Barco N.V.

Address(es)
  • President Kennedypark 35
    BE-8500 Kortrijk
    Belgium

Website Not available
Status

MEMBER

Acceptance date 2005-10-11

Further information

Stage

Country

Name

3

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

6.2.2.2, 6.2.2.3 Power measurementsB.2.5 Input testF.3.10 TEST FOR THE PERMANENCE OF MARKINGS5.3.2.2 Contact requirements5.5.2.2 Safeguards against capacitor discharge after disconnection of a connector5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES Annex Q, 6.6 Circuits intended for interconnection with building wiring, LIMITED POWER SOURCE, TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION5.6.6.2 Resistance of the protective bonding system5.4.1.3, 5.4.8 Test for hygroscopic materials. Humidity conditioning8.6.2 STATIC STABILITYT.2, T.3, T.4, T.5 Steady force tests, 10N, 30N, 100N, 250N4.4.4.4, T.6 Impact test4.4.4.3, T.7 Drop test4.4.7, T.8 Stress relief testM.3.2 M.3 Protection circuits for batteries provided within the equipment5.4.1.4, 6.2, 9.2.5 ANNEX B.2 Maximum operating temperature for materials, components and systems5.4.1.10.3 BALL PRESSURE TEST5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES, PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.4.9 Electric strength testB.3 SIMULATED ABNORMAL OPERATING CONDITIONSB.4 SIMULATED SINGLE FAULT CONDITIONS 6.2.2.2 Power measurementsG.5.4.5, G.5.4.6 RUNNING OVERLOAD TEST FOR D.C. MOTORS, LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORS8.7 WALL, CEILING, OR OTHER STRUCTURE MOUNTING TESTS6.2.3.2 Resistive PIS Determination8.6.4 Glass Slide testT.9 Glass Impact testT.10 Glass Fragmentation testV Accessibility to Moving Parts
2021-12-21

ITAV

6.2.2.2, 6.2.2.3 Power measurementsB.2.5 Input testF.3.10 TEST FOR THE PERMANENCE OF MARKINGS5.3.2.2 Contact requirements5.5.2.2 Safeguards against capacitor discharge after disconnection of a connector5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES Annex Q, 6.6 Circuits intended for interconnection with building wiring, LIMITED POWER SOURCE, TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION5.6.6.2 Resistance of the protective bonding system5.4.1.3, 5.4.8 Test for hygroscopic materials. Humidity conditioning8.6.2 STATIC STABILITYT.2, T.3, T.4, T.5 Steady force tests, 10N, 30N, 100N, 250N4.4.4.4, T.6 Impact test4.4.4.3, T.7 Drop test4.4.7, T.8 Stress relief testM.3.2 M.3 Protection circuits for batteries provided within the equipment5.4.1.4, 6.2, 9.2.5 ANNEX B.2 Maximum operating temperature for materials, components and systems5.4.1.10.3 BALL PRESSURE TEST5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES, PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.4.9 Electric strength testB.3 SIMULATED ABNORMAL OPERATING CONDITIONSB.4 SIMULATED SINGLE FAULT CONDITIONS 6.2.2.2 Power measurementsG.5.4.5, G.5.4.6 RUNNING OVERLOAD TEST FOR D.C. MOTORS, LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORS
2020-12-14

MED

11 TEMPERATURE15.5.2 TRANSFORMER DIELECTRIC VOLTAGE WITHSTAND4.11 POWER INPUT5.7 HUMIDITY CONDITIONING 7.1.2 LEGIBILITY OF MARKINGS7.1.3 DURABILITY OF MARKINGS8.4.4 VOLTAGE LIMITATION (PART 2)8.5.4 WORKING VOLTAGE9.4.3.2 INSTABILITY EXCLUDING TRANSPORT
2018-12-22

MED

11 TEMPERATURE13.1.2 POWER AVAILABILITY15.4.3 BATTERIES15.4.3 REVERSED BATTERY CONNECTION/OVERCHARGING15.5.2 TRANSFORMER DIELECTRIC VOLTAGE WITHSTAND4.11 POWER INPUT5.7 HUMIDITY CONDITIONING 5.9.2 DETERMINATION OF ACCESSIBLE PARTS7.1.2 LEGIBILITY OF MARKINGS8.4.3 VOLTAGE OR CHARGE LIMITATION8.4.4 VOLTAGE LIMITATION (PART 2)8.5.4 WORKING VOLTAGE8.7 LEAKAGE CURRENTS 8.7.3 E NON-FREQUENCY WEIGHTED LEAKAGE CURRENT 8.7.4.5 EARTH LEAKGE CURRENT 8.7.4.6 TOUCH LEAKAGE CURRENT8.7.4.7 A PATIENT LEAKAGE CURRENT8.7.4.7 B PATIENT LEAKAGE CURRENT, MAINS ON F-TYPE APPLIED PART8.7.4.7 C PATIENT LEAKAGE CURRENT, MAINS ON INPUT/OUTPUT8.7.4.7 D PATIENT LEAKAGE CURRENT MAINS ON NON-PE ENCLOSURE 8.7.4.7 H TOTAL PATIENT LEAKAGE CURRENT8.7.4.8 PATIENT AUXILIARY CURRENT8.8.3 DIELECTRIC VOLTAGE WITHSTAND9.4.2 STABILITY AND TRANSPORTABILITY9.4.3.1 INSTABILITY FROM UNWANTED LATERAL MOVEMENT (INCLUDING SLIDING)9.4.4 C HANDLE LOADING9.8.2 TENSILE SAFETY FACTOR
2018-12-22

