AUO Corporation
AUO Corporation
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2020-01-08 |
Further information
Stage | Country | Name |
---|---|---|
2 | Denmark |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
ITAV | IEC 62368-1:2018 | 4.4.3.2, ANNEX T.4 – STEADY FORCE TEST, 100 N4.4.3.2, ANNEX T.5 – STEADY FORCE TEST, 250 N4.4.3.2, ANNEX T.3 – STEADY FORCE TEST, 30 N4.4.3.3, ANNEX T.7 – DROP TEST4.4.3.4, ANNEX T.6, ANNEX Y.6.2 – IMPACT TEST4.4.3.5, ANNEX T.3 – STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER4.4.3.8, ANNEX T.8 – STRESS RELIEF TEST5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCESB.2.5 – INPUT TEST: SINGLE PHASEB.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONS | 2022-05-05 | |
ITAV | IEC 62368-1:2014 | T.2 , 5.4.2.6, 5.4.3.2, G.15.3.6 STEADY FORCE TEST, 10 N4.4.4.4, T.6 ENCLOSURE IMPACT TEST4.4.4.7, T.8 STRESS RELIEF TEST4.4.4.5, T.3 STEADY FORCE TESTS4.4.4.2, T.4 STEADY FORCE TEST, 250 N5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.4, 6.3.2, 9 MAXIMUM OPERATING TEMPERATURE FORMATERIALS, COMPONENTS AND SYSTEMSB.2.5 INPUT TESTB.3 SIMULATED ABNORMAL OPERATING CONDITIONSF.3.10 TEST FOR THE PERMANENCE OF MARKINGSQ.1 LIMITED POWER SOURCE | 2020-01-08 | |
OFF | IEC 60950-1:2005 | 1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPEREMEASUREMENT TEST.1.6.2 INPUT TEST: SINGLE - PHASE1.7.11 DURABILITY OF MARKING TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS4.1 STABILITY TESTS4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 IMPACT TEST4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 Stress Relief Test4.3.1 SHARP EDGE TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 ABNORMAL OPERATON TESTS5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST | 2020-01-08 | |
OFF | IEC 60950-1:2005/AMD1:2009 | 1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPEREMEASUREMENT TEST.1.6.2 INPUT TEST: SINGLE - PHASE1.7.11 DURABILITY OF MARKING TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS4.1 STABILITY TESTS4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 IMPACT TEST4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 Stress Relief Test4.3.1 SHARP EDGE TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 ABNORMAL OPERATON TESTS5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST | 2020-01-08 | |
OFF | IEC 60950-1:2005/AMD2:2013 | 1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPEREMEASUREMENT TEST.1.6.2 INPUT TEST: SINGLE - PHASE1.7.11 DURABILITY OF MARKING TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS4.1 STABILITY TESTS4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 IMPACT TEST4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 Stress Relief Test4.3.1 SHARP EDGE TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 ABNORMAL OPERATON TESTS5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST | 2020-01-08 |