ABB SWITZERLAND LTD
ABB SWITZERLAND LTD
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2023-07-06 |
Further information
Stage | Country | Name |
---|---|---|
2 | Denmark |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
OFF | IEC 62040-1:2017 | 5.2.2.1/RD, Clearances and creepage distances test.5.2.2.3/RD, INGRESS PROTECTION TEST5.2.2.4.2.2/RD, STEADY FORCE TEST 30 N5.2.2.4.2.3/RD, STEADY FORCE TEST 250 N5.2.2.4.3/RD, IMPACT TEST5.2.2.4.5/RD, STRESS RELIEF TEST5.2.2.5/RD, STABILITY TEST5.2.3.2/RD, IMPULS VOLTAGE TEST5.2.3.3/RD, ALTERNATE TO IMPULSE VOLTAGE TEST5.2.3.4.2/RD, AC OR D.C. VOLTAGE TEST5.2.3.8/RD, CAPACITOR DISCHARGE TEST4.5.2, 4.5.2/RD, ENERGY HAZARD TEST (Capacitors mounted behind a panel)5.2.3.9/RD, LIMITED POWER SOURCE TEST5.2.3.10/RD, TEMPERATURE RISE TEST5.2.3.11.2/RD, PROTECTIVE EQUIPOTENTIAL BONDING IMPEDANCE TEST5.2.3.101, BACKFEED PROTECTION TEST5.2.3.102, INPUT CURRENT TEST5.2.3.104, TRANSFORMER PROTECTION TEST5.2.3.105, UNSYNCHRONISED LOAD TRANSFER TEST5.2.4/RD, 5.2.4, ABNORMAL OPERATION AND SIMULATED FAULTS TESTS5.2.4.4/RD, OUTPUT SHORT-CIRCUIT TEST5.2.4.5/RD, OUTPUT OVERLOAD TEST5.2.4.6/RD, BREAKDOWN OF COMPONENTS TEST5.2.4.8/RD, LOSS OF PHASE TEST5.2.6.3.1/RD, DRY HEAT TEST5.2.6.3.2/RD, DAMP HEAT TESTAnnex CC, CC.3, HYDROGEN GAS CONCENTRATION MEASUREMENT TESTAnnex CC, CC.4, BATTERY OVERCHARGE TEST | 2023-10-16 | |
OFF | IEC 62040-1:2017/AMD1:2021 | 4.11.101.2, CORD ANCHORAGES AND STRAIN RELIEF TEST5.2.2.1/RD, Clearances and creepage distances test.5.2.2.3/RD, INGRESS PROTECTION TEST5.2.2.4.2.2/RD, STEADY FORCE TEST 30 N5.2.2.4.2.3/RD, STEADY FORCE TEST 250 N5.2.2.4.3/RD, IMPACT TEST5.2.2.4.5/RD, STRESS RELIEF TEST5.2.2.5/RD, STABILITY TEST5.2.3.2/RD, IMPULS VOLTAGE TEST5.2.3.3/RD, ALTERNATE TO IMPULSE VOLTAGE TEST5.2.3.4.2/RD, AC OR D.C. VOLTAGE TEST5.2.3.8/RD, CAPACITOR DISCHARGE TEST4.5.2, 4.5.2/RD, ENERGY HAZARD TEST (Capacitors mounted behind a panel)5.2.3.9/RD, LIMITED POWER SOURCE TEST5.2.3.10/RD, TEMPERATURE RISE TEST5.2.3.11.2/RD, PROTECTIVE EQUIPOTENTIAL BONDING IMPEDANCE TEST5.2.3.101, BACKFEED PROTECTION TEST5.2.3.102, INPUT CURRENT TEST5.2.3.104, TRANSFORMER PROTECTION TEST5.2.3.105, UNSYNCHRONISED LOAD TRANSFER TEST5.2.4/RD, 5.2.4, ABNORMAL OPERATION AND SIMULATED FAULTS TESTS5.2.4.4/RD, OUTPUT SHORT-CIRCUIT TEST5.2.4.5/RD, OUTPUT OVERLOAD TEST5.2.4.6/RD, BREAKDOWN OF COMPONENTS TEST5.2.4.8/RD, LOSS OF PHASE TEST5.2.6.3.1/RD, DRY HEAT TEST5.2.6.3.2/RD, DAMP HEAT TESTAnnex CC, CC.3, HYDROGEN GAS CONCENTRATION MEASUREMENT TESTAnnex CC, CC.4, BATTERY OVERCHARGE TEST | 2023-10-16 | |
OFF | IEC 62040-1:2017/AMD2:2022 | 4.11.101.2, CORD ANCHORAGES AND STRAIN RELIEF TEST5.2.2.1/RD, Clearances and creepage distances test.5.2.2.3/RD, INGRESS PROTECTION TEST5.2.2.4.2.2/RD, STEADY FORCE TEST 30 N5.2.2.4.2.3/RD, STEADY FORCE TEST 250 N5.2.2.4.3/RD, IMPACT TEST5.2.2.4.5/RD, STRESS RELIEF TEST5.2.2.5/RD, STABILITY TEST5.2.3.2/RD, IMPULS VOLTAGE TEST5.2.3.3/RD, ALTERNATE TO IMPULSE VOLTAGE TEST5.2.3.4.2/RD, AC OR D.C. VOLTAGE TEST5.2.3.8/RD, CAPACITOR DISCHARGE TEST4.5.2, 4.5.2/RD, ENERGY HAZARD TEST (Capacitors mounted behind a panel)5.2.3.9/RD, LIMITED POWER SOURCE TEST5.2.3.10/RD, TEMPERATURE RISE TEST5.2.3.11.2/RD, PROTECTIVE EQUIPOTENTIAL BONDING IMPEDANCE TEST5.2.3.101, BACKFEED PROTECTION TEST5.2.3.102, INPUT CURRENT TEST5.2.3.104, TRANSFORMER PROTECTION TEST5.2.3.105, UNSYNCHRONISED LOAD TRANSFER TEST5.2.4/RD, 5.2.4, ABNORMAL OPERATION AND SIMULATED FAULTS TESTS5.2.4.4/RD, OUTPUT SHORT-CIRCUIT TEST5.2.4.5/RD, OUTPUT OVERLOAD TEST5.2.4.6/RD, BREAKDOWN OF COMPONENTS TEST5.2.4.8/RD, LOSS OF PHASE TEST5.2.6.3.1/RD, DRY HEAT TEST5.2.6.3.2/RD, DAMP HEAT TESTAnnex CC, CC.3, HYDROGEN GAS CONCENTRATION MEASUREMENT TESTAnnex CC, CC.4, BATTERY OVERCHARGE TEST | 2023-10-16 |