Abbott Laboratories
Abbott Laboratories
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2020-07-17 |
Further information
Stage | Country | Name |
---|---|---|
2 | United States of America |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
MEAS | IEC 61010-1:2010 | (4.4.1)COMPONENT ABNORMAL(4.4.2.3)PROTECTIVE CONDUCTOR ABNORMAL TEST(4.4.2.4)SHORT TERM / INTERMITTENT DUTY ABNORMAL TEST(4.4.2.5)MOTOR ABNORMAL TEST(4.4.2.6)CAPACITOR SHORT CIRCUIT ABNORMAL TEST(4.4.2.7.2)MAINS TRANSFORMER SHORT CIRCUIT TEST(4.4.2.7.3)MAINS TRANSFORMER OVERLOAD TEST(4.4.2.8)OUTPUT ABNORMAL TEST(4.4.2.9)MULTI-SUPPLY ABNORMAL TEST(4.4.2.10)COOLING ABNORMAL TEST(4.4.2.11)HEATING DEVICE ABNORMAL TEST (4.4.2.12)INSULATION BETWEEN CIRCUITS AND PARTS ABNORMAL TEST (4.4.2.13)INTERLOCK ABNORMAL TEST(5.1.3)MAINS SUPPLY (5.3)DURABILITY OF MARKINGS TEST (6.2)DETERMINATION OF ACCESSIBLE PARTS (6.3)LIMIT VALUES FOR ACCESSIBLE PARTS (6.5.2.3J)TIGHTENING TORQUE TEST (6.5.2.4 AND 6.5.2.5)GROUNDING CONTINUITY TEST (6.7 ANNEX K)INSULATION REQUIREMENTS (6.8)DIELECTRIC VOLTAGE WITHSTAND TEST (6.8.2)HUMIDITY PRECONDITIONING TEST (6.10.2.2)CORD ANCHORAGE TEST (6.10.3)PLUGS AND CONNECTORS (7.2)SHARP EDGES (7.3.4)(7.3.101)LIMITATION OF FORCE AND PRESSURE (7.3.5.1)GAP LIMITATIONS BETWEEN MOVING PARTS – ACCESS NORMALLY ALLOWED (7.3.5.2)GAP LIMITATIONS BETWEEN MOVING PARTS – ACCESS NORMALLY PREVENTED(7.4)STABILITY 10° TEST (7.5.2)HANDLES AND GRIPS (7.4)STABILITY 1 M TEST (7.5)WALL MOUNTING TEST (8.2.1)STATIC TEST (8.2.2)IMPACT TEST (8.3.1)DROP TEST OTHER THAN HAND-HELD AND DIRECT PLUG-IN (8.3.2)DROP TEST HAND-HELD AND DIRECT PLUG-IN(9.4)LIMITED ENERGY CIRCUIT DETERMINATION TEST (10.1-10.4)TEMPERATURE TEST (10.5.1)INTEGRITY OF CLEARANCES AND CREEPAGES TEST (10.5.2)RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURE TEST (11.2)CLEANING TEST (11.3)SPILLAGE TEST (11.4)OVERFLOW TEST (11.7.1)MAXIMUM WORKING PRESSURE MEASUREMENT TEST (11.7.2)LEAKAGE AND RUPTURE AT HIGH PRESSURE TEST(11.7.3)LEAKAGE FROM LOW PRESSURE PARTS TEST (11.7.4)OVERPRESSURE SAFETY DEVICE TEST(12.5.1)SOUND LEVEL(13.2.2)BATTERY ABNORMAL TEST(14.3)OVER TEMPERATURE PROTECTIVE DEVICES TEST(14.6)MAINS TRANSFORMER TESTED OUTSIDE EQUIPMENT(15.3)INTERLOCK RELIABILITY TEST | 2020-07-17 | |
