Cisco Systems Inc.
Cisco Systems Inc.
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2016-06-14 |
Further information
Stage | Country | Name |
---|---|---|
2 | United States of America | |
3 | United States of America |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
ITAV | IEC 62368-1:2023 | 4.4.3.2, T.3 STEADY FORCE TEST, 30 N FOR SAFEGUARD THAT ACTS AS FIRE ENCLOSURE/BARRIER ONLY4.4.3.2, T.4 STEADY FORCE TEST, 100 N4.4.3.2, T.5 STEADY FORCE TEST, 250 N4.4.3.3, T.7 DROP TEST4.4.3.4, T.6 IMPACT TEST4.4.3.5, T.3 STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER4.4.3.8, T.8 STRESS RELIEF TEST5.2.2.1-5.2.2.6 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.2.2.6, H.2 CRITERIA FOR TELEPHONE RINGING SIGNALS – METHOD A5.2.2.6, H.3 CRITERIA FOR TELEPHONE RINGING SIGNALS – METHOD B5.4.1.3 TEST FOR HYGROSCOPIC MATERIALS5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 BALL PRESSURE TEST5.4.2.4 MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST5.4.9.1 ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.4.10, 5.4.10.2.2 SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: IMPULSE TEST5.4.10, 5.4.10.2.3 SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: STEADY STATE TEST5.4.11.3 TEST FOR SEPARATION BETWEEN EXTERNAL CIRCUITS AND EARTH5.5.2.2 CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2 RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS – Single-Phase Equipment on TN or TT System5.7.6 PROTECTIVE CONDUCTOR CURRENT5.7.8 SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS6.2.2.2, 6.2.2.3 POWER MEASUREMENTS6.2.3.1 ARCING PIS DETERMINATION6.2.3.2 RESISTIVE PIS DETERMINATION8.5.3, T.8, V ACCESSIBILITY TO MOVING PARTS8.6.2 STATIC STABILITY8.6.3.2 RELOCATION STABILITY TEST8.6.5 HORIZONTAL FORCE TEST8.7 WALL, CEILING, OR OTHER STRUCTURE MOUNTING TESTS8.8 HANDLE STRENGTH8.9 WHEEL OR CASTER SECUREMENT8.10.3 CART, STAND OR CARRIER LOADING8.10.4 CART, STAND OR CARRIER IMPACT TEST8.10.5, 8.10.1 CART, STAND OR CARRIER MECHANICAL STABILITY8.10.6, T.8 CART, STAND OR CARRIER THERMOPLASTIC TEMPERATURE STABILITY8.11.3.1 RACK MOUNTED EQUIPMENT – MOUNTING MEANS: DOWNWARD FORCE TEST8.11.3.2, 8.11.3.3 RACK MOUNTED EQUIPMENT – MOUNTING MEANS: LATERAL PUSH FORCE AND END STOPS TESTSB.2.5 INPUT TEST: POLYPHASEB.2.5 INPUT TEST: SINGLE PHASEB.2.6, 5.4.1.4, 6.3, 9.3, B.1.5 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 SIMULATED ABNORMAL OPERATING CONDITIONSB.4 SIMULATED SINGLE FAULT CONDITIONSF.3.10 TEST FOR THE PERMANENCE OF MARKINGSG.5.4.6 LOCKED-ROTOR OVERLOAD TEST FOR DC MOTORSG.7.3.2 CORD STRAIN RELIEF TESTG.7.5 NON-DETACHABLE CORD BEND PROTECTIONG.7.6.2.2, DVH STRANDED WIREQ.1 LIMITED POWER SOURCE | 2024-07-09 | |
