Cisco Systems (China) Research and Development Co., Ltd.

Address(es)
  • 1 Floor, Podium Lab, Xinsi Mansion, 926 Yishan Road, Caohejing Hi-tech Park,
    Shanghai
    China

Website Not available
Status

MEMBER

Acceptance date 2024-10-25

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

Accepted Clauses 4.4.3.2, Annex T.3 STEADY FORCE TEST, 30 N; 4.4.3.2, Annex T.4 STEADY FORCE TEST, 100 N; 4.4.3.2, Annex T.5 STEADY FORCE TEST, 250 N; 4.4.3.3, Annex T.7 DROP TEST; 4.4.3.4, Annex T.6 IMPACT TEST; 4.4.3.5, Annex T.3 STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER; 4.4.3.8, ANNEX T.8 STRESS RELIEF TEST; 5.2.2.1-5.2.2.6 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES; 5.4.1.8 DETERMINATION OF WORKING VOLTAGE; 5.4.2.4 MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST; 5.4.8 HUMIDITY CONDITIONING; 5.4.9 ELECTRIC STRENGTH TEST; 5.4.10, 5.4.10.2.2 SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: IMPULSE TEST; 5.4.10, 5.4.10.2.3 SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: STEADY STATE TEST; 5.4.11.3 TEST FOR SEPARATION BETWEEN EXTERNAL CIRCUITS AND EARTH; 5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR; 5.6.6.2 RESISTANCE OF THE PROTECTIVE BONDING SYSTEM; 5.7.4 TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS; 5.7.5 TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS – Single-Phase Equipment on TN or TT System; 6.2.2.2, 6.2.2.3 POWER MEASUREMENTS; 6.6 TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION; 8.5.3, Annex T.8, Annex V ACCESSIBILITY TO MOVING PARTS; 8.6.2.2 STATIC STABILITY; 8.7 WALL OR CEILING MOUNTING TESTS (TEST1 AND TEST 2); Annex B.2.5 INPUT TEST; Annex B.2.6, 5.4.1.4, 6.3, 9.3, Annex B.1.5 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT; Annex B.3 SIMULATED ABNORMAL OPERATING CONDITIONS; Annex B.4 SIMULATED SINGLE FAULT CONDITIONS; Annex G.5.4.6 LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORS; Annex G.7.6.2.2 STRANDED WIRE; Annex M.3 PROTECTION CIRCUIT FOR BATTERIES PROVIDED WITHIN THE EQUIPMENT; Annex P.2.3.2 CONSEQUENCE OF ENTRY TEST; Annex Q.1 LIMITED POWER SOURCE; Annex Q.2, 6.5.2 TEST FOR EXTERNAL CIRCUITS – PAIRED CONDUCTOR CABLE; Annex T.2, 5.4.2.6, 5.4.3.2, G.15.3.6 STEADY FORCE TEST, 10 N
2024-10-25

MEAS

Accepted Clauses 4.4 SINGLE FAULT CONDITION TESTS; 4.4.1 COMPONENT ABNORMAL; 4.4.2.3 PROTECTIVE CONDUCTOR ABNORMAL TEST; 4.4.2.8 OUTPUT ABNORMAL TEST; 4.4.2.10 COOLING ABNORMAL; 5.1.3 MAINS SUPPLY; 5.3 DURABILITY OF MARKINGS TEST; 6.2 DETERMINATION OF ACCESSIBLE PARTS; 6.3 LIMIT VALUES FOR ACCESSIBLE PARTS (required in Normal Condition and after Single Fault Condition); 6.5.2.4 BONDING IMPEDANCE OF PLUG CONNECTED EQUIPMENT; 6.5.2.5 BONDING IMPEDANCE OF PERMANENTLY CONNECTED EQUIPMENT; 6.7 INSULATION REQUIREMENTS; 6.8 DIELECTRIC VOLTAGE WITHSTAND TEST; 6.8.2 HUMIDITY PRECONDITIONING; 6.10.3 CAPACITOR DISCHARGE TEST; 7.6 WALL MOUNTING TEST; 8.2.1 ENCLOSURE RIGIDITY TEST (STATIC TEST); 8.2.2 ENCLOSURE RIGIDITY TEST (IMPACT TEST); 8.3.1 DROP TEST; 9.4 LIMITED ENERGY CIRCUIT DETERMINATION TEST; 10.1-10.4 TEMPERATURE TES; 10.5.2 RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURES
2024-10-25

