ACRELEC MANUFACTURING SAS

Address(es)
  • 77 RUE PASTEUR
    FR-77400 SAINT THIBAULT DES VIGNES
    France

Website Not available
Status

MEMBER

Acceptance date 2017-03-09

Further information

Stage

Country

Name

2

Denmark

1

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.4.2, T.5 – STEADY FORCE TEST, 250 N4.4.4.4, T.6 – IMPACT TESTANNEX T.9 – GLASS IMPACT TEST5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.3.2.2 - ACCESSIBILITY TO ELECTRICAL ENERGY SOURCES AND SAFEGUARDS5.4.1.4, Annex B.2 – MAXIMUM OPERATINGTEMPERATURE FOR MATERIALS, COMPONENTSAND SYSTEMS6.3 – NORMAL OPERATING CONDITIONSTEMPERATURE TEST9.2.5 – TOUCH TEMPERATURE TEST5.4.2.4 – MINIMUM CLEARANCE BASED UPONELECTRIC STRENGTH TEST5.4.9 – ELECTRIC STRENGTH TEST5.5.2.2 – SAFEGUARDS AGAINST CAPACITORDISCHARGE AFTER DISCONNECTION OF ACAPACITOR5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDINGSYSTEM5.7 – PROSPECTIVE TOUCH VOLTAGE AND TOUCHCURRENT MEASUREMENT5.7.5 – PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS6.2.3.1 – ARCING PIS DETERMINATION6.2.3.2 – RESISTIVE PIS DETERMINATIONB.2.6, 5.4.1.4, 6.3, 9.2 – NORMAL OPERATINGCONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATINGCONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONS6.4.2, ANNEX B.4 – SINGLE FAULT CONDITIONS:REDUCE THE LIKELIHOOD OF IGNITIONANNEX G.5.4.6 – LOCKED-ROTOR OVERLOAD TESTFOR D.C. MOTORSANNEX F.3.10 – TEST FOR THE PERMANENCE OFMARKINGSANNEX Q.1 – LIMITED POWER SOURCEANNEX G.5.4.6 – LOCKED-ROTOR OVERLOAD TESTFOR D.C. MOTORSANNEX G.7.3.2 – STRAIN RELIEF TESTY.5.3 – WATER SPRAY TEST
2022-06-22

ITAV

4.4.4.2, T.5 – STEADY FORCE TEST, 250 N4.4.4.4, T.6 – IMPACT TEST4.4.4.6, ANNEX T.9 – GLASS IMPACT TEST5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICALENERGY SOURCES5.3.2.2 - ACCESSIBILITY TO ELECTRICAL ENERGYSOURCES AND SAFEGUARDS5.4.1.4, Annex B.2 – MAXIMUM OPERATINGTEMPERATURE FOR MATERIALS, COMPONENTSAND SYSTEMS6.3 – NORMAL OPERATING CONDITIONSTEMPERATURE TEST9.2.5 – TOUCH TEMPERATURE TEST5.4.2.4 – MINIMUM CLEARANCE BASED UPONELECTRIC STRENGTH TEST5.4.9 – ELECTRIC STRENGTH TEST5.5.2.2 – SAFEGUARDS AGAINST CAPACITORDISCHARGE AFTER DISCONNECTION OF ACAPACITOR5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDINGSYSTEM5.7 – PROSPECTIVE TOUCH VOLTAGE AND TOUCHCURRENT MEASUREMENT5.7.5 – PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS6.2.3.1 – ARCING PIS DETERMINATION6.2.3.2 – RESISTIVE PIS DETERMINATIONB.2.6, 5.4.1.4, 6.3, 9.2 – NORMAL OPERATINGCONDITIONS TEMPERATURE MEASUREMENT8.6.2 – STATIC STABILITY8.6.3 – RELOCATION STABILITY TESTB.2.5 – INPUT TEST: SINGLE PHASEB.2.6 – NORMAL OPERATING CONDITIONSTEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATINGCONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONS6.4.2, ANNEX B.4 – SINGLE FAULT CONDITIONS:REDUCE THE LIKELIHOOD OF IGNITIONANNEX G.5.4.6 – LOCKED-ROTOR OVERLOAD TESTFOR D.C. MOTORSANNEX F.3.10 – TEST FOR THE PERMANENCE OFMARKINGSANNEX Q.1 – LIMITED POWER SOURCEANNEX G.5.4.6 – LOCKED-ROTOR OVERLOAD TESTFOR D.C. MOTORSANNEX G.7.3.2 – STRAIN RELIEF TEST
2019-09-19

OFF

1.6.2 INPUT TEST: SINGLE‐PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.7 CAPACITANCE DISCHARGE TEST2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I4.2.1‐4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, Part 22.10.2 IMPACT TEST4.5.1‐1.4.12 1.4.13 HEATING TEST5.1 ANNEX D ‐ TOUCH CURRENT TEST (SINGLE‐PHASE;TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1‐5.3.9 ABNORMAL OPERATION TESTSWATER SPRAY TEST FOR ENCLOSURE DESIGNATION IPX4WATER SPRAY TEST FOR ENCLOSURE DESIGNATION IPX5
2019-09-19

OFF

1.6.2 INPUT TEST: SINGLE‐PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.7 CAPACITANCE DISCHARGE TEST2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I4.2.1‐4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, Part 22.10.2 IMPACT TEST4.5.1‐1.4.12 1.4.13 HEATING TEST5.1 ANNEX D ‐ TOUCH CURRENT TEST (SINGLE‐PHASE;TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1‐5.3.9 ABNORMAL OPERATION TESTSWATER SPRAY TEST FOR ENCLOSURE DESIGNATION IPX4WATER SPRAY TEST FOR ENCLOSURE DESIGNATION IPX5
2019-09-19

OFF

1.6.2 INPUT TEST: SINGLE‐PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.7 CAPACITANCE DISCHARGE TEST2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I4.2.1‐4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, Part 22.10.2 IMPACT TEST4.5.1‐1.4.12 1.4.13 HEATING TEST5.1 ANNEX D ‐ TOUCH CURRENT TEST (SINGLE‐PHASE;TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1‐5.3.9 ABNORMAL OPERATION TESTSWATER SPRAY TEST FOR ENCLOSURE DESIGNATION IPX4WATER SPRAY TEST FOR ENCLOSURE DESIGNATION IPX5
2019-09-19