ITAV | IEC 62368-1:2018 | 4.4.3.2, ANNEX T.3 STEADY FORCE TEST, 30 N - FOR SAFEGURAD THAT ACTS AS FIRE ENCLOSURE/BARRIER ONLY4.4.3.2, ANNEX T.4 STEADY FORCE TEST, 100 N4.4.3.2, ANNEX T.5 STEADY FORCE TEST, 250 N4.4.3.3, ANNEX T.7 DROP TEST4.4.3.4 ANNEX T.6 IMPACT TEST4.4.3.5, ANNEX T.3 STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER4.4.3.8, ANNEX T.8 STRESS RELIEF TEST5.2.2.1-5.2.2.6 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.2.2.6, ANNEX H.2 CRITERIA FOR TELEPHONE RINGING SIGNALS – METHOD A5.2.2.6, ANNEX H.3 CRITERIA FOR TELEPHONE RINGING SIGNALS – METHOD B5.4.1.3 TEST FOR HYGROSCOPIC MATERIALS5.4.1.4, Annex B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS6.3 NORMAL OPERATING CONDITIONS TEMPERATURE TEST5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 BALL PRESSURE TEST5.4.2.4 MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST5.4.9.1 ELECTRIC STRENGTH TEST - TYPE TESTING OF SOLID INSULATION5.4.10, 5.4.10.2.2 SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: IMPULSE TEST5.4.10, 5.4.10.2.3 SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: STEADY STATE TEST5.4.11.3 TEST FOR SEPARATION BETWEEN EXTERNAL CIRCUITS AND EARTH5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2(a) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT - UNEARTHED ACCESSIBLE PARTS5.7.4 TOUCH CURRENT MEASUREMENT - EARTHED ACCESSIBLE PARTS - SINGLE-PHASE EQUIPMENT ON IT SYSTEM5.7.4 TOUCH CURRENT MEASUREMENT - EARTHED ACCESSIBLE PARTS - SINGLE-PHASE EQUIPMENT ON TN OR TT SYSTEM5.7.4 TOUCH CURRENT MEASUREMENT - EARTHED ACCESSIBLE PARTS - THREE-PHASE EQUIPMENT5.7.6 PROTECTIVE CONDUCTOR CURRENT5.7.8 SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS6.2.2.2, 6.2.2.3 POWER MEASUREMENTS6.2.3.1 ARCING PIS DETERMINATION6.2.3.2 RESISTIVE PIS DETERMINATION6.6 TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION8.5.3, ANNEX T.8, ANNEX V ACCESSIBILITY TO MOVING PARTS8.6.2 STATIC STABILITY8.6.3.2 RELOCATION STABILITY TEST8.6.5 HORIZONTAL FORCE TEST8.7 WALL OR CEILING MOUNTING TESTS8.8 HANDLE STRENGTH8.9 WHEEL OR CASTER SECUREMENT8.10.3 CART, STAND OR CARRIER LOADING8.10.4 CART, STAND OR CARRIER IMPACT8.10.5, 8.10.1 CART, STAND OR CARRIER MECHANICAL STABILITY8.10.6, ANNEX T.8 CART, STAND OR CARRIER THERMOPLASTIC TEMPERATURE STABILITY8.11.3.1 RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST8.11.3.2, 8.11.3.3 RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST, 250 N, INCLUDING END STOPSB.2.5 INPUT TEST: SINGLE PHASEB.2.5 INPUT TEST: POLYPHASEB.2.6, 5.4.1.4, 6.3, 9.3, B.1.5 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 SIMULATED ABNORMAL OPERATING CONDITIONSB.4 SIMULATED SINGLE FAULT CONDITIONS6.4.2, ANNEX B.4 SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITIONANNEX DVH FIELD-WIRING TESTANNEX DVI OVERVOLTAGE TESTANNEX F.3.10 TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.4.6 LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSANNEX G.7.3.2 CORD STRAIN RELIEF TESTANNEX G.7.5 NON-DETACHABLE CORD BEND PROTECTIONANNEX G.7.6.2.2, DVH STRANDED WIREANNEX Q.1 LIMITED POWER SOURCEANNEX Q.2, 6.5.2 TEST FOR EXTERNAL CIRCUITS – PAIRED CONDUCTOR CABLEANNEX T.2 , 5.4.2.6, 5.4.3.2, G.15.2.6 STEADY FORCE TEST, 10 N | 2021-10-25 | |