MEAS

Accepted Clauses 4.4 SINGLE FAULT CONDITION TESTS; 4.4.1 COMPONENT ABNORMAL; 4.4.2.3 PROTECTIVE CONDUCTOR ABNORMAL TEST; 4.4.2.8 OUTPUT ABNORMAL TEST; 4.4.2.10 COOLING ABNORMAL; 5.1.3 MAINS SUPPLY; 5.3 DURABILITY OF MARKINGS TEST; 6.2 DETERMINATION OF ACCESSIBLE PARTS; 6.3 LIMIT VALUES FOR ACCESSIBLE PARTS (required in Normal Condition and after Single Fault Condition); 6.5.2.4 BONDING IMPEDANCE OF PLUG CONNECTED EQUIPMENT; 6.5.2.5 BONDING IMPEDANCE OF PERMANENTLY CONNECTED EQUIPMENT; 6.7 INSULATION REQUIREMENTS; 6.8 DIELECTRIC VOLTAGE WITHSTAND TEST; 6.8.2 HUMIDITY PRECONDITIONING; 6.10.3 CAPACITOR DISCHARGE TEST; 7.6 WALL MOUNTING TEST; 8.2.1 ENCLOSURE RIGIDITY TEST (STATIC TEST); 8.2.2 ENCLOSURE RIGIDITY TEST (IMPACT TEST); 8.3.1 DROP TEST; 9.4 LIMITED ENERGY CIRCUIT DETERMINATION TEST; 10.1-10.4 TEMPERATURE TES; 10.5.2 RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURES
2024-10-25

MEAS

Accepted Clauses 10.4.1.100-10.4.1.103 TEMPERATURE TEST
2024-10-25

OFF

Accepted Clauses 1.6.2 INPUT TEST; 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENT; 2.1.1.7 CAPACITANCE DISCHARGE TEST; 2.2.2, 2.2.3, 2.2.4 SELV RELIABILITY; 2.3.1 TNV-1, TNV-2, TNV-3 LIMITS (NORMAL); 2.3.1, 2.3.4 TNV-1, TNV-2, TNV-3 LIMITS (SINGLE FAULT); 2.3.2.1, 2.3.2.2 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (BASIC INSULATION); 2.3.2, 2.3.2.3 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (PROTECTION BY EARTHING); 2.3.2, 2.3.2.4 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (PROTECTION BY OTHER CONSTRUCTION); 2.4.1, 2.4.2 LIMITED CURRENT CIRCUITS MEASUREMENTS; 2.5 LIMITED POWER SOURCE MEASUREMENTS; 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST; 2.9.2 HUMIDITY TEST; 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENTS; 3.3.8, 3.2.9 CONDUCTOR TERMINATIONS - STEADY FORCE TEST; 4.1 STABILITY; 4.2.1 - 4.2.4 STEADY FORCE TESTS; 4.2.5, 4.2.1 IMPACT; 4.2.7, 4.2.1 STRESS RELIEF TEST; 4.2.10 LOADING; 4.3.5 CONNECTOR CURRENT INTERRUPTION; 4.3.8 BATTERY TESTS; 4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST; 4.4.2, 4.4.4 HAZARDOUS MOVING PARTS; 4.5.1, 1.4.12, 1.4.13 HEATING TEST; 5.1, ANNEX D TOUCH CURRENT (POLYPHASE/POLYPHASE; TN/TT SYSTEM); 5.2.2 ELECTRIC STRENGTH TEST; 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST; 5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS; 5.3.4, 5.2 ELECTRIC STRENGTH TEST (FOR SPACING DEFICIENT PWB); 5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR; 6.1.2 REQUIREMENTS FOR SEPARATION BETWEEN TELECOMMUNICATION NETWORK FROM EARTH; 6.2.2, 6.2.2.1 ELECTRIC STRENGTH TEST PROCEDURE (IMPULSE TEST); 6.2.2, 6.2.2.2 ELECTRIC STRENGTH TEST PROCEDURE (STEADY STATE TEST); Annex B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2024-10-25

