AcBel Polytech Inc.

Address(es)
  • No. 18, Sec. 2, Zhongyang S. Rd., Beitou Dist.,
    Taipei
    Chinese Taipei

Website Not available
Status

MEMBER

Acceptance date 2021-11-25

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKETOUTLETS: MOMENT TEST5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.2.1.1 ACCESSIBLE ES1 CIRCUITS SEPARATED FROM OTHER ES CIRCUITS USING COMPONENTS5.4.1.4, Annex B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 BALL PRESSURE TEST5.4.2.4 MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL5.4.8 HUMIDITY CONDITIONING5.4.9 ELECTRIC STRENGTH TEST5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2(a), 5.6.6.2(b), 5.6.6.4.2(c), 5.6.6.4.2(d), 5.6.6.2(e) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 POWER MEASUREMENTS6.2.3.1 ARCING PIS DETERMINATION6.2.3.2 RESISTIVE PIS DETERMINATION6.3 NORMAL OPERATING CONDITIONS TEMPERATURE TEST6.4.3, ANNEX B.4 REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS6.4.3.3 REDUCTION OF THE LIKELIHOOD OF IGNITION ‐TEMPERATURES LIMITED BY FUSES6.6 TEST TO DETERMINE DELIVERED POWER: PS2DETERMINATION8.5.3, ANNEX T.8, ANNEX V ACCESSIBILITY TO MOVING PARTS8.7 – WALL OR CEILING MOUNTING TESTS8.8 HANDLE STRENGTHANNEX B.2.5 INPUT TEST: SINGLE PHASEANNEX B.2.5 INPUT TEST: POLYPHASEANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4 SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 / TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 / TRANSFORMER OVERLOADANNEX G.7.3.2 / STRAIN RELIEF TESTG.8.2.2 – Varistor Overload TestANNEX Q.1 / LIMITED POWER SOURCEANNEX T.2 (5.4.2.6, 5.4.3.2, G.15.3.6) / STEADY FORCE TEST, 10 NANNEX T.3 (4.4.4.2, 4.4.4.5, 5.3.2.3, G.15.3.6, U.3) / STEADY FORCE TEST, 30 NANNEX T.4 (4.4.4.2) / STEADY FORCE TEST, 100 NANNEX T.5 (4.4.4.2) / STEADY FORCE TEST, 250 NANNEX T.6 (4.4.4.4, 8.10.4) / ENCLOSURE IMPACT TESTANNEX T.7 (4.4.4.3) / DROP TESTANNEX T.8 (4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4) / STRESS RELIEF TEST
2021-12-02

ITAV

5.2, 5.7 / CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.2.1.1 / ACCESSIBLE ES1 CIRCUITS SEPARATED FROM OTHER ES CIRCUITS USING COMPONENTS5.4.1.4, Annex B.2 / MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.8 / DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 / BALL PRESSURE TEST 5.4.4.6.2 / SEPARABLE THIN SHEET MATERIAL5.4.8 / HUMIDITY CONDITIONING5.4.9 / ELECTRIC STRENGTH TEST5.5.2.2 / SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR 5.6.6.2(a), 5.6.6.2(b), 5.6.6.4.2(c), 5.6.6.4.2(d), 5.6.6.2(e) / RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 / PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 / PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 / POWER MEASUREMENTS6.3 / NORMAL OPERATING CONDITIONS TEMPERATURE TEST8.7 – WALL OR CEILING MOUNTING TESTSB.2.5 / INPUT TEST: SINGLE PHASEB.2.5 – INPUT TEST: POLYPHASEANNEX B.2.6 / NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 / SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4 / SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 / TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 / TRANSFORMER OVERLOADANNEX G.7.3.2 / STRAIN RELIEF TESTG.8.2.2 – Varistor Overload TestANNEX Q.1 / LIMITED POWER SOURCEANNEX T.2 (5.4.2.6, 5.4.3.2, G.15.3.6) / STEADY FORCE TEST, 10 NANNEX T.3 (4.4.4.2, 4.4.4.5, 5.3.2.3, G.15.3.6, U.3) / STEADY FORCE TEST, 30 NANNEX T.4 (4.4.4.2) / STEADY FORCE TEST, 100 NANNEX T.5 (4.4.4.2) / STEADY FORCE TEST, 250 NANNEX T.6 (4.4.4.4, 8.10.4) / ENCLOSURE IMPACT TESTANNEX T.7 (4.4.4.3) / DROP TESTANNEX T.8 (4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4) / STRESS RELIEF TEST
2021-12-02

