Cisco Systems Inc.

Address(es)
  • 125 W. Tasman Dr.
    San Jose, CA 95134
    San Jose
    United States of America

Website Not available
Status

WITHDRAWN

Acceptance date 2021-10-20

Further information

Stage

Country

Name

2

United States of America

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

B.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEMB.2.5 – INPUT TEST: SINGLE PHASEB.3 – SIMULATED ABNORMAL OPERATING CONDITIONS
2021-10-20

OFF

4.5.1, 1.4.12, 1.4.13 - HEATING TEST5.2.2 ELECTRIC STRENGTH TEST2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST5.3.1 5.3.9 ABNORMAL OPERATION TESTS
2021-10-20

OFF

4.5.1, 1.4.12, 1.4.13 - HEATING TEST5.2.2 ELECTRIC STRENGTH TEST2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST5.3.1 5.3.9 ABNORMAL OPERATION TESTS
2021-10-20

OFF

4.5.1, 1.4.12, 1.4.13 - HEATING TEST5.2.2 ELECTRIC STRENGTH TEST2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST5.3.1 5.3.9 ABNORMAL OPERATION TESTS
2021-10-20