Beko Europe Fabriano EES

Address(es)
  • viale Campo Sportivo 35
    IT-60044 Fabriano
    AN
    Italy

Website Not available
Status

MEMBER

Acceptance date 2024-12-06

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

CONT

Accepted Clauses:§ 5 Information§ 6 Protection against electric shock§ 7.3 Adequacy of earth connection§ 9.2.5 Protective impedance§ 9.4.16 Type 1.Y or 2.Y (electronic disconnection on operation)§ 11.4 Solid Insulation§ 12 Components§ 13 Fault assessment on electronic circuits§ 14.2 Protection against humid conditions§ 14.3 Touch current test for in-line cord controls and free-standing controls§ 15 Electric strength and Insulation Resistance§ 16 Heating§ 18.2 Environmental stress of temperature§ 19 Endurance§ 22 Resistance to corrosion§ 24.2 Operation within the voltage rangeAnnex H.19.1.3.3 Thermal cycling testAnnex H.13.2 Fault assessment to ensure functional safetyAnnex A - Indelibility of markings
2024-12-06

CONT

Accepted Clauses:§ 7 Information§ 8 Protection against electric shock§ 9.3 Adequacy of earth connection§ 12.2 Protection against humid conditions§ 12.3 Leakage current§ 13 Electric strength and Insulation Resistance§ 14 Heating§ 16.2 Environmental stress of temperature§ 17 Endurance§ 20.3 Solid Insulation§ 22 Resistance to corrosion§ 24 Components§ 25.2 Over voltage and Under voltage testAnnex H.8 Protection against electric shockAnnex H.11.4.16 Electronic disconnectionAnnex H.17.1.4.2 Thermal cycling testAnnex H.27 Abnormal operationAnnex A - Indelibility of markings
2024-12-06

CONT

Accepted Clauses:§ 7 Information§ 8 Protection against electric shock§ 9.3 Adequacy of earth connection§ 12.2 Protection against humid conditions§ 12.3 Leakage current§ 13 Electric strength and Insulation Resistance§ 14 Heating§ 16.2 Environmental stress of temperature§ 17 Endurance§ 20.3 Solid Insulation§ 22 Resistance to corrosion§ 24 Components§ 25.2 Over voltage and Under voltage testAnnex H.8 Protection against electric shockAnnex H.11.4.16 Electronic disconnectionAnnex H.17.1.4.2 Thermal cycling testAnnex H.27 Abnormal operationAnnex A - Indelibility of markings
2024-12-06

CONT

Accepted Clauses:§ 7 Information§ 8 Protection against electric shock§ 9.3 Adequacy of earth connection§ 12.2 Protection against humid conditions§ 12.3 Leakage current§ 13 Electric strength and Insulation Resistance§ 14 Heating§ 16.2 Environmental stress of temperature§ 17 Endurance§ 20.3 Solid Insulation§ 22 Resistance to corrosion§ 24 Components§ 25.2 Over voltage and Under voltage testAnnex H.8 Protection against electric shockAnnex H.11.4.16 Electronic disconnectionAnnex H.17.1.4.2 Thermal cycling testAnnex H.27 Abnormal operationAnnex A - Indelibility of markings
2024-12-06

CONT

Accepted Clauses:§ 7 Information§ 8 Protection against electric shock§ 9.3 Adequacy of earth connection§ 12.2 Protection against humid conditions§ 12.3 Leakage current§ 13 Electric strength and Insulation Resistance§ 14 Heating§ 16.2 Environmental stress of temperature§ 17 Endurance§ 20.3 Solid Insulation§ 22 Resistance to corrosion§ 24 Components§ 27.3 Over voltage and Under voltage testAnnex H.8 Protection against electric shockAnnex H.11.4.16 Electronic disconnectionAnnex H.17.1.4.2 Thermal cycling testAnnex H.27 Abnormal operationAnnex A - Indelibility of markings
2024-12-06

CONT

Accepted Clauses:§ 7 Information§ 8 Protection against electric shock§ 9.3 Adequacy of earth connection§ 12.2 Protection against humid conditions§ 12.3 Leakage current§ 13 Electric strength and Insulation Resistance§ 14 Heating§ 16.2 Environmental stress of temperature§ 17 Endurance§ 20.3 Solid Insulation§ 22 Resistance to corrosion§ 24 Components§ 25.2 Over voltage and Under voltage testAnnex H.8 Protection against electric shockAnnex H.11.4.16 Electronic disconnectionAnnex H.17.1.4.2 Thermal cycling testAnnex H.27 Abnormal operationAnnex A - Indelibility of markings
2024-12-06

CONT

Accepted Clauses:§ 7 Information§ 8 Protection against electric shock§ 9.3 Adequacy of earth connection§ 12.2 Protection against humid conditions§ 12.3 Leakage current§ 13 Electric strength and Insulation Resistance§ 14 Heating§ 16.2 Environmental stress of temperature§ 17 Endurance§ 20.3 Solid Insulation§ 22 Resistance to corrosion§ 24 Components§ 25.2 Over voltage and Under voltage testAnnex H.8 Protection against electric shockAnnex H.11.4.16 Electronic disconnectionAnnex H.17.1.4.2 Thermal cycling testAnnex H.27 Abnormal operationAnnex A - Indelibility of markings
2024-12-06

CONT

Accepted Clauses:§ 7 Information§ 8 Protection against electric shock§ 9.3 Adequacy of earth connection§ 12.2 Protection against humid conditions§ 12.3 Leakage current§ 13 Electric strength and Insulation Resistance§ 14 Heating§ 16.2 Environmental stress of temperature§ 17 Endurance§ 20.3 Solid Insulation§ 22 Resistance to corrosion§ 24 Components§ 25.2 Over voltage and Under voltage testAnnex H.8 Protection against electric shockAnnex H.11.4.16 Electronic disconnectionAnnex H.17.1.4.2 Thermal cycling testAnnex H.27 Abnormal operationAnnex A - Indelibility of markings
2024-12-06

CONT

Accepted Clauses:§ 7 Information§ 8 Protection against electric shock§ 9.3 Adequacy of earth connection§ 12.2 Protection against humid conditions§ 12.3 Leakage current§ 13 Electric strength and Insulation Resistance§ 14 Heating§ 16.2 Environmental stress of temperature§ 17 Endurance§ 20.3 Solid Insulation§ 22 Resistance to corrosion§ 24 Components§ 25.2 Over voltage and Under voltage testAnnex H.8 Protection against electric shockAnnex H.11.4.16 Electronic disconnectionAnnex H.17.1.4.2 Thermal cycling testAnnex H.27 Abnormal operationAnnex A - Indelibility of markings
2024-12-06

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-02

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-06

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-06

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-02

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-02

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-06

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-06

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-06

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-06

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-06

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-06

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-06

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-06

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-06

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-06

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-06

HOUS

2024-12-06

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-06

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-06

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-06

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-06

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-06

HOUS

Accepted clauses:§7 Marking and instructions§11 Heating§13 Leakage current and electric strength at operating temperature§14 Transient overvoltages§15 Moisture resistance, limited to clause §15.3 only§16 Leakage current and electric strength§17 Overload protection of transformers and associated circuits§19 Abnormal operationlimited to sub-clauses §19.1, §19.7, §19.8, §19.9, §19.10, §19.11.1, §19.11.2, §19.11.3, §19.11.4.8, §19.12, §19.13, §19.14, §19.15 only§22 Construction, limited to sub-clause §22.5 only§24 Components§27 Provision for earthing§29 Clearances, creepage distances and solid insulation§31 Resistance to rusting
2024-12-06