MEAS | IEC 61010-1:2010/AMD1:2016 | ((4.4.1)COMPONENT ABNORMAL(4.4.2.3)PROTECTIVE CONDUCTOR ABNORMAL TEST(4.4.2.4)SHORT TERM / INTERMITTENT DUTY ABNORMAL TEST(4.4.2.5)MOTOR ABNORMAL TEST(4.4.2.6)CAPACITOR SHORT CIRCUIT ABNORMAL TEST(4.4.2.7.2)MAINS TRANSFORMER SHORT CIRCUIT TEST(4.4.2.7.3)MAINS TRANSFORMER OVERLOAD TEST(4.4.2.8)OUTPUT ABNORMAL TEST(4.4.2.9)MULTI-SUPPLY ABNORMAL TEST(4.4.2.10)COOLING ABNORMAL TEST(4.4.2.11)HEATING DEVICE ABNORMAL TEST (4.4.2.12)INSULATION BETWEEN CIRCUITS AND PARTS ABNORMAL TEST (4.4.2.13)INTERLOCK ABNORMAL TEST(5.1.3)MAINS SUPPLY (5.3)DURABILITY OF MARKINGS TEST (6.2)DETERMINATION OF ACCESSIBLE PARTS (6.3)LIMIT VALUES FOR ACCESSIBLE PARTS (6.5.2.3J)TIGHTENING TORQUE TEST (6.5.2.4 AND 6.5.2.5)GROUNDING CONTINUITY TEST (6.7 ANNEX K)INSULATION REQUIREMENTS (6.8)DIELECTRIC VOLTAGE WITHSTAND TEST (6.8.2)HUMIDITY PRECONDITIONING TEST (6.10.2.2)CORD ANCHORAGE TEST (6.10.3)PLUGS AND CONNECTORS (7.2)SHARP EDGES (7.3.4)(7.3.101)LIMITATION OF FORCE AND PRESSURE (7.3.5.1)GAP LIMITATIONS BETWEEN MOVING PARTS – ACCESS NORMALLY ALLOWED (7.3.5.2)GAP LIMITATIONS BETWEEN MOVING PARTS – ACCESS NORMALLY PREVENTED(7.4)STABILITY 10° TEST (7.5.2)HANDLES AND GRIPS (7.4)STABILITY 1 M TEST (7.5)WALL MOUNTING TEST (8.2.1)STATIC TEST (8.2.2)IMPACT TEST (8.3.1)DROP TEST OTHER THAN HAND-HELD AND DIRECT PLUG-IN (8.3.2)DROP TEST HAND-HELD AND DIRECT PLUG-IN(9.4)LIMITED ENERGY CIRCUIT DETERMINATION TEST (10.1-10.4)TEMPERATURE TEST (10.5.1)INTEGRITY OF CLEARANCES AND CREEPAGES TEST (10.5.2)RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURE TEST (11.2)CLEANING TEST (11.3)SPILLAGE TEST (11.4)OVERFLOW TEST (11.7.1)MAXIMUM WORKING PRESSURE MEASUREMENT TEST (11.7.2)LEAKAGE AND RUPTURE AT HIGH PRESSURE TEST(11.7.3)LEAKAGE FROM LOW PRESSURE PARTS TEST (11.7.4)OVERPRESSURE SAFETY DEVICE TEST(12.5.1)SOUND LEVEL(13.2.2)BATTERY ABNORMAL TEST(14.3)OVER TEMPERATURE PROTECTIVE DEVICES TEST(14.6)MAINS TRANSFORMER TESTED OUTSIDE EQUIPMENT(15.3)INTERLOCK RELIABILITY TEST | 2023-08-04 | |
MEAS | IEC 61010-1:2001 | (4.4.1)COMPONENT ABNORMAL(4.4.2.1)PROTECTIVE IMPEDANCE ABNORMAL TEST(4.4.2.2)PROTECTIVE CONDUCTOR ABNORMAL TEST(4.4.2.3)SHORT TERM / INTERMITTENT DUTY ABNORMAL TEST(4.4.2.4)LOCKED ARMATURE ABNORMAL TEST(4.4.2.55)CAPACITOR SHORT CIRCUIT ABNORMAL TEST(4.4.2.6.1)MAINS TRANSFORMER SHORT CIRCUIT TEST(4.4.2.6.2)MAINS TRANSFORMER OVERLOAD TEST(4.4.2.7)OUTPUT ABNORMAL TEST(4.4.2.8)MULTI-SUPPLY ABNORMAL TEST(4.4.2.9)COOLING ABNORMAL TEST(4.4.2.10)HEATING DEVICE ABNORMAL TEST (4.4.2.11)INSULATION BETWEEN CIRCUITS AND PARTS ABNORMAL TEST (4.4.2.12)INTERLOCK ABNORMAL TEST(5.1.3)INPUT TEST (5.3)DURABILITY OF MARKINGS TEST (6.2.1)APPLIED FORCE