ACCTON TECHNOLOGY CORP

Address(es)
  • 1 CREATION 3RD RD SCIENCE-BASED INDUSTRIAL PARK
    TW-300 HSINCHU
    TAIWAN
    Chinese Taipei

Website Not available
Status

MEMBER

Acceptance date 2011-02-08

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, ANNEX T.4 - STEADY FORCE TEST, 100 N4.4.3.2, ANNEX T.5 - STEADY FORCE TEST, 250 N4.4.3.2, ANNEX T.3 - STEADY FORCE TEST, 30 N4.4.3.3, ANNEX T.7 - DROP TEST4.4.3.4, ANNEX T.6 - IMPACT TEST4.4.3.5, ANNEX T.3 - STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER4.4.3.8, ANNEX T.8 - STRESS RELIEF TEST5.2, 5.7 - CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.4, Annex B.2 - MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.8 - DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 – BALL PRESSURE TEST5.4.4.6.2 - SEPARABLE THIN SHEET MATERIAL5.4.8 - HUMIDITY CONDITIONING5.4.9 - ELECTRIC STRENGTH TEST5.4.10, 5.4.10.2.2 - SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: IMPULSE TEST 5.4.10, 5.4.10.2.3 - SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: STEADY STATE TEST5.5.2.2 - SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.5.8 – INSULATION BETWEEN THE MAINS AND AN EXTERNAL CIRCUIT CONSISTING OF A COAXIAL CABLE5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7, 5.7.4, 5.7.5 – PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.6 – PROTECTIVE CONDUCTOR CURRENT5.7.7 – SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS6.2.2.2, 6.2.2.3 - POWER MEASUREMENTS6.2.3.1 - ARCING PIS DETERMINATION6.2.3.2 - RESISTIVE PIS DETERMINATION6.3 - NORMAL OPERATING CONDITIONS TEMPERATURE TEST6.4.3, ANNEX B.4 - REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS6.4.3.3 - REDUCTION OF THE LIKELIHOOD OF IGNITION - TEMPERATURES LIMITED BY FUSES6.6 - TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION8.6.2 - STATIC STABILITY8.6.3 - RELOCATION STABILITY TEST8.7 - WALL OR CEILING MOUNTING TESTS8.11.3.1 – RACK MOUNTED EQUIPMENT – MOUNTING MEANS: DOWNWARD FORCE TEST8.11.3.2, 8.11.3.3 – RACK MOUNTED EQUIPMENT – MOUNTING MEANS: LATERAL PUSH FORCE AND END STOPS TESTS8.11.3.3 – INTEGRITY OF SLIDE-RAIL END STOPSB.2.5 - INPUT TEST: SINGLE PHASEB.2.6 - NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 - SIMULATED ABNORMAL OPERATING CONDITIONSB.4 - SIMULATED SINGLE FAULT CONDITIONS6.4.2, ANNEX B.4 - SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITIONANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSG.5.4.6 - LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSG.5.4.6.3 - ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSANNEX H.2, 5.2.2.6 - CRITERIA FOR TELEPHONE RINGING SIGNALS – METHOD AANNEX H.3, 5.2.2.6 - CRITERIA FOR TELEPHONE RINGING SIGNALS – METHOD BANNEX M.3.2 – PROTECTION CIRCUITS FOR BATTERIESANNEX M.4.2 – SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDSANNEX P.4.2 – METALLIZED COATINGS AND ADHESIVES SECURING PARTSANNEX Q.1 - LIMITED POWER SOURCEANNEX T.2 , 5.4.2.6, 5.4.3.2, G.15.3.6 – STEADY FORCE TEST, 10 N
2019-03-28