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST.1.6.2 INPUT TEST: SINGLE – PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST2.10.2 DETERMINATION OF WORKING VOLTAGE2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL TESTS2.10.5.13 TRANSFORMER AND WIRE/INSULATION ELECTRIC STRENGTH3.2.6 STRAIN RELIEF TEST4.1 STABILITY TESTS4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 IMPACT TEST4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 Stress Relief Test4.3.6 DIRECT PLUG IN EQUIPMENT-MOMENT TEST4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST(SINGLE – PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 ABNORMAL OPERATON TESTS5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST1.6.2 INPUT TEST: SINGLE – PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST2.10.2 DETERMINATION OF WORKING VOLTAGE2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL TESTS2.10.5.13 TRANSFORMER AND WIRE/INSULATION ELECTRIC STRENGTH3.2.6 STRAIN RELIEF TEST4.1 STABILITY TESTS4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 IMPACT TEST4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 Stress Relief Test4.3.6 DIRECT PLUG IN EQUIPMENT-MOMENT TEST4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST(SINGLE – PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 ABNORMAL OPERATON TESTS5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST
2021-12-02

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST.1.6.2 INPUT TEST: SINGLE – PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST2.10.2 DETERMINATION OF WORKING VOLTAGE2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL TESTS2.10.5.13 TRANSFORMER AND WIRE/INSULATION ELECTRIC STRENGTH3.2.6 STRAIN RELIEF TEST4.1 STABILITY TESTS4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 IMPACT TEST4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 Stress Relief Test4.3.6 DIRECT PLUG IN EQUIPMENT-MOMENT TEST4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST(SINGLE – PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 ABNORMAL OPERATON TESTS5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST1.6.2 INPUT TEST: SINGLE – PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST2.10.2 DETERMINATION OF WORKING VOLTAGE2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL TESTS2.10.5.13 TRANSFORMER AND WIRE/INSULATION ELECTRIC STRENGTH3.2.6 STRAIN RELIEF TEST4.1 STABILITY TESTS4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 IMPACT TEST4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 Stress Relief Test4.3.6 DIRECT PLUG IN EQUIPMENT-MOMENT TEST4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST(SINGLE – PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 ABNORMAL OPERATON TESTS5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST
2021-12-02

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST.1.6.2 INPUT TEST: SINGLE – PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST2.10.2 DETERMINATION OF WORKING VOLTAGE2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL TESTS2.10.5.13 TRANSFORMER AND WIRE/INSULATION ELECTRIC STRENGTH3.2.6 STRAIN RELIEF TEST4.1 STABILITY TESTS4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 IMPACT TEST4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 Stress Relief Test4.3.6 DIRECT PLUG IN EQUIPMENT-MOMENT TEST4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST(SINGLE – PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 ABNORMAL OPERATON TESTS5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST1.6.2 INPUT TEST: SINGLE – PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST2.10.2 DETERMINATION OF WORKING VOLTAGE2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL TESTS2.10.5.13 TRANSFORMER AND WIRE/INSULATION ELECTRIC STRENGTH3.2.6 STRAIN RELIEF TEST4.1 STABILITY TESTS4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 IMPACT TEST4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 Stress Relief Test4.3.6 DIRECT PLUG IN EQUIPMENT-MOMENT TEST4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST(SINGLE – PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 ABNORMAL OPERATON TESTS5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST
2021-12-02