CHICONY POWER TECHNOLOGY CO LTD

Address(es)
  • 27F., No.69, Sec. 2, Guangfu Rd., Sanchong Dist., New Taipei City 241
    Chinese Taipei

Website Not available
Status

MEMBER

Acceptance date 2018-03-16

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: MOMENT TEST4.4.3.2, T.5 Steady Force Test, 250N4.4.3.4, T.6 Impact Test4.4.3.3, T.7 Drop Test4.4.3.8, T.8 Stress Relief Test4.4.3.2, T.3 Steady Force Test, 30N4.4.3.2, T.4 Steady Force Test, 100N5.2.2.1-5.2.2.6 Classification of Electrical Energy Sources5.4.1.8 Determination of Working Voltage5.4.1.10.3 Ball Pressure Test5.4.4.6.2 Separable Thin Sheet Material5.4.4.6.3, 5.4.4.6.4, 5.4.4.6.5 Non-separable Thin Sheet Material5.4.2, 5.4.3 Clearance and Creepage Distance MeasurementT.2, 5.4.2.6, 5.4.3.2, G.15.2.6 Steady Force Test, 10N5.4.1.3 Test for Hygroscopic Materials5.4.8 Humidity Conditioning5.4.9.1 Electric Strength Test - Type Testing of Solid Insulation5.5.2.2 Capacitor Discharge After Disconnection of A Connector5.6.6.2 Resistance of The Protective Bonding System5.7.4 Touch Voltage and Touch Current Measurement - Unearthed Accessible Parts (5.7.4)5.7.5 Touch Current Measurement - Earthed Accessible Conductive Parts5.7.6 Protective Conductor Current6.2.2.2, 6.2.2.3 Power Measurements6.2.3.2 Resistive PIS DeterminationB.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 Normal Operating Conditions Temperature MeasurementB.2.5 Input Test : Single PhaseB.3 Simulated Abnormal Operation ConditionsB.4 Simulated Single Fault ConditionsF.3.10 Test for the permanence of markingsG.5.3.3 Transformer OverloadG.7.3.2 Cord Strain Relief TestQ.1 Limited Power Source
2020-04-16

ITAV

4.7 Equipment for Direct Insertion into Mains Socket-Outlets: Moment Test4.4.4.2, T.5 Steady Force Test, 250N4.4.4.4, T.6 Impact Test4.4.4.3, T.7 Drop Test4.4.4.7, T.8 Stress Relief Test4.4.4.2, T.3 Steady Force Test, 30N4.4.4.2, T.4 Steady Force Test, 100N5.2.2.2 Steady-State Voltage and Current5.4.1.4, 6.3.2, 9 Temperature Tests5.4.1.8 Determination of Working Voltage5.4.1.10.3 Ball Pressure Test5.4.4.6.2 Separable Thin Sheet Material5.4.4.6.4, 5.4.4.6.5 Non-separable Thin Sheet Material5.4.2, 5.4.3 Clearance and Creepage Distance Measurement5.4.2.6, T.2 Steady Force Test, 10N5.4.8 Humidity Conditioning5.4.9.1 Electric Strength5.5.2.2 Stored Discharge on Capacitors5.6.6.2 Resistance of The Protective Bonding System5.7 Prospective Touch Voltage And Touch Current Measurement5.7.5 Protective Conductor Current6.2.2 Power Measurements6.2.3.2 Resistive PIS DeterminationB.2.5 Input CurrentB.3, B.4 Abnormal Operating and Fault ConditionsF.3.10 Test for the permanence of markingsG.5.3.3 Transformer Overloaded TestG.7.3.2 Strain Relief TestQ.1 Limited Power Source
2019-03-20

ITAV

5.1 Power Transfer Using ES1 or ES2 Voltages, General Requirements5.3.1 DC Power Transfer Interconnection to Building Wiring5.3.2 DC Power Transfer Interconnection to Other Equipment5.4.1 Requirement for the PSE
2022-08-15