TEST (6.3)PERMISSIBLE LIMITS FOR ACCESSIBLE PARTS (6.5.1.2J)TIGHTENING TORQUE TEST (6.5.1.3 AND 6.5.1.4)GROUNDING CONTINUITY TEST (6.5.1.5)INDIRECT BONDING FOR MEASURING AND TESTING EQUIPMENT TEST (6.8)DIELECTRIC VOLTAGE WITHSTAND TEST (6.8.2)HUMIDITY PRECONDITIONING TEST (6.10.2)CORD ANCHORAGE TEST (6.10.3c)CAPACITOR DISCHARGE TEST (7.3)STABILITY 10° TEST (7.3)STABILITY 1 M TEST (7.4)STRENGTH OF HANDLES TEST (7.5)WALL MOUNTING TEST (8.1.2)DYNAMIC RIGIDITY TEST (8.2.1.1)CORNER DROP TEST (8.2.1.2)FACE DROP TEST(8.2.2)DROP TEST(9.3)LIMITED ENERGY CIRCUIT DETERMINATION TEST (10.1-10.4)TEMPERATURE TEST (10.5.1)INTEGRITY OF CLEARANCES AND CREEPAGES TEST (10.5.2)RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURE TEST (11.2)CLEANING TEST (11.3)SPILLAGE TEST (11.4)OVERFLOW TEST (11.7.1)MAXIMUM WORKING PRESSURE MEASUREMENT TEST (11.7.2)LEAKAGE AND RUPTURE AT HIGH PRESSURE TEST(11.7.3)LEAKAGE FROM LOW PRESSURE PARTS TEST (11.7.4)OVERPRESSURE SAFETY DEVICE TEST(12.5.1)SOUND PRESSURE LEVEL MEASUREMENT TEST(13.2.2)BATTERY ABNORMAL TEST(14.3)OVER TEMPERATURE PROTECTIVE DEVICES TEST(15.3)INTERLOCK RELIABILITY TEST | 2020-07-17 | |
MEAS | IEC 61010-2-010:2014 | (4.4.2.11) HEATING DEVICE ABNORMAL TEST ALL CLAUSES | 2020-07-17 | |
MEAS | IEC 61010-2-010:2003 | (4.4.2.10)HEATING DEVICE ABNORMAL TEST ALL CLAUSES | 2020-07-17 | |
MEAS | IEC 61010-2-020:2016 | (7.3.102.1)GENERAL ROTOR ASSEMBLIES(7.4.101)LABORATORY CENTRIFUGE MOVEMENT DURING MALFUNCTION(11.2)CLEANING11.101REFRIGERATED AND WATER-COOLED LABORATORY CENTRIFUGES | 2024-08-05 | |
MEAS | IEC 61010-2-081:2019 | 5.3)DURABILITY OF MARKINGS TEST (8.2.1) STATIC TEST ALL CLAUSES | 2023-08-11 | |
MEAS | IEC 61010-2-081:2015 | (5.3) DURABILITY OF MARKINGS TEST (8.2.1) STATIC TEST ALL CLAUSES | 2020-07-17 | |
MEAS | IEC 61010-2-081:2001 | (5.3)DURABILITY OF MARKINGS TEST (8.1.1)STATIC RIGIDITY TEST ALL CLAUSES | 2020-07-17 | |
MEAS | IEC 61010-2-081:2001/AMD1:2003 | (5.3)DURABILITY OF MARKINGS TEST (8.1.1)STATIC RIGIDITY TEST ALL CLAUSES | 2020-07-17 | |
MEAS | IEC 61010-2-101:2018 | 5.3)DURABILITY OF MARKINGS TEST(7.3.4)(7.3.101)LIMITATION OF FORCE AND PRESSURE (8.2.1)STATIC TEST ALL CLAUSES | 2023-08-04 | |
MEAS | IEC 61010-2-101:2015 | (5.3) DURABILITY OF MARKINGS TEST(7.3.4)(7.3.101)LIMITATION OF FORCE AND PRESSURE (8.2.1) STATIC TEST ALL CLAUSES | 2020-07-17 | |
MEAS | IEC 61010-2-101:2002 | (5.3)DURABILITY OF MARKINGS TEST (8.1.1)STATIC RIGIDITY TEST ALL CLAUSES | 2020-07-17 |