Appleton Grp / Fisher Rosemount Systems Inc. – Philippine Branch

Address(es)
  • 19th Floor Cyberscape Alpha Building, Sapphire and Garnet Roads,
    Ortigas Center, Philippines
    PH- 1605 Pasig City,,
    Philippines

Website Not available
Status

MEMBER

Acceptance date 2020-05-29

Further information

Stage

Country

Name

3

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.4.2, ANNEX T.3, T.4, T.5 STEADY FORCE TESTS4.4.4.7, ANNEX T8 THERMOPLASTIC MATERIAL TESTS (T.8 STRESS RELIEF TEST)5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.10.3 BALL PRESSURE TESTANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL5.4.8 HUMIDITY CONDITIONING5.4.9 ELECTRIC STRENGTH TEST5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6.2(a) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 POWER MEASUREMENTS6.2.3.1 ARCING PIS DETERMINATION6.2.3.2 RESISTIVE PIS DETERMINATION8.7 WALL OR CEILING MOUNTING TESTSANNEX B.2.5 INPUT TEST ANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4 SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 TRANSFORMER OVERLOADANNEX Q.1 LIMITED POWER SOURCEANNEX G.5.4.6 LOCKED-ROTOR OVERLOAD TEST FOR DC MOTORS ANNEX M.3.2 PROTECTION CIRCUITS FOR BATTERIES 4.4.3.4, ANNEX T.6 IMPACT TEST 4.4.3.3, 7.7 DROP TEST
2020-11-09

ITAV

4.4.4.2, ANNEX T.3, T.4, T.5 STEADY FORCE TESTS4.4.4.7, ANNEX T8 THERMOPLASTIC MATERIAL TESTS (T.8 STRESS RELIEF TEST)5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.10.3 BALL PRESSURE TESTANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL5.4.8 HUMIDITY CONDITIONING5.4.9 ELECTRIC STRENGTH TEST5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6.2(a) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 POWER MEASUREMENTS6.2.3.1 ARCING PIS DETERMINATION6.2.3.2 RESISTIVE PIS DETERMINATION8.7 WALL OR CEILING MOUNTING TESTSANNEX B.2.5 INPUT TEST ANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4 SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 TRANSFORMER OVERLOADANNEX Q.1 LIMITED POWER SOURCEANNEX G.5.4.6 LOCKED-ROTOR OVERLOAD TEST FOR DC MOTORS ANNEX M.3.2 PROTECTION CIRCUITS FOR BATTERIES 4.4.4.4, ANNEX T.6 IMPACT TEST 4.4.3.3, 7.7 DROP TEST
2020-11-09

OFF

1.6.21.7.112.1.1.1, 2.8.2 Part 21 4.22.1.1.5, 2.1.2, 2.8.102.1.1.72.2.2, 2.2.3, 2.2.4, Part 22 6.12.52.6.3.4, 2.6.12.9.1, 2.9.2, 5.2.22.10.5.6, 2.10.5.132.10.5.9, 2.10.5.10, 2.10.5.65.2.22.10.24.2.1 - 4.2.4 4.2.7, 4.2.14.3.84.2.104.5.1, 1.4.12, 1.4.13 4.5.5, 4.55.1, ANNEX D5.3.1, 5.3.4, 5.3.7 5.3.1-5.3.95.3.3, 5.3.7b, ANNEX C.15.3.7ANNEX B.74.2.5, 4.2.1, PART 22 10.2
2020-11-09

OFF

1.6.21.7.112.1.1.1, 2.8.2 Part 21 4.22.1.1.5, 2.1.2, 2.8.102.1.1.72.2.2, 2.2.3, 2.2.4, Part 22 6.12.52.6.3.4, 2.6.12.9.1, 2.9.2, 5.2.22.10.5.6, 2.10.5.132.10.5.9, 2.10.5.10, 2.10.5.65.2.22.10.24.2.1 - 4.2.4 4.2.7, 4.2.14.3.84.2.104.5.1, 1.4.12, 1.4.13 4.5.5, 4.55.1, ANNEX D5.3.1, 5.3.4, 5.3.7 5.3.1-5.3.95.3.3, 5.3.7b, ANNEX C.15.3.7ANNEX B.74.2.5, 4.2.1, PART 22 10.2
2020-11-09

OFF

1.6.2 INPUT TEST: SINGLE-PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.1, 2.8.2 Part 21 4.2 ACCESS TO ENERGIZED PARTS TEST 2.1.1.5, 2.1.2, 2.8.10 ENERGY HAZARD MEASUREMENTS 2.1.1.7 CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, Part 22 6.1 SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS 2.5 LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST 2.10.5.6, 2.10.5.13 TRANSFORMER AND WIRE INSULATION ELECTRIC STRENGTH TEST 2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL TESTS 5.2.2 ELECTRIC STRENGTH TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST4.2.1 - 4.2.4 STEADY FORCE TESTS4.2.7, 4.2.1 STRESS RELIEF TEST 4.3.8 BATTERY TESTS4.2.10 LOADING TESTS -WALL AND CEILING MOUNTED EQUIPMENT 4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1-5.3.9 ABNORMAL OPERATION TESTS5.3.3, 5.3.7b, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TESTANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST 4.2.6, 4.2.1 DROP TEST
2020-11-09