ITAV | IEC 62368-1:2014 | 4.4.4.2, ANNEX T.3 STEADY FORCE TEST, 30 N FOR SAFEGUARD THAT ACTS AS FIRE ENCLOSURE/BARRIER ONLY4.4.4.2, ANNEX T.4 STEADY FORCE TEST, 100 N4.4.4.2, ANNEX T.5 STEADY FORCE TEST, 250 N4.4.4.3, ANNEX T.7 DROP TEST4.4.4.4, ANNEX T.6 IMPACT TEST4.4.4.5, ANNEX T.3 STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER4.4.4.7, ANNEX T.8 STRESS RELIEF TEST5.2.2.1-5.2.2.6 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.3 TEST FOR HYGROSCOPIC MATERIALS5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 BALL PRESSURE TEST5.4.2.4 MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST5.4.9 ELECTRIC STRENGTH TEST - TYPE TESTING OF SOLID INSULATION5.4.10, 5.4.10.2.2 SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: IMPULSE TEST5.4.10, 5.4.10.2.3 SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: STEADY STATE TEST5.4.11.3 TEST FOR SEPARATION BETWEEN EXTERNAL CIRCUITS AND EARTH5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2(a) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT - EARTHED ACCESSIBLE CONDUCTIVE PARTS - SINGLE-PHASE EQUIPMENT ON IT5.7.4 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT - EARTHED ACCESSIBLE CONDUCTIVE PARTS - SINGLE-PHASE EQUIPMENT ON TN OR TT SYSTEM5.7.4 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT - EARTHED ACCESSIBLE CONDUCTIVE PARTS - THREE-PHASE EQUIPMENT5.7.5 PROTECTIVE CONDUCTOR CURRENT5.7.7 SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS6.2.2.2, 6.2.2.3 POWER MEASUREMENTS6.2.3.1 ARCING PIS DETERMINATION6.2.3.2 RESISTIVE PIS DETERMINATION6.6 TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION8.5.3, ANNEX T.8, ANNEX V ACCESSIBILITY TO MOVING PARTS8.6.2 STATIC STABILITY8.6.3 RELOCATION STABILITY TEST8.6.5 HORIZONTAL FORCE TEST8.7 WALL OR CEILING MOUNTING TESTS8.8 HANDLE STRENGTH8.9 WHEEL OR CASTER SECUREMENT8.10.3 CART, STAND OR CARRIER LOADING8.10.4 CART, STAND OR CARRIER IMPACT8.10.5, 8.10.1 CART, STAND OR CARRIER MECHANICAL STABILITY8.10.6, ANNEX T.8 CART, STAND OR CARRIER THERMOPLASTIC TEMPERATURE STABILITY8.11.3 RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST8.11.4 RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST, 250 N, INCLUDING END STOPSB.2.5 INPUT TEST: SINGLE PHASEB.2.5 INPUT TEST: POLYPHASEB.2.6, 5.4.1.4, 6.3, 9.2, B.1.