MED

11 TEMPERATURE11.6.6 CLEANING AND DISINFECTION11.8 INTERRUPTION OF THE POWER SUPPLY13.1.2 POWER AVAILABILITY15.4.3 BATTERIES15.4.3 REVERSED BATTERY CONNECTION/OVERCHARGING15.5.2 TRANSFORMER DIELECTRIC VOLTAGE WITHSTAND4.11 POWER INPUT5.7 HUMIDITY CONDITIONING 5.9.2 DETERMINATION OF ACCESSIBLE PARTS7.1.2 LEGIBILITY OF MARKINGS7.1.3 DURABILITY OF MARKINGS8.4.3 VOLTAGE OR CHARGE LIMITATION8.4.4 VOLTAGE LIMITATION (PART 2)8.5.4 WORKING VOLTAGE8.7 LEAKAGE CURRENTS 8.7.3 E NON-FREQUENCY WEIGHTED LEAKAGE CURRENT 8.7.4.5 EARTH LEAKGE CURRENT 8.7.4.7 A PATIENT LEAKAGE CURRENT8.7.4.7 B PATIENT LEAKAGE CURRENT, MAINS ON F-TYPE APPLIED PART8.7.4.7 C PATIENT LEAKAGE CURRENT, MAINS ON INPUT/OUTPUT8.7.4.7 D PATIENT LEAKAGE CURRENT MAINS ON NON-PE ENCLOSURE 8.7.4.7 H TOTAL PATIENT LEAKAGE CURRENT8.7.4.8 PATIENT AUXILIARY CURRENT8.8.3 DIELECTRIC VOLTAGE WITHSTAND9.4.2 STABILITY AND TRANSPORTABILITY9.4.3.1 INSTABILITY FROM UNWANTED LATERAL MOVEMENT (INCLUDING SLIDING)9.4.4 C HANDLE LOADING9.8.2 TENSILE SAFETY FACTOR
2023-11-15

MED

11.6.6 CLEANING AND DISINFECTION11.8 INTTERUPTION OF THE POWER SUPPLY15.0 VOLTAGE LIMITATION - B)15.0 VOLTAGE LIMITATION - C)16.0 ENCLOSURE AND PROTECTIVE COVERS - E)17.0 SEPARATION - G)18.0 EARTHING AND POTENTIAL EQUALIZATION - F)19.0 LEAKAGE CURRENT19.4 PATIENT AUXILIARY CURRENT - J)19.4 ENCLOSURE LEAKAGE CURRENT - G)19.4 EARTH LEAKAGE CURRENT - F)19.4 PATIENT LEAKAGE CURRENT - H)20.3 WORKING VOLTAGE MEASUREMENTS 20.4 DIELECTRIC VOLTAGE WITHSTAND21.0 ENCLOSURE MECHANICAL STRENGTH - A) AND B)21.0 HANDLE LOADING -C)21.6 PORTABLE EQUIPMENT ROUGH HANDLING - DROP - A)24.0 STABILITY IN NORMAL USE28.3 SUSPENDED MASSES - SUSPENSION SYSTEM WITH SAFETY DEVICES28.4 SUSPENDED MASSES - SUSPENSION SYSTEMS OF METAL WITHOUT SAFETY DEVICES4.10 HUMIDITY PRECONDITIONING42.0 EXCESSIVE TEMPERATURES44.5 HUMIDITY52.0 ABNORMAL OPERATION AND FAULT CONDITIONS52.4.1 POWER DISSIPATION LIMIT52.5.5 IMPAIRMENT OF COOLING52.5.6 LOCKING OF MOVING PARTS52.5.9 FAILURE OF COMPONENTS55 ENCLOSURES AND COVERS6.1 MARKING DURABILITY7.1 POWER INPUT US DEV 55 MOLD STRESS RELIEF TESTUS DEV 55 MECHANICAL ABUSE - BALL DROP TEST
2018-12-22