ITAV

4.4.4.2, ANNEX T.4 - STEADY FORCE TEST, 100 N4.4.4.2, ANNEX T.5 - STEADY FORCE TEST, 250 N4.4.4.2, ANNEX T.3 - STEADY FORCE TEST, 30 N4.4.4.3, ANNEX T.7 - DROP TEST4.4.4.4, ANNEX T.6 - IMPACT TEST4.4.4.5, ANNEX T.3 - STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER4.4.4.7, ANNEX T.8 - STRESS RELIEF TEST5.2, 5.7 - CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.4, Annex B.2 - MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.8 - DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 – BALL PRESSURE TEST5.4.4.6.2 - SEPARABLE THIN SHEET MATERIAL5.4.8 - HUMIDITY CONDITIONING5.4.9 - ELECTRIC STRENGTH TEST5.4.10, 5.4.10.2.2 - SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: IMPULSE TEST 5.4.10, 5.4.10.2.3 - SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: STEADY STATE TEST5.5.2.2 - SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.5.8 – INSULATION BETWEEN THE MAINS AND AN EXTERNAL CIRCUIT CONSISTING OF A COAXIAL CABLE5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 – PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 – PROTECTIVE CONDUCTOR CURRENT5.7.7 – SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS6.2.2.2, 6.2.2.3 - POWER MEASUREMENTS6.2.3.1 - ARCING PIS DETERMINATION6.2.3.2 - RESISTIVE PIS DETERMINATION6.3 - NORMAL OPERATING CONDITIONS TEMPERATURE TEST6.4.3, ANNEX B.4 - REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS6.4.3.3 - REDUCTION OF THE LIKELIHOOD OF IGNITION - TEMPERATURES LIMITED BY FUSES6.6 - TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION8.6.2 - STATIC STABILITY8.6.3 - RELOCATION STABILITY TEST8.7 - WALL OR CEILING MOUNTING TESTS8.11.3 - RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST8.11.4 - RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST, 250 N, INCLUDING END STOPSB.2.5 - INPUT TEST: SINGLE PHASEB.2.6 - NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 - SIMULATED ABNORMAL OPERATING CONDITIONSB.4 - SIMULATED SINGLE FAULT CONDITIONS6.4.2, ANNEX B.4 - SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITIONANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSG.5.4.6 - LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSG.5.4.6.3 - ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSANNEX H.2, 5.2.2.6 - CRITERIA FOR TELEPHONE RINGING SIGNALS – METHOD AANNEX H.3, 5.2.2.6 - CRITERIA FOR TELEPHONE RINGING SIGNALS – METHOD BANNEX M.3.2 – PROTECTION CIRCUITS FOR BATTERIESANNEX M.4.2 – SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDSANNEX P.4.2 – METALLIZED COATINGS AND ADHESIVES SECURING PARTSANNEX Q.1 - LIMITED POWER SOURCEANNEX T.2 , 5.4.2.6, 5.4.3.2, G.15.3.6 – STEADY FORCE TEST, 10 N
2019-03-28

ITAV

5.3.2 DC power transfer interconnection to other equipment5.4.1 Requirement for the PSE5.4.2 Requirement for the PD
2021-01-07

OFF

1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST.1.6.2 - INPUT TEST: SINGLE - PHASE1.6.2 - INPUT TEST: POLY - PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.1.1.7 - CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 - SELV RELIABILITY TEST2.3.1 - TNV‐1, TNV‐2, TNV‐3 LIMITS (NORMAL)2.3.1, 2.3.4 - TNV‐1, TNV‐2, TNV‐3 LIMITS (SINGLE FAULT)2.3.1, ANNEX M.2 - Criteria For Telephone Ringing And Other Signals Test(Method A Europe)2.3.1b, ANNEX M.3.1 ‐ M.3.2.3 - Criteria For Telephone Ringing Test (Method B NorthAmerica)2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST2.10.2 - DETERMINATION OF WORKING VOLTAGE – WORKING VOLTAGE MEASUREMENT TEST2.10.2, Part 22, 6.1 - Determination of Working Voltage; Hazardous Voltage(Circuit) Measurement2.10.2 - DETERMINATION OF WORKING VOLTAGE – SECONDARY OUTPUT VOLTAGE TEST2.10.5.9, 2.10.5.10, 2.10.5.6 - THIN SHEET MATERIAL TESTS2.10.5.13 - TRANSFORMER AND WIRE/INSULATION ELECTRIC STRENGTH4.1 - STABILITY TESTS4.2.1-4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 - IMPACT TEST4.2.6, 4.2.1 - DROP TEST4.2.7, 4.2.1 - Stress Relief Test4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.2 - KNOB PULL/HANDLE LOADING TEST4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST4.3.6 - DIRECT PLUG IN EQUIPMENT – MOMENT TEST4.3.6 - Direct Plug‐In Blade Securement Test4.3.6 - Direct Plug‐In Security of Input Contacts4.3.6 - Direct Plug‐In Resistance To Crushing4.3.6 - Direct Plug‐In Rod Pressure Test4.3.8 - BATTERY TESTS4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.4.2, .4.4 - HAZARDOUS MOVING PARTS TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST4.5.5, 4.5 - BALL PRESSURE TEST5.1, ANNEX D - TOUCH CURRENT TEST(SINGLE – PHASE; TN/TT SYSTEM)5.1, ANNEX D - TOUCH CURRENT TEST(Poly – PHASE; TN/TT SYSTEM)5.1, ANNEX D - IT TOUCH CURRENT TEST(SINGLE – PHASE)5.1.8.1 - Limitation Of The Touch Current To A TelecommunicationsNetwork And A Cable Distribution System (Single‐Phase)5.1.8.3 - Limitation Of Touch Current Due To Ringing Signals5.2.2 - ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.1 - ABNORMAL OPERATON TESTS5.3.3, 5.3.7B, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST5.3.7 - Power Supply Output Short‐Circuit/Overload Test5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST6.1.2 - Requirements For Separation Between TelecommunicationNetwork From Earth6.2.2 (6.2.2.1) - Electric Strength Test Procedure - Impulse Test6.2.2 (6.2.2.2) - Electric Strength Test Procedure ‐ Steady‐State Test7.3, 6.2.2, 6.2.2.1 - Cable Distribution System, Electric Strength Procedure, Impulse7.3, 6.2.2, 6.2.2.2 - Cable Distribution System, Electric Strength Procedure, Steady-State7.4.2 - Cable Distribution System, Voltage Surge7.4.3 - Cable Distribution System, ImpulseANNEX B.7 - LOCKED –ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARYAnnex CC - Evaluation of Integrated Circuit (IC) Current LimitersAnnex DD - Rack Mounted Equipment ‐ Mechanical Strength
2019-03-08