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 SIMULATED ABNORMAL OPERATING CONDITIONSB.4 SIMULATED SINGLE FAULT CONDITIONSANNEX DVH FIELD-WIRING TESTANNEX DVI OVERVOLTAGE TESTANNEX F.3.10 TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.4.6 LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSANNEX G.7.3.2 STRAIN RELIEF TESTANNEX G.7.5 NON-DETACHABLE CORD BEND PROTECTIONANNEX G.7.6.2.2, DVH STRANDED WIREANNEX H.2, 5.2.2.6 CRITERIA FOR TELEPHONE RINGING SIGNALS – METHOD AANNEX H.3, 5.2.2.6 CRITERIA FOR TELEPHONE RINGING SIGNALS – METHOD BANNEX Q.1 LIMITED POWER SOURCEANNEX Q.2, 6.5.3 TEST FOR EXTERNAL CIRCUITS – PAIRED CONDUCTOR CABLEANNEX T.2 , 5.4.2.6, 5.4.3.2, G.15.3.6 STEADY FORCE TEST, 10 N | 2020-07-07 | |
OFF | IEC 60950-1:2005 | 1.6.2 INPUT TEST: POLYPHASE"1.6.2 " INPUT: SINGLE-PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENT2.1.1.7 " CAPACITANCE DISCHARGE TEST"2.2.2, 2.2.3, 2.2.4 SELV RELIABILITY2.3.1 TNV-1, TNV-2, TNV-3 LIMITS (NORMAL)2.3.1, 2.3.4 TNV-1, TNV-2, TNV-3 LIMITS (SINGLE FAULT)2.3.1, ANNEX M.2 CRITERIA FOR TELEPHONE RINGING AND OTHER SIGNALS TEST (METHOD A EUROPE)2.3.1b, ANNEX M.3.1 - M.3.2.3 CRITERIA FOR TELEPHONE RINGING TEST (METHOD B NORTH AMERICA)2.3.2.1, 2.3.2.2 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (BASIC INSULATION)2.3.2, 2.3.2.3 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (PROTECTION BY EARTHING)2.3.2, 2.3.2.4 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (PROTECTION BY OTHER CONSTRUCTION)2.3.5 OPERATING VOLTAGES GENERATED EXTERNALLY2.4.1, 2.4.2 LIMITED CURRENT CIRCUITS MEASUREMENTS2.5 " LIMITED POWER SOURCE MEASUREMENTS"2.6.3.4, 2.6.1 " PROTECTIVE BONDING TEST I"2.6.3.4, 2.6.1 " PROTECTIVE BONDING TEST II"2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENTS3.3.8, 3.2.9 CONDUCTOR TERMINATIONS - STEADY FORCE TEST4.1 STABILITY4.2.1 - 4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1 IMPACT4.2.6, 4.2.1 DROP 4.2.7, 4.2.1 STRESS RELIEF TEST4.2.10 LOADING4.3.2 KNOB PULL/HANDLE LOADING4.3.5 CONNECTOR CURRENT INTERRUPTION4.3.8 BATTERY TESTS4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.4.2, 4.4.4 HAZARDOUS MOVING PARTS4.5.1, 1.4.12, 1.4.13 " HEATING TEST"4.5.5, 4.5 BALL PRESSURE TEST4.6.5 BARRIER ADHESIVE TEST5.1, ANNEX D TOUCH CURRENT (POLYPHASE/POLYPHASE; TN/TT SYSTEM)5.1.8.1 LIMITATION OF THE TOUCH CURRENT TO A TELECOMMUNICATIONS NETWORK AND A CABLE DISTRIBUTION SYSTEM (SINGLE-PHASE)5.1.8.3 LIMITATION OF TOUCH CURRENT DUE TO RINGING SIGNALS5.2.2 " ELECTRIC STRENGTH TEST"5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 - 5.3.9 " ABNORMAL OPERATION TESTS"5.3.4, 5.2 ELECTRIC STRENGTH TEST (FOR SPACING DEFICIENT PWB)5.3.7 " OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR"6.1.2 REQUIREMENTS FOR SEPARATION BETWEEN TELECOMMUNICATION NETWORK FROM EARTH6.2.2 (6.2.2.1) ELECTRIC STRENGTH TEST PROCEDURE (IMPULSE TEST)6.2.2 (6.2.2.2) ELECTRIC STRENGTH TEST PROCEDURE (STEADY STATE TEST)7.3, 6.2.2, 6.2.2.1 CABLE DISTRIBUTION SYSTEM, ELECTRIC STRENGTH TEST PROCEDURE, IMPULSE TEST7.3, 6.2.2, 6.2.2.2 CABLE DISTRIBUTION SYSTEM, ELECTRIC STRENGTH TEST PROCEDURE, STEADY STATE TEST7.4.2 CABLE DISTRIBUTION SYSTEMS, VOLTAGE SURGE TEST7.4.3 CABLE DISTRIBUTION SYSTEMS, IMPULSE TESTANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS | 2016-06-14 | |