MED

11.6.6 CLEANING AND DISINFECTION11.8 INTTERUPTION OF THE POWER SUPPLY15.0 VOLTAGE LIMITATION - B)15.0 VOLTAGE LIMITATION - C)16.0 ENCLOSURE AND PROTECTIVE COVERS - E)17.0 SEPARATION - G)18.0 EARTHING AND POTENTIAL EQUALIZATION - F)19.0 LEAKAGE CURRENT19.4 PATIENT AUXILIARY CURRENT - J)19.4 ENCLOSURE LEAKAGE CURRENT - G)19.4 EARTH LEAKAGE CURRENT - F)19.4 PATIENT LEAKAGE CURRENT - H)20.3 WORKING VOLTAGE MEASUREMENTS 20.4 DIELECTRIC VOLTAGE WITHSTAND21.0 ENCLOSURE MECHANICAL STRENGTH - A) AND B)21.0 HANDLE LOADING -C)21.6 PORTABLE EQUIPMENT ROUGH HANDLING - DROP - A)24.0 STABILITY IN NORMAL USE28.3 SUSPENDED MASSES - SUSPENSION SYSTEM WITH SAFETY DEVICES28.4 SUSPENDED MASSES - SUSPENSION SYSTEMS OF METAL WITHOUT SAFETY DEVICES4.10 HUMIDITY PRECONDITIONING42.0 EXCESSIVE TEMPERATURES44.5 HUMIDITY52.0 ABNORMAL OPERATION AND FAULT CONDITIONS52.4.1 POWER DISSIPATION LIMIT52.5.5 IMPAIRMENT OF COOLING52.5.6 LOCKING OF MOVING PARTS52.5.9 FAILURE OF COMPONENTS55 ENCLOSURES AND COVERS6.1 MARKING DURABILITY7.1 POWER INPUT US DEV 55 MOLD STRESS RELIEF TESTUS DEV 55 MECHANICAL ABUSE - BALL DROP TEST
2018-12-22

MED

11.6.6 CLEANING AND DISINFECTION11.8 INTTERUPTION OF THE POWER SUPPLY15.0 VOLTAGE LIMITATION - B)15.0 VOLTAGE LIMITATION - C)16.0 ENCLOSURE AND PROTECTIVE COVERS - E)17.0 SEPARATION - G)18.0 EARTHING AND POTENTIAL EQUALIZATION - F)19.0 LEAKAGE CURRENT19.4 PATIENT AUXILIARY CURRENT - J)19.4 ENCLOSURE LEAKAGE CURRENT - G)19.4 EARTH LEAKAGE CURRENT - F)19.4 PATIENT LEAKAGE CURRENT - H)20.3 WORKING VOLTAGE MEASUREMENTS 20.4 DIELECTRIC VOLTAGE WITHSTAND21.0 ENCLOSURE MECHANICAL STRENGTH - A) AND B)21.0 HANDLE LOADING -C)21.6 PORTABLE EQUIPMENT ROUGH HANDLING - DROP - A)24.0 STABILITY IN NORMAL USE28.3 SUSPENDED MASSES - SUSPENSION SYSTEM WITH SAFETY DEVICES28.4 SUSPENDED MASSES - SUSPENSION SYSTEMS OF METAL WITHOUT SAFETY DEVICES4.10 HUMIDITY PRECONDITIONING42.0 EXCESSIVE TEMPERATURES44.5 HUMIDITY52.0 ABNORMAL OPERATION AND FAULT CONDITIONS52.4.1 POWER DISSIPATION LIMIT52.5.5 IMPAIRMENT OF COOLING52.5.6 LOCKING OF MOVING PARTS52.5.9 FAILURE OF COMPONENTS55 ENCLOSURES AND COVERS6.1 MARKING DURABILITY7.1 POWER INPUT US DEV 55 MOLD STRESS RELIEF TESTUS DEV 55 MECHANICAL ABUSE - BALL DROP TEST
2018-12-22

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT AMPERE MEASUREMENT1.6.2 INPUT TEST: SINGLE-PHASE1.7.11 DURABILITY OF MARKING2.1.1.1, 2.8.2 ACCESS TO ENERGIZED PARTS2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE2.10.2 DETERMINATION OF WORKING VOLTAGE - HAZARDOUS VOLTAGE (CIRCUIT) MEASUREMENT2.10.2 DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING I2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST4.1 STABILITY4.2.1 - 4.2.4 STEADY FORCE TESTS4.2.10 LOADING4.2.10 WALL OR CEILING MOUNTED EQUIPMENT4.2.5, 4.2.1 IMPACT 4.2.6, 4.2.1 DROP 4.2.7, 4.2.1 STRESS RELIEF TEST4.3.2 KNOB PULL/HANDLE LOADING 4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT4.5.5, 4.5 Ball Pressure4.5.1, 1.4.12, 1.4.13 HEATING TEST5.1, ANNEX D IT TOUCH CURRENT TEST (SINGLE-PHASE)5.1, ANNEX D TOUCH CURRENT (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE5.3.1-5.3.9 ABNORMAL OPERATION TESTS5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOADANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2018-12-22

