Apple Inc.

Address(es)
  • 20525 Mariani Avenue
    Cupertino 95014
    CA
    United States of America

Website Not available
Status

MEMBER

Acceptance date 2018-03-21

Further information

Stage

Country

Name

3

United States of America

3

United States of America

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

MISC

5.0 DETERMINATION OF THE ACCESSIBLE EMISSION LEVEL AND PRODUCT CLASSIFICATION5.1 TESTS5.2 MEASUREMENT OF LASER RADIATION5.4 MEASUREMENT GEOMETRY5.4.1 GENERAL5.4.2 DEFAULT (SIMPLIFIED) EVALUATION5.4.3 EVALUATION CONDITION FOR EXTENDED SOURCES
2018-03-29

MISC

9 DETERMINATION OF THE ACCESSIBLE EMISSION LEVEL9.1 TESTS9.2 MEASUREMENT OF LASER RADIATION9.3 MEASUREMENT GEOMETRY9.3.1 GENERAL9.3.2 DEFAULT (SIMPLIFIED) EVALUATION9.3.3 EVALUATION CONDITION FOR EXTENDED SOURCES5.0 DETERMINATION OF THE ACCESSIBLE EMISSION LEVEL AND PRODUCT CLASSIFICATION5.1 TESTS5.2 MEASUREMENT OF LASER RADIATION5.4 MEASUREMENT GEOMETRY5.4.1 GENERAL5.4.2 DEFAULT (SIMPLIFIED) EVALUATION5.4.3 EVALUATION CONDITION FOR EXTENDED SOURCES
2018-03-29

OFF

1.6.2 INPUT: SINGLE-PHASE1.7.11 DURABILITY2.1.1.7 CAPACITANCE DISCHARGE TEST2.10.2 DETERMINATION OF WORKING VOLTAGE; VOLTAGE MEASUREMENT2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4 PROTECTIVE BONDING4.1 STABILITY TESTS4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1 IMPACT4.2.7, 4.2.1 STRESS RELIEF TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.6.5 BARRIER ADHESIVE5.1 TOUCH CURRENT5.2.2 ELECTRIC STRENGTH TEST5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS
2018-03-29

OFF

1.6.2 INPUT: SINGLE-PHASE1.7.11 DURABILITY2.1.1.7 CAPACITANCE DISCHARGE TEST2.10.2 DETERMINATION OF WORKING VOLTAGE; VOLTAGE MEASUREMENT2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4 PROTECTIVE BONDING4.1 STABILITY TESTS4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1 IMPACT4.2.7, 4.2.1 STRESS RELIEF TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.6.5 BARRIER ADHESIVE5.1 TOUCH CURRENT5.2.2 ELECTRIC STRENGTH TEST5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS
2018-03-29

OFF

1.6.2 INPUT: SINGLE-PHASE1.7.11 DURABILITY2.1.1.7 CAPACITANCE DISCHARGE TEST2.10.2 DETERMINATION OF WORKING VOLTAGE; VOLTAGE MEASUREMENT2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4 PROTECTIVE BONDING4.1 STABILITY TESTS4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1 IMPACT4.2.7, 4.2.1 STRESS RELIEF TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.6.5 BARRIER ADHESIVE5.1 TOUCH CURRENT5.2.2 ELECTRIC STRENGTH TEST5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS
2018-03-29

TRON

10.3 HUMIDITY TREATMENT11 DIELECTRIC STRENGTH AFTER FAULT CONDITIONS12.1.2 BUMP TEST12.1.4 DIELECTRIC STRENGTH AFTER IMPACT TEST12.1.5 DIELECTRIC STRENGTH TEST AFTER DROP TEST12.1.6 STRESS RELIEF TEST13.3 CLEARANCES13.4 CREEPAGE DISTANCES14.8 SAFETY INTERLOCKS15.2 PROTECTIVE EARTH TERMINAL RESISTANCE TEST17.1 SCREW SECUREMENT TEST17.3 ELECTRICAL CONNECTIONS AND MECHANICAL FIXINGS - FIXING DEVICES17.7 ELECTRICAL CONNECTIONS AND MECHANICAL FIXINGS, TOUCH CURRENT AFTER ENCLOSURE RESISTANCE TO EXTERNAL FORCES TEST AND COVER FIXING TESTS17.9 ELECTRICAL CONNECTIONS AND MECHANICAL FIXINGS - INTERNAL CONNECTIONS19.2 STABILITY & MECHANICAL HAZARDS- 10° TO THE HORIZONTAL,19.3 STABILITY & MECHANICAL HAZARDS- VERTICAL FORCE 19.4 HORIZONTAL FORCE TEST19.5 STABILITY & MECHANICAL HAZARDS-TEST OF EDGES AND CORNERS20 PWB VOLTAGE AND POWER MEASUREMENT TEST4.2.5 (A) NORMAL OPERATING CONDITIONS -AUDIO AMPLIFIER4.3.10 FAULT CONDITIONS: OUTPUT TERMINAL OVERLOAD4.3.11 FAULT OCNDITIONS: VENTILATION OPENINGS BLOCKED4.3.12 FAULT CONDITIONS, REVERSED POLARITY TEST ON BATTERIES4.3.14 FAULT CONDITIONS, VOLTAGE MISMATCH4.3.15 FAULT CONDITIONS, SPECIAL SUPPLY APPARATUS WITH OUTPUT VOLTAGE SETTING DEVICE4.3.16 FAULT CONDITIONS:APPARATUS SUPPLIED BY SUPPLY APPARATUS FOR GENERAL USE4.3.6 FAULT CONDITIONS, MAXIMUM POWER FOR AUDIO AMPLIFIER5 MARKING DURABILITY AND LEGIBILITY5.2 IDENTIFICATION AND SUPPLY RATINGS5.3 TERMINALS7.1 HEATING UNDER NORMAL OPERATING CONDITIONS8.13 COVERS, EXTERNAL FORCE TEST8.14 CONSTRUCTIONAL REQUIREMENTS WITH REGARD TO THE PROTECTION AGAINST ELECTRIC SHOCK - WIRING INSULATION8.21 CONSTRUCTIONAL REQUIREMENTS WITH REGARD TO THE PROTECTION AGAINST ELECTRIC SHOCK - THIN SHEET MATERIAL8.3 HUMIDITY TREATEMENT OF HYGROSCOPIC INSULATING MATERIALS8.8 WINDING INSULATION TEST9.1.1.1 ELECTRIC SHOCK HAZARD UNDER NORMAL OPERATING CONDITIONS9.1.1.2 ELECTRIC SHOCK HAZARD UNDER NORMAL OPERATING CONDITIONS - HAZARDOUS LIVE9.1.3 OPENINGS OF THE ENCLOSURE9.1.6 WITHDRAWAL OF MAINS PLUG9.1.7 ENCLOSURE RESISTANCE TO EXTERNAL FORCES TEST9.2 REMOVAL OF PROTECTIVE COVERSTABLE 21 DISTANCES FROM POTENTIAL IGNITION SOURCES & CONSEQUENTIAL FLAMMABILITY CATEGORIES
2018-03-29