OFF | IEC 60950-1:2005/AMD1:2009 | 1.6.2 INPUT TEST: POLYPHASE"1.6.2 " INPUT: SINGLE-PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENT2.1.1.7 " CAPACITANCE DISCHARGE TEST"2.2.2, 2.2.3, 2.2.4 SELV RELIABILITY2.3.1 TNV-1, TNV-2, TNV-3 LIMITS (NORMAL)2.3.1, 2.3.4 TNV-1, TNV-2, TNV-3 LIMITS (SINGLE FAULT)2.3.1, ANNEX M.2 CRITERIA FOR TELEPHONE RINGING AND OTHER SIGNALS TEST (METHOD A EUROPE)2.3.1b, ANNEX M.3.1 - M.3.2.3 CRITERIA FOR TELEPHONE RINGING TEST (METHOD B NORTH AMERICA)2.3.2.1, 2.3.2.2 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (BASIC INSULATION)2.3.2, 2.3.2.3 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (PROTECTION BY EARTHING)2.3.2, 2.3.2.4 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (PROTECTION BY OTHER CONSTRUCTION)2.3.5 OPERATING VOLTAGES GENERATED EXTERNALLY2.4.1, 2.4.2 LIMITED CURRENT CIRCUITS MEASUREMENTS2.5 " LIMITED POWER SOURCE MEASUREMENTS"2.6.3.4, 2.6.1 " PROTECTIVE BONDING TEST I"2.6.3.4, 2.6.1 " PROTECTIVE BONDING TEST II"2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENTS3.3.8, 3.2.9 CONDUCTOR TERMINATIONS - STEADY FORCE TEST4.1 STABILITY4.2.1 - 4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1 IMPACT4.2.6, 4.2.1 DROP 4.2.7, 4.2.1 STRESS RELIEF TEST4.2.10 LOADING4.3.2 KNOB PULL/HANDLE LOADING4.3.5 CONNECTOR CURRENT INTERRUPTION4.3.8 BATTERY TESTS4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.4.2, 4.4.4 HAZARDOUS MOVING PARTS4.5.1, 1.4.12, 1.4.13 " HEATING TEST"4.5.5, 4.5 BALL PRESSURE TEST4.6.5 BARRIER ADHESIVE TEST5.1, ANNEX D TOUCH CURRENT (POLYPHASE/POLYPHASE; TN/TT SYSTEM)5.1.8.1 LIMITATION OF THE TOUCH CURRENT TO A TELECOMMUNICATIONS NETWORK AND A CABLE DISTRIBUTION SYSTEM (SINGLE-PHASE)5.1.8.3 LIMITATION OF TOUCH CURRENT DUE TO RINGING SIGNALS5.2.2 " ELECTRIC STRENGTH TEST"5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 - 5.3.9 " ABNORMAL OPERATION TESTS"5.3.4, 5.2 ELECTRIC STRENGTH TEST (FOR SPACING DEFICIENT PWB)5.3.7 " OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR"6.1.2 REQUIREMENTS FOR SEPARATION BETWEEN TELECOMMUNICATION NETWORK FROM EARTH6.2.2 (6.2.2.1) ELECTRIC STRENGTH TEST PROCEDURE (IMPULSE TEST)6.2.2 (6.2.2.2) ELECTRIC STRENGTH TEST PROCEDURE (STEADY STATE TEST)7.3, 6.2.2, 6.2.2.1 CABLE DISTRIBUTION SYSTEM, ELECTRIC STRENGTH TEST PROCEDURE, IMPULSE TEST7.3, 6.2.2, 6.2.2.2 CABLE DISTRIBUTION SYSTEM, ELECTRIC STRENGTH TEST PROCEDURE, STEADY STATE TEST7.4.2 CABLE DISTRIBUTION SYSTEMS, VOLTAGE SURGE TEST7.4.3 CABLE DISTRIBUTION SYSTEMS, IMPULSE TESTANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS | 2016-06-14 | |