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT AMPERE MEASUREMENT1.6.2 INPUT TEST: SINGLE-PHASE1.6.2 INPUT1.7.11 DURABILITY OF MARKING2.1.1.1, 2.8.2 ACCESS TO ENERGIZED PARTS2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE 2.10.2 DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT2.10.2 DETERMINATION OF WORKING VOLTAGE - HAZARDOUS VOLTAGE (CIRCUIT) MEASUREMENT2.2 SELV RELIABILITY2.4 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING I2.9.1, 2.9.2, 5.2.2 HUMIDITY 4.1 STABILITY4.2.10 LOADING4.2.1-4.2.4 STEADY FORCE 4.2.5, 4.2.1 IMPACT 4.2.6, 4.2.1 DROP 4.2.7, 4.2.1 STRESS RELIEF4.3.2 KNOB PULL/HANDLE LOADING 4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT4.5 HEATING4.5.1, 1.4.12, 1.4.13 HEATING5.1, ANNEX D IT TOUCH CURRENT (SINGLE-PHASE)5.1, ANNEX D TOUCH CURRENT (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE5.3.1-5.3.9 ABNORMAL OPERATION5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTORANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2018-12-22

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT AMPERE MEASUREMENT TEST1.6.2 INPUT TEST: SINGLE-PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.1, 2.8.2 ACCESS TO ENERGIZED PARTS TEST2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.10.2 DETERMINATION OF WORKING VOLTAGE - HAZARDOUS VOLTAGE (CIRC2.10.2 DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE2.10.2 DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT2.10.2 DETERMINATION OF WORKING VOLTAGE - HAZARDOUS VOLTAGE (CIRCUIT) MEASUREMENT2.2 SELV CIRCUITS2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST4.1 STABILITY TESTS4.2.1 - 4.2.4 STEADY FORCE TESTS4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.2.5, 4.2.1 IMPACT TEST4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.3.2 KNOB PULL/HANDLE LOADING TEST4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST5.1, ANNEX D IT TOUCH CURRENT TEST (SINGLE-PHASE)5.1, ANNEX D TOUCH CURRENT TEST (POLYPHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1 - 5.3.9 ABNORMAL OPERATION5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTORANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2018-12-22

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE- CURRENT- AND VOLT-AMPERE MEASUREMENT1.6.2/B INPUT TEST: SINGLE-PHASE1.7.13 DURABILITY OF MARKING TEST 2.1.1.1/2.8.2 ACCESS TO ENERGIZED PARTS2.1.1.5 /2.1.2 /1.2.8.9 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE; HAZARDOUS VOLTAGE (CIRCUIT) MEASUREMENT2.10.2 DETERMINATION OF WORKING VOLTAGE; SECONDARY OUTPUT VOLTAGE2.10.2 DETERMINATION OF WORKING VOLTAGE; VOLTAGE MEASUREMENTS2.2.2/2.2.3/2.2.4 SELV RELIABILITY2.4.1/2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4/ 2.6.1 EARTHING TEST I2.9.1/2.9.2/5.2.2 HUMIDITY4.1 STABILITY4.2.10 LOADING4.2.1-4.2.4 STEADY FORCE/ENCLOSURE PUSH4.2.2/4.2.3/2.10.3 INTERNAL SPACINGS PUSH4.2.5 IMPACT4.2.6/4.2.1 DROP4.2.7/4.2.1 STRESS RELIEF 4.3.2 KNOB PULL/HANDLE LOADING4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT4.5.1/1.4.12/1.4.13 HEATING4.5.5, 4.5 Ball Pressure5.1/ANNEX D TOUCH CURRENT TEST: SINGLE-PHASE/POLYPHASE; TN/TT SYSTEM5.1/ANNEX D IT TOUCH CURRENT TEST (SINGLE-PHASE)5.2.2 ELECTRIC STRENGTH.5.3.1, 5.3.4, 5.3.6 COMPONENT FAILURE TEST5.3.1/5.3.4/5.3.6 COMPONENT FAILURE5.3.6 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD5.3.6 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTORANNEX B.7 LOCKED-ROTOR OVERLOAD FOR DC MOTORS IN SECONDARY CIRCUITS
2018-12-22