OFF

1.2.2.1 Maximum Output Voltage, Current, And Volt Ampere Measurement Test1.6.2 Input: Single-Phase1.7.11 Durability Of Marking Test2.1.1.5, 2.1.2, 1.2.8.10 Energy hazard measurements2.1.1.7 Capacitance Discharge Test2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV Reliability Test Including Hazardous Voltage Measurements2.4.1, 2.4.2 Limited Current Circuit Measurements2.5 Limited Power Source Measurements2.6.3.4, 2.6.1 Protective Bonding Test I2.6.3.4, 2.6.1 Protective Bonding Test II2.9.1, 2.9.2, 5.2.2 Humidity Test2.10.2 Determination of Working Voltage; Voltage Measurement Test2.10.5.9, 2.10.5.10, 2.10.5.6 Thin Sheet Material Tests2.10.5.6, 2.10.5.13 Transformer and Wire Insulation Electric Strength Test3.2.6, 4.2.1, 4.2.7 Strain Relief Test4.2.1-4.2.4 Steady Force Tests (Enclosure Push Test)4.2.5, 4.2.1, Part 22 10.2 Impact Test4.2.6, 4.2.1 Drop Test4.2.7, 4.2.1 Stress Relief Test4.3.5 Connector Current Interruption Test4.3.6 Direct Plug In Equipment-Moment Test4.5.1, 4.5.2, 1.4.12, 1.4.13 Heating Test4.5.5, 4.5 Ball Pressure Test5.1, ANNEX D Touch Current Test (Single-Phase; TN/TT System)5.2.2 Electric Strength Test5.3.1, 5.3.4, 5.3.7 Component Failure Test5.3.1 - 5.3.9 Abnormal Operation Tests5.3.3, 5.3.7b, Annex C.1 Transformer Abnormal Operation Test5.3.7 Power Supply Output Short-Circuit/Overload Test5.3.7 Overload of Operator Accessible Connector Test
2019-03-20

OFF

1.2.2.1 Maximum Output Voltage, Current, And Volt Ampere Measurement Test1.6.2 Input: Single-Phase1.7.11 Durability Of Marking Test2.1.1.5, 2.1.2, 1.2.8.10 Energy hazard measurements2.1.1.7 Capacitance Discharge Test2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV Reliability Test Including Hazardous Voltage Measurements2.4.1, 2.4.2 Limited Current Circuit Measurements2.5 Limited Power Source Measurements2.6.3.4, 2.6.1 Protective Bonding Test I2.6.3.4, 2.6.1 Protective Bonding Test II2.9.1, 2.9.2, 5.2.2 Humidity Test2.10.2 Determination of Working Voltage; Voltage Measurement Test2.10.5.9, 2.10.5.10, 2.10.5.6 Thin Sheet Material Tests2.10.5.6, 2.10.5.13 Transformer and Wire Insulation Electric Strength Test3.2.6, 4.2.1, 4.2.7 Strain Relief Test4.2.1-4.2.4 Steady Force Tests (Enclosure Push Test)4.2.5, 4.2.1, Part 22 10.2 Impact Test4.2.6, 4.2.1 Drop Test4.2.7, 4.2.1 Stress Relief Test4.3.5 Connector Current Interruption Test4.3.6 Direct Plug In Equipment-Moment Test4.5.1, 4.5.2, 1.4.12, 1.4.13 Heating Test4.5.5, 4.5 Ball Pressure Test5.1, ANNEX D Touch Current Test (Single-Phase; TN/TT System)5.2.2 Electric Strength Test5.3.1, 5.3.4, 5.3.7 Component Failure Test5.3.1 - 5.3.9 Abnormal Operation Tests5.3.3, 5.3.7b, Annex C.1 Transformer Abnormal Operation Test5.3.7 Power Supply Output Short-Circuit/Overload Test5.3.7 Overload of Operator Accessible Connector Test
2019-03-20

OFF

1.2.2.1 Maximum Output Voltage, Current, And Volt Ampere Measurement Test1.6.2 Input: Single-Phase1.7.11 Durability Of Marking Test2.1.1.5, 2.1.2, 1.2.8.10 Energy hazard measurements2.1.1.7 Capacitance Discharge Test2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV Reliability Test Including Hazardous Voltage Measurements2.4.1, 2.4.2 Limited Current Circuit Measurements2.5 Limited Power Source Measurements2.6.3.4, 2.6.1 Protective Bonding Test I2.6.3.4, 2.6.1 Protective Bonding Test II2.9.1, 2.9.2, 5.2.2 Humidity Test2.10.2 Determination of Working Voltage; Voltage Measurement Test2.10.5.9, 2.10.5.10, 2.10.5.6 Thin Sheet Material Tests2.10.5.6, 2.10.5.13 Transformer and Wire Insulation Electric Strength Test3.2.6, 4.2.1, 4.2.7 Strain Relief Test4.2.1-4.2.4 Steady Force Tests (Enclosure Push Test)4.2.5, 4.2.1, Part 22 10.2 Impact Test4.2.6, 4.2.1 Drop Test4.2.7, 4.2.1 Stress Relief Test4.3.5 Connector Current Interruption Test4.3.6 Direct Plug In Equipment-Moment Test4.5.1, 4.5.2, 1.4.12, 1.4.13 Heating Test4.5.5, 4.5 Ball Pressure Test5.1, ANNEX D Touch Current Test (Single-Phase; TN/TT System)5.2.2 Electric Strength Test5.3.1, 5.3.4, 5.3.7 Component Failure Test5.3.1 - 5.3.9 Abnormal Operation Tests5.3.3, 5.3.7b, Annex C.1 Transformer Abnormal Operation Test5.3.7 Power Supply Output Short-Circuit/Overload Test5.3.7 Overload of Operator Accessible Connector Test
2019-03-20