OFF | IEC 60950-1:2005/AMD2:2013 | 1.6.2 INPUT TEST: POLYPHASE"1.6.2 " INPUT: SINGLE-PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENT2.1.1.7 " CAPACITANCE DISCHARGE TEST"2.2.2, 2.2.3, 2.2.4 SELV RELIABILITY2.3.1 TNV-1, TNV-2, TNV-3 LIMITS (NORMAL)2.3.1, 2.3.4 TNV-1, TNV-2, TNV-3 LIMITS (SINGLE FAULT)2.3.1, ANNEX M.2 CRITERIA FOR TELEPHONE RINGING AND OTHER SIGNALS TEST (METHOD A EUROPE)2.3.1b, ANNEX M.3.1 - M.3.2.3 CRITERIA FOR TELEPHONE RINGING TEST (METHOD B NORTH AMERICA)2.3.2.1, 2.3.2.2 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (BASIC INSULATION)2.3.2, 2.3.2.3 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (PROTECTION BY EARTHING)2.3.2, 2.3.2.4 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (PROTECTION BY OTHER CONSTRUCTION)2.3.5 OPERATING VOLTAGES GENERATED EXTERNALLY2.4.1, 2.4.2 LIMITED CURRENT CIRCUITS MEASUREMENTS2.5 " LIMITED POWER SOURCE MEASUREMENTS"2.6.3.4, 2.6.1 " PROTECTIVE BONDING TEST I"2.6.3.4, 2.6.1 " PROTECTIVE BONDING TEST II"2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENTS3.3.8, 3.2.9 CONDUCTOR TERMINATIONS - STEADY FORCE TEST4.1 STABILITY4.2.1 - 4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1 IMPACT4.2.6, 4.2.1 DROP 4.2.7, 4.2.1 STRESS RELIEF TEST4.2.10 LOADING4.3.2 KNOB PULL/HANDLE LOADING4.3.5 CONNECTOR CURRENT INTERRUPTION4.3.8 BATTERY TESTS4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.4.2, 4.4.4 HAZARDOUS MOVING PARTS4.5.1, 1.4.12, 1.4.13 " HEATING TEST"4.5.5, 4.5 BALL PRESSURE TEST4.6.5 BARRIER ADHESIVE TEST5.1, ANNEX D TOUCH CURRENT (POLYPHASE/POLYPHASE; TN/TT SYSTEM)5.1.8.1 LIMITATION OF THE TOUCH CURRENT TO A TELECOMMUNICATIONS NETWORK AND A CABLE DISTRIBUTION SYSTEM (SINGLE-PHASE)5.1.8.3 LIMITATION OF TOUCH CURRENT DUE TO RINGING SIGNALS5.2.2 " ELECTRIC STRENGTH TEST"5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 - 5.3.9 " ABNORMAL OPERATION TESTS"5.3.4, 5.2 ELECTRIC STRENGTH TEST (FOR SPACING DEFICIENT PWB)5.3.7 " OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR"6.1.2 REQUIREMENTS FOR SEPARATION BETWEEN TELECOMMUNICATION NETWORK FROM EARTH6.2.2 (6.2.2.1) ELECTRIC STRENGTH TEST PROCEDURE (IMPULSE TEST)6.2.2 (6.2.2.2) ELECTRIC STRENGTH TEST PROCEDURE (STEADY STATE TEST)7.3, 6.2.2, 6.2.2.1 CABLE DISTRIBUTION SYSTEM, ELECTRIC STRENGTH TEST PROCEDURE, IMPULSE TEST7.3, 6.2.2, 6.2.2.2 CABLE DISTRIBUTION SYSTEM, ELECTRIC STRENGTH TEST PROCEDURE, STEADY STATE TEST7.4.2 CABLE DISTRIBUTION SYSTEMS, VOLTAGE SURGE TEST7.4.3 CABLE DISTRIBUTION SYSTEMS, IMPULSE TESTANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS | 2016-06-14 |