ACRELEC MANUFACTURING SAS

Address(es)
  • 77 RUE PASTEUR
    FR-77400 SAINT THIBAULT DES VIGNES
    France

Website Not available
Status

MEMBER

Acceptance date 2017-03-09

Further information

Stage

Country

Name

2

Denmark

1

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.4.2, T.5 – STEADY FORCE TEST, 250 N 14.4.4.4, T.6 – IMPACT TEST 14.4.4.6, ANNEX T.9 – GLASS IMPACT TEST15.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES 15.3.2.2 - ACCESSIBILITY TO ELECTRICAL ENERGY SOURCES AND SAFEGUARDS 15.4.1.4, Annex B.2 – MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS 6.3 – NORMAL OPERATING CONDITIONS TEMPERATURE TEST19.2.5 – TOUCH TEMPERATURE TEST 1 5.4.2.4 – MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST 15.4.9 – ELECTRIC STRENGTH TEST 15.5.2.2 – SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR 15.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM 15.7 – PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT 15.7.5 – PROTECTIVE CONDUCTOR CURRENT 16.2.2.2, 6.2.2.3 – POWER MEASUREMENTS 16.2.3.1 – ARCING PIS DETERMINATION 16.2.3.2 – RESISTIVE PIS DETERMINATION 1B.2.6, 5.4.1.4, 6.3, 9.2 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT 18.6.2 – STATIC STABILITY 18.6.3 – RELOCATION STABILITY TEST 1B.2.5 – INPUT TEST: SINGLE PHASE 1B.2.6 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT 1B.3 – SIMULATED ABNORMAL OPERATING CONDITIONS 1B.4 – SIMULATED SINGLE FAULT CONDITIONS 16.4.2, ANNEX B.4 – SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITION 1ANNEX G.5.4.6 – LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORS 1ANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGS 1ANNEX Q.1 – LIMITED POWER SOURCE 1ANNEX G.5.4.6 – LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORS 281 1ANNEX G.7.3.2 – STRAIN RELIEF TEST 1Y.5.3 – WATER SPRAY TEST 1
2022-06-22

ITAV

4.4.4.2, T.5 – STEADY FORCE TEST, 250 N4.4.4.4, T.6 – IMPACT TEST4.4.4.6, ANNEX T.9 – GLASS IMPACT TEST5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.3.2.2 - ACCESSIBILITY TO ELECTRICAL ENERGY SOURCES AND SAFEGUARDS5.4.1.4, Annex B.2 – MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS 6.3 – NORMAL OPERATING CONDITIONS TEMPERATURE TEST9.2.5 – TOUCH TEMPERATURE TEST 5.4.2.4 – MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST5.4.9 – ELECTRIC STRENGTH TEST5.5.2.2 – SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 – PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 – PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS6.2.3.1 – ARCING PIS DETERMINATION6.2.3.2 – RESISTIVE PIS DETERMINATIONB.2.6, 5.4.1.4, 6.3, 9.2 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT8.6.2 – STATIC STABILITY8.6.3 – RELOCATION STABILITY TESTB.2.5 – INPUT TEST: SINGLE PHASEB.2.6 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONS6.4.2, ANNEX B.4 – SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITIONANNEX G.5.4.6 – LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSANNEX Q.1 – LIMITED POWER SOURCEANNEX G.5.4.6 – LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORS 281ANNEX G.7.3.2 – STRAIN RELIEF TEST
2019-09-19

OFF

1.6.2 INPUT TEST: SINGLE-PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.7 CAPACITANCE DISCHARGE TEST2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, Part 22.10.2 IMPACT TEST 4.5.1-1.4.12 1.4.13 HEATING TEST5.1 ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1-5.3.9 ABNORMAL OPERATION TESTSWATER SPRAY TEST FOR ENCLOSURE DESIGNATION IPX4WATER SPRAY TEST FOR ENCLOSURE DESIGNATION IPX5
2019-09-19

OFF

1.6.2 INPUT TEST: SINGLE-PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.7 CAPACITANCE DISCHARGE TEST2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, Part 22.10.2 IMPACT TEST 4.5.1-1.4.12 1.4.13 HEATING TEST5.1 ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1-5.3.9 ABNORMAL OPERATION TESTSWATER SPRAY TEST FOR ENCLOSURE DESIGNATION IPX4WATER SPRAY TEST FOR ENCLOSURE DESIGNATION IPX5
2019-09-19

OFF

1.6.2 INPUT TEST: SINGLE-PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.7 CAPACITANCE DISCHARGE TEST2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, Part 22.10.2 IMPACT TEST 4.5.1-1.4.12 1.4.13 HEATING TEST5.1 ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1-5.3.9 ABNORMAL OPERATION TESTSWATER SPRAY TEST FOR ENCLOSURE DESIGNATION IPX4WATER SPRAY TEST FOR ENCLOSURE DESIGNATION IPX5
2019-09-19