3M Company

Address(es)
  • 3M Center
    235‐BE‐03

    Maplewood 55144‐1000
    MN
    United States of America

Website Not available
Status

MEMBER

Acceptance date 2016-09-20

Further information

Stage

Country

Name

3

United States of America

3

United States of America

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.8.4.2, ANNEX T.8 PRODUCTS CONTAINING LITHIUM COIN/BUTTON CELL BATTERIES: STRESS RELIEF TEST4.8.4.3 PRODUCTS CONTAINING LITHIUM COIN/BUTTON CELL BATTERIES: BATTERY REPLACEMENT TEST4.8.4.4 PRODUCTS CONTAINING LITHIUM COIN/BUTTON CELL BATTERIES: DROP TEST4.8.4.5 PRODUCTS CONTAINING LITHIUM COIN/BUTTON CELL BATTERIES: IMPACT TEST4.8.4.6 PRODUCTS CONTAINING LITHIUM COIN/BUTTON CELL BATTERIES: CRUSH TEST5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.3 TEST FOR HYGROSCOPIC MATERIALS5.4.1.4 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.8 HUMIDITY CONDITIONING5.4.9 ELECTRIC STRENGTH5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6.2(A) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.6.6.2(C) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM:ALTERNATE TO 5.6.6.2(B)5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 POWER MEASUREMENTS6.2.3.1 ARCING PIS DETERMINATION6.2.3.2 RESISTIVE PIS DETERMINATION6.3 NORMAL OPERATING CONDITIONS TEMPERATURE TEST6.3 TEMPERATURE TEST:ABNORMAL OPERATING CONDITIONS6.4.2, ANNEX B.4 SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITION6.4.3.3 REDUCTION OF THE LIKELIHOOD OF IGNITION - TEMPERATURES LIMITED BY FUSES6.6 TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION8.10.3 CART, STAND OR CARRIER LOADING8.10.4 CART, STAND OR CARRIER IMPACT8.10.5 CART, STAND OR CARRIER MECHANICAL STABILITY8.10.6 CART, STAND OR CARRIER THERMOPLASTIC TEMPERATURE STABILITY8.5.3, ANNEX T.8, ANNEX V ACCESSIBILITY TO MOVING PARTS 8.6.2 STATIC STABILITY8.6.3 RELOCATION STABILITY TEST8.6.3.2 HORIZONTAL FORCE TEST8.7 WALL OR CEILING MOUNTING TESTS8.8 HANDLE STRENGTH8.9 WHEEL OR CASTER SECUREMENT9.6 Wireless Power Transmitters ANNEX B.2.5 INPUT TEST: SINGLE PHASEANNEX B.2.5 INPUT TEST: POLYPHASEANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4 SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 TRANSFORMER OVERLOADANNEX G.5.3.3.3 TRANSFORMER OVERLOAD – ALTERNATIVE TEST METHODANNEX G.5.4.6 LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSANNEX G.7.3.2 CORD STRAIN RELIEF TESTANNEX G.7.6.2 STRANDED WIREANNEX M.4.2 SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDSANNEX M.4.4, ANNEX T.7 DROP TEST OF EQUIPMENT CONTAINING A SECONDARY LITHIUM BATTERYANNEX T.2 - T.5 STEADY FORCE TEST (10N, 30N, 100N, 250N)ANNEX T.6 ENCLOSURE IMPACT TESTANNEX T.7 DROP TESTG.15.3.1 HYDROSTATIC PRESSUREG.15.3.2 CREEPAGE RESISTANCEG.5.4.3 MOTOR RUNNING OVERLOADG.5.4.4 MOTOR LOCKED-ROTOR OVERLOADG.5.4.5 RUNNING OVERLOAD TEST FOR DC MOTORSG.5.4.5.3 ALTERNATE RUNNING OVERLOAD TEST FOR DC MOTORSG.5.4.6.3 ALTERNATIVE LOCKED -ROTOR OVERLOAD TEST FOR D.C. MOTORSG.5.4.7 LOCKED-ROTOR OVERLOAD TEST FOR MOTORS WITH CAPACITORSG.5.4.8 THREE-PHASE MOTORSK.1.1 SAFETY INTERLOCKK.5 SAFETY INTERLOCK:FAIL SAFEK.6.2