APPOTRONICS CO., LTD

Address(es)
  • 20-22F, High-Tech Zone Union Tower, No. 63, Xuefu Road, Nanshan District, Shenzhen, Guangdong
    Shenzhen
    China

Website Not available
Status

MEMBER

Acceptance date 2017-07-04

Further information

Stage

Country

Name

1

Denmark

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, ANNEX T.4 – STEADY FORCE TEST, 100 N4.4.3.2, ANNEX T.5 – STEADY FORCE TEST, 250 N4.4.3.2, ANNEX T.3 – STEADY FORCE TEST, 30 N4.4.3.3, ANNEX T.7 – DROP TEST4.4.3.4, ANNEX T.6 – IMPACT TEST4.4.3.8, ANNEX T.8 – STRESS RELIEF TEST5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.4.6.2 – SEPARABLE THIN SHEET MATERIAL5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.5.2.2 – CAPACITOR DISCHARGE AFTERDISCONNECTION OF A CONNECTOR5.6.6.2 – RESISTANCE OF THE PROTECTIVEBONDING SYSTEM5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS5.7.6 – PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS8.6.2 – STATIC STABILITY8.7 – WALL, CEILING, OR OTHER STRUCTURE MOUNTING TESTSB.2.5 – INPUT TEST: SINGLE PHASEB.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATINGCONDITIONS B.4 – SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 – TRANSFORMER OVERLOADM.3.2 – PROTECTION CIRCUITS FOR BATTERIESQ.1 – LIMITED POWER SOURCEANNEX T.2, 5.4.2.6, 5.4.3.2, G.15.2.6 – STEADY FORCE TEST, 10 N
2021-10-20

ITAV

4.4.4.2,ANNEX T.3 STEADY FORCE TEST, 30N4.4.4.2,ANNEX T.4 STEADY FORCE TEST, 100N4.4.4.2,ANNEX T.5 STEADY FORCE TEST, 250N4.4.4.3,ANNEX T.7 DROP TEST4.4.4.4,ANNEX T.6 IMPACT4.4.4.5,ANNEX T.3 STEADY FORCE TEST FOR INTERNALENCLOSURE AND BARRIER4.4.4.7,ANNEX T.8 STRESS RELIEF TEST4.7 EQUIPMENT FOR DIRECT INSERTION INTOMAINS SOCKET-OUTLETS: MOMENT TEST5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGYSOURCES5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL5.4.9 ELECTRIC STRENGTH5.5.2.2 SAFEGUARDS AGAINST CAPACITORDISCHARGE AFTER DISCONNECTION OF ACONNECTOR5.6.6.2 A) RESISTANCE OF THE PROTECTIVE BONDINGSYSTEM: 25 A OR LESS5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCHCURRENT MEASUREMENT5.7.5 PROTECTIVE CONDUCTOR CURRENT6.2.2.2,6.2.2.3 POWER MEASUREMENTS8.7 – WALL OR CEILING MOUNTING TESTS8.6.2 – STATIC STABILITYANNEX B.2.5 INPUT TEST: SINGLE PHASEB.2.6, 5.4.1.4, 6.3, 9.2 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 SIMULATED ABNORMAL OPERATINGCONDITIONSANNEX B.4 SIMULATED SINGLE FAULT CONDITIONSANNEXF.3.10 TEST FOR THE PERMANENCE OF MARKINGSANNEXG.5.3.3 TRANSFORMER OVERLOAD TESTSM.3.2 PROTECTION CIRCUITS FOR BATTERIESANNEX T.2 STEADY FORCE TEST, 10NANNEX Q.1 LIMITED POWER SOURCE
2020-09-02