OFF

1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST.1.6.2 - INPUT TEST: SINGLE - PHASE1.6.2 - INPUT TEST: POLY - PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.1.1.7 - CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 - SELV RELIABILITY TEST2.3.1 - TNV‐1, TNV‐2, TNV‐3 LIMITS (NORMAL)2.3.1, 2.3.4 - TNV‐1, TNV‐2, TNV‐3 LIMITS (SINGLE FAULT)2.3.1, ANNEX M.2 - Criteria For Telephone Ringing And Other Signals Test(Method A Europe)2.3.1b, ANNEX M.3.1 ‐ M.3.2.3 - Criteria For Telephone Ringing Test (Method B NorthAmerica)2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST2.10.2 - DETERMINATION OF WORKING VOLTAGE – WORKING VOLTAGE MEASUREMENT TEST2.10.2, Part 22, 6.1 - Determination of Working Voltage; Hazardous Voltage(Circuit) Measurement2.10.2 - DETERMINATION OF WORKING VOLTAGE – SECONDARY OUTPUT VOLTAGE TEST2.10.5.9, 2.10.5.10, 2.10.5.6 - THIN SHEET MATERIAL TESTS2.10.5.13 - TRANSFORMER AND WIRE/INSULATION ELECTRIC STRENGTH4.1 - STABILITY TESTS4.2.1-4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 - IMPACT TEST4.2.6, 4.2.1 - DROP TEST4.2.7, 4.2.1 - Stress Relief Test4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.2 - KNOB PULL/HANDLE LOADING TEST4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST4.3.6 - DIRECT PLUG IN EQUIPMENT – MOMENT TEST4.3.6 - Direct Plug‐In Blade Securement Test4.3.6 - Direct Plug‐In Security of Input Contacts4.3.6 - Direct Plug‐In Resistance To Crushing4.3.6 - Direct Plug‐In Rod Pressure Test4.3.8 - BATTERY TESTS4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.4.2, .4.4 - HAZARDOUS MOVING PARTS TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST4.5.5, 4.5 - BALL PRESSURE TEST5.1, ANNEX D - TOUCH CURRENT TEST(SINGLE – PHASE; TN/TT SYSTEM)5.1, ANNEX D - TOUCH CURRENT TEST(Poly – PHASE; TN/TT SYSTEM)5.1, ANNEX D - IT TOUCH CURRENT TEST(SINGLE – PHASE)5.1.8.1 - Limitation Of The Touch Current To A TelecommunicationsNetwork And A Cable Distribution System (Single‐Phase)5.1.8.3 - Limitation Of Touch Current Due To Ringing Signals5.2.2 - ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.1 - ABNORMAL OPERATON TESTS5.3.3, 5.3.7B, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST5.3.7 - Power Supply Output Short‐Circuit/Overload Test5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST6.1.2 - Requirements For Separation Between TelecommunicationNetwork From Earth6.2.2 (6.2.2.1) - Electric Strength Test Procedure - Impulse Test6.2.2 (6.2.2.2) - Electric Strength Test Procedure ‐ Steady‐State Test7.3, 6.2.2, 6.2.2.1 - Cable Distribution System, Electric Strength Procedure, Impulse7.3, 6.2.2, 6.2.2.2 - Cable Distribution System, Electric Strength Procedure, Steady-State7.4.2 - Cable Distribution System, Voltage Surge7.4.3 - Cable Distribution System, ImpulseANNEX B.7 - LOCKED –ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARYAnnex CC - Evaluation of Integrated Circuit (IC) Current LimitersAnnex DD - Rack Mounted Equipment ‐ Mechanical Strength
2019-03-08

