Celxpert Energy Corp.

Address(es)
  • NO 128
    GONG WU RD
    LUNG TAN
    TW-325 TAOYUAN
    Chinese Taipei

Website Not available
Status

MEMBER

Acceptance date 2009-07-23

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

Accepted clauses as below:4.4.3.2, ANNEX T.4 – STEADY FORCE TEST, 100 N4.4.3.3, ANNEX T.7 – DROP TEST4.4.3.8, ANNEX T.8 – STRESS RELIEF TEST6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS6.2.3.2 – RESISTIVE PIS DETERMINATIONB.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 – NORMAL OPERATINGCONDITIONS TEMPERATURE MEASUREMENTANNEX M.3.2 – PROTECTION CIRCUITS FOR BATTERIESANNEX M.4.2 –PORTABLE SECONDARY LITHIUM BATTERYCHARGING SAFEGUARDSANNEX M.4.4, ANNEX T.7 – DROP TEST OF EQUIPMENTCONTAINING A SECONDARY LITHIUM BATTERYANNEX M.5, ANNEX P.2.3 – RISK OF BURN DUE TOSHORT-CIRCUIT DURING CARRYINGANNEX Q.1 – LIMITED POWER SOURCE
2020-07-08

ITAV

Accepted clauses as below:STEADY FORCE TEST, 100 N (4.4.4.2, ANNEX T.4)DROP TEST (4.4.4.3, ANNEX T.7)STRESS RELIEF TEST (4.4.4.7, ANNEX T.8)POWER MEASUREMENTS (6.2.2.2, 6.2.2.3)RESISTIVE PIS DETERMINATION (6.2.3.2)MAXIMUM OPERATING TEMPERATURE FOR MATERIALS,COMPONENTS AND SYSTEMS (5.4.1.4, 6.2, 9.2.5 ANNEXB.2)PROTECTION CIRCUITS FOR BATTERIES (ANNEX M.3.2)SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDS(ANNEX M.4.2)DROP TEST OF EQUIPMENT CONTAINING A SECONDARYLITHIUM BATTERY (ANNEX M.4.4, ANNEX T.7)RISK OF BURN DUE TO SHORT-CIRCUIT DURINGCARRYING (ANNEX M.5, ANNEX P.2.3)LIMITED POWER SOURCE (ANNEX Q.1)
2019-08-13

OFF

Accepted clauses as below:1.7.11 DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS4.2.1-4.2.4 STEADY FORCE TESTS4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.3.8 BATTERY TESTS4.5.1, 1.4.12, 1.4.13 HEATING TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST
2019-10-04

OFF

Accepted clauses as below:1.7.11 DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS4.2.1-4.2.4 STEADY FORCE TESTS4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.3.8 BATTERY TESTS4.5.1, 1.4.12, 1.4.13 HEATING TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST
2019-10-04

OFF

Accepted clauses as below:1.7.11 DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS4.2.1-4.2.4 STEADY FORCE TESTS4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.3.8 BATTERY TESTS4.5.1, 1.4.12, 1.4.13 HEATING TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST
2019-10-04