2020-07-14

OFF

1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, ANDVOLT-AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE - PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.2.2, 2.2.3, 2.2.4, PART 22 6.1 - SELV RELIABILITY TEST2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 - Limited Power Source Measurements2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST4.1 - STABILITY TESTS4.2.1-4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 - IMPACT TEST4.2.6, 4.2.1 - Drop Test4.2.7, 4.2.1 - Stress Relief Test4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.8 - BATTERY TESTS4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST5.1, ANNEX D - TOUCH CURRENT TES5.2.2 - ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.1, 5.3.9 - ABNORMAL OPERATON TESTS5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTORTEST6.2.2 (6.2.2.1) - Electric Strength Test Procedure - Impulse Test6.2.2 (6.2.2.2) - Electric Strength Test Procedure - Steady-StateTestANNEX B.7 - LOCKED –ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY
2019-10-22

OFF

1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, ANDVOLT-AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE - PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.2.2, 2.2.3, 2.2.4, PART 22 6.1 - SELV RELIABILITY TEST2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 - Limited Power Source Measurements2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST4.1 - STABILITY TESTS4.2.1-4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 - IMPACT TEST4.2.6, 4.2.1 - Drop Test4.2.7, 4.2.1 - Stress Relief Test4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.8 - BATTERY TESTS4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST5.1, ANNEX D - TOUCH CURRENT TES5.2.2 - ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.1, 5.3.9 - ABNORMAL OPERATON TESTS5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTORTEST6.2.2 (6.2.2.1) - Electric Strength Test Procedure - Impulse Test6.2.2 (6.2.2.2) - Electric Strength Test Procedure - Steady-StateTestANNEX B.7 - LOCKED –ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY
2019-10-22

OFF

1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, ANDVOLT-AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE - PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.2.2, 2.2.3, 2.2.4, PART 22 6.1 - SELV RELIABILITY TEST2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 - Limited Power Source Measurements2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST4.1 - STABILITY TESTS4.2.1-4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 - IMPACT TEST4.2.6, 4.2.1 - Drop Test4.2.7, 4.2.1 - Stress Relief Test4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.8 - BATTERY TESTS4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST5.1, ANNEX D - TOUCH CURRENT TES5.2.2 - ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.1, 5.3.9 - ABNORMAL OPERATON TESTS5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTORTEST6.2.2 (6.2.2.1) - Electric Strength Test Procedure - Impulse Test6.2.2 (6.2.2.2) - Electric Strength Test Procedure - Steady-StateTestANNEX B.7 - LOCKED –ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY
2019-10-22