OFF

Accepted Clauses 1.6.2 INPUT TEST; 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENT; 2.1.1.7 CAPACITANCE DISCHARGE TEST; 2.2.2, 2.2.3, 2.2.4 SELV RELIABILITY; 2.3.1 TNV-1, TNV-2, TNV-3 LIMITS (NORMAL); 2.3.1, 2.3.4 TNV-1, TNV-2, TNV-3 LIMITS (SINGLE FAULT); 2.3.2.1, 2.3.2.2 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (BASIC INSULATION); 2.3.2, 2.3.2.3 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (PROTECTION BY EARTHING); 2.3.2, 2.3.2.4 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (PROTECTION BY OTHER CONSTRUCTION); 2.4.1, 2.4.2 LIMITED CURRENT CIRCUITS MEASUREMENTS; 2.5 LIMITED POWER SOURCE MEASUREMENTS; 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST; 2.9.2 HUMIDITY TEST; 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENTS; 3.3.8, 3.2.9 CONDUCTOR TERMINATIONS - STEADY FORCE TEST; 4.1 STABILITY; 4.2.1 - 4.2.4 STEADY FORCE TESTS; 4.2.5, 4.2.1 IMPACT; 4.2.7, 4.2.1 STRESS RELIEF TEST; 4.2.10 LOADING; 4.3.5 CONNECTOR CURRENT INTERRUPTION; 4.3.8 BATTERY TESTS; 4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST; 4.4.2, 4.4.4 HAZARDOUS MOVING PARTS; 4.5.1, 1.4.12, 1.4.13 HEATING TEST; 5.1, ANNEX D TOUCH CURRENT (POLYPHASE/POLYPHASE; TN/TT SYSTEM); 5.2.2 ELECTRIC STRENGTH TEST; 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST; 5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS; 5.3.4, 5.2 ELECTRIC STRENGTH TEST (FOR SPACING DEFICIENT PWB); 5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR; 6.1.2 REQUIREMENTS FOR SEPARATION BETWEEN TELECOMMUNICATION NETWORK FROM EARTH; 6.2.2, 6.2.2.1 ELECTRIC STRENGTH TEST PROCEDURE (IMPULSE TEST); 6.2.2, 6.2.2.2 ELECTRIC STRENGTH TEST PROCEDURE (STEADY STATE TEST); Annex B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2024-10-25

OFF

Accepted Clauses 1.6.2 INPUT TEST; 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENT; 2.1.1.7 CAPACITANCE DISCHARGE TEST; 2.2.2, 2.2.3, 2.2.4 SELV RELIABILITY; 2.3.1 TNV-1, TNV-2, TNV-3 LIMITS (NORMAL); 2.3.1, 2.3.4 TNV-1, TNV-2, TNV-3 LIMITS (SINGLE FAULT); 2.3.2.1, 2.3.2.2 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (BASIC INSULATION); 2.3.2, 2.3.2.3 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (PROTECTION BY EARTHING); 2.3.2, 2.3.2.4 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (PROTECTION BY OTHER CONSTRUCTION); 2.4.1, 2.4.2 LIMITED CURRENT CIRCUITS MEASUREMENTS; 2.5 LIMITED POWER SOURCE MEASUREMENTS; 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST; 2.9.2 HUMIDITY TEST; 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENTS; 3.3.8, 3.2.9 CONDUCTOR TERMINATIONS - STEADY FORCE TEST; 4.1 STABILITY; 4.2.1 - 4.2.4 STEADY FORCE TESTS; 4.2.5, 4.2.1 IMPACT; 4.2.7, 4.2.1 STRESS RELIEF TEST; 4.2.10 LOADING; 4.3.5 CONNECTOR CURRENT INTERRUPTION; 4.3.8 BATTERY TESTS; 4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST; 4.4.2, 4.4.4 HAZARDOUS MOVING PARTS; 4.5.1, 1.4.12, 1.4.13 HEATING TEST; 5.1, ANNEX D TOUCH CURRENT (POLYPHASE/POLYPHASE; TN/TT SYSTEM); 5.2.2 ELECTRIC STRENGTH TEST; 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST; 5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS; 5.3.4, 5.2 ELECTRIC STRENGTH TEST (FOR SPACING DEFICIENT PWB); 5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR; 6.1.2 REQUIREMENTS FOR SEPARATION BETWEEN TELECOMMUNICATION NETWORK FROM EARTH; 6.2.2, 6.2.2.1 ELECTRIC STRENGTH TEST PROCEDURE (IMPULSE TEST); 6.2.2, 6.2.2.2 ELECTRIC STRENGTH TEST PROCEDURE (STEADY STATE TEST); Annex B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2024-10-25