OFF

1.2.2.1GUIDE INFORMATION PAGE - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPEREMEASUREMENT TEST1.6.2INPUT TEST: SINGLE-PHASE1.7.11DURABILITY OF MARKING TEST2.1.1.7CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS2.4.1, 2.4.2LIMITED CURRENT CIRCUIT MEASUREMENTS2.5LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1PROTECTIVE BONDING TEST II2.10.2DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST2.10.5.9, 2.10.5.10, 2.10.5.6THIN SHEET MATERIAL TESTS2.10.5.6, 2.10.5.13TRANSFORMER AND WIRE INSULATION ELECTRIC STRENGTH TEST3.2.6, 4.2.1, 4.2.7STRAIN RELIEF TEST4.1 STABILITY TESTS4.2.1 - 4.2.4STEADY FORCE TESTS4.2.5, 4.2.1IMPACT TEST4.2.6, 4.2.1DROP TEST4.2.7, 4.2.1STRESS RELIEF TEST4.2.10LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.6DIRECT PLUG-IN EQUIPMENT-MOMENT TEST4.3.8BATTERY TEST4.5.1, 1.4.12, 1.4.13HEATING TEST5.1ANNEX D - TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3. COMPONENT FAILURE TEST5.3.3, 5.3.7b, ANNEX C.1TRANSFORMER ABNORMAL OPERATION TEST5.3.7POWER SUPPLY OUTPUT SHORT- CIRCUIT/OVERLOAD TEST5.3.7OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST5.3.6, 5.3.7, 5.3.9AUDIO AMPLIFIER COMPONENT FAULT AND OVERLOAD TESTS
2019-10-29

OFF

1.2.2.1GUIDE INFORMATION PAGE - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPEREMEASUREMENT TEST1.6.2INPUT TEST: SINGLE-PHASE1.7.11DURABILITY OF MARKING TEST2.1.1.7CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS2.4.1, 2.4.2LIMITED CURRENT CIRCUIT MEASUREMENTS2.5LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1PROTECTIVE BONDING TEST II2.10.2DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST2.10.5.9, 2.10.5.10, 2.10.5.6THIN SHEET MATERIAL TESTS2.10.5.6, 2.10.5.13TRANSFORMER AND WIRE INSULATION ELECTRIC STRENGTH TEST3.2.6, 4.2.1, 4.2.7STRAIN RELIEF TEST4.1 STABILITY TESTS4.2.1 - 4.2.4STEADY FORCE TESTS4.2.5, 4.2.1IMPACT TEST4.2.6, 4.2.1DROP TEST4.2.7, 4.2.1STRESS RELIEF TEST4.2.10LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.6DIRECT PLUG-IN EQUIPMENT-MOMENT TEST4.3.8BATTERY TEST4.5.1, 1.4.12, 1.4.13HEATING TEST5.1ANNEX D - TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3. COMPONENT FAILURE TEST5.3.3, 5.3.7b, ANNEX C.1TRANSFORMER ABNORMAL OPERATION TEST5.3.7POWER SUPPLY OUTPUT SHORT- CIRCUIT/OVERLOAD TEST5.3.7OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST5.3.6, 5.3.7, 5.3.9AUDIO AMPLIFIER COMPONENT FAULT AND OVERLOAD TESTS
2019-10-29

OFF

1.2.2.1GUIDE INFORMATION PAGE - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPEREMEASUREMENT TEST1.6.2INPUT TEST: SINGLE-PHASE1.7.11DURABILITY OF MARKING TEST2.1.1.7CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS2.4.1, 2.4.2LIMITED CURRENT CIRCUIT MEASUREMENTS2.5LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1PROTECTIVE BONDING TEST II2.10.2DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST2.10.5.9, 2.10.5.10, 2.10.5.6THIN SHEET MATERIAL TESTS2.10.5.6, 2.10.5.13TRANSFORMER AND WIRE INSULATION ELECTRIC STRENGTH TEST3.2.6, 4.2.1, 4.2.7STRAIN RELIEF TEST4.1 STABILITY TESTS4.2.1 - 4.2.4STEADY FORCE TESTS4.2.5, 4.2.1IMPACT TEST4.2.6, 4.2.1DROP TEST4.2.7, 4.2.1STRESS RELIEF TEST4.2.10LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.6DIRECT PLUG-IN EQUIPMENT-MOMENT TEST4.3.8BATTERY TEST4.5.1, 1.4.12, 1.4.13HEATING TEST5.1ANNEX D - TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3. COMPONENT FAILURE TEST5.3.3, 5.3.7b, ANNEX C.1TRANSFORMER ABNORMAL OPERATION TEST5.3.7POWER SUPPLY OUTPUT SHORT- CIRCUIT/OVERLOAD TEST5.3.7OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST5.3.6, 5.3.7, 5.3.9AUDIO AMPLIFIER COMPONENT FAULT AND OVERLOAD TESTS
2019-10-29