OFF

1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST.1.6.2 - INPUT TEST: SINGLE - PHASE1.6.2 - INPUT TEST: POLY - PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.1.1.7 - CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 - SELV RELIABILITY TEST2.3.1 - TNV‐1, TNV‐2, TNV‐3 LIMITS (NORMAL)2.3.1, 2.3.4 - TNV‐1, TNV‐2, TNV‐3 LIMITS (SINGLE FAULT)2.3.1, ANNEX M.2 - Criteria For Telephone Ringing And Other Signals Test(Method A Europe)2.3.1b, ANNEX M.3.1 ‐ M.3.2.3 - Criteria For Telephone Ringing Test (Method B NorthAmerica)2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST2.10.2 - DETERMINATION OF WORKING VOLTAGE – WORKING VOLTAGE MEASUREMENT TEST2.10.2, Part 22, 6.1 - Determination of Working Voltage; Hazardous Voltage(Circuit) Measurement2.10.2 - DETERMINATION OF WORKING VOLTAGE – SECONDARY OUTPUT VOLTAGE TEST2.10.5.9, 2.10.5.10, 2.10.5.6 - THIN SHEET MATERIAL TESTS2.10.5.13 - TRANSFORMER AND WIRE/INSULATION ELECTRIC STRENGTH4.1 - STABILITY TESTS4.2.1-4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 - IMPACT TEST4.2.6, 4.2.1 - DROP TEST4.2.7, 4.2.1 - Stress Relief Test4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.2 - KNOB PULL/HANDLE LOADING TEST4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST4.3.6 - DIRECT PLUG IN EQUIPMENT – MOMENT TEST4.3.6 - Direct Plug‐In Blade Securement Test4.3.6 - Direct Plug‐In Security of Input Contacts4.3.6 - Direct Plug‐In Resistance To Crushing4.3.6 - Direct Plug‐In Rod Pressure Test4.3.8 - BATTERY TESTS4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.4.2, .4.4 - HAZARDOUS MOVING PARTS TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST4.5.5, 4.5 - BALL PRESSURE TEST5.1, ANNEX D - TOUCH CURRENT TEST(SINGLE – PHASE; TN/TT SYSTEM)5.1, ANNEX D - TOUCH CURRENT TEST(Poly – PHASE; TN/TT SYSTEM)5.1, ANNEX D - IT TOUCH CURRENT TEST(SINGLE – PHASE)5.1.8.1 - Limitation Of The Touch Current To A TelecommunicationsNetwork And A Cable Distribution System (Single‐Phase)5.1.8.3 - Limitation Of Touch Current Due To Ringing Signals5.2.2 - ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.1 - ABNORMAL OPERATON TESTS5.3.3, 5.3.7B, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST5.3.7 - Power Supply Output Short‐Circuit/Overload Test5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST6.1.2 - Requirements For Separation Between TelecommunicationNetwork From Earth6.2.2 (6.2.2.1) - Electric Strength Test Procedure - Impulse Test6.2.2 (6.2.2.2) - Electric Strength Test Procedure ‐ Steady‐State Test7.3, 6.2.2, 6.2.2.1 - Cable Distribution System, Electric Strength Procedure, Impulse7.3, 6.2.2, 6.2.2.2 - Cable Distribution System, Electric Strength Procedure, Steady-State7.4.2 - Cable Distribution System, Voltage Surge7.4.3 - Cable Distribution System, ImpulseANNEX B.7 - LOCKED –ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARYAnnex CC - Evaluation of Integrated Circuit (IC) Current LimitersAnnex DD - Rack Mounted Equipment ‐ Mechanical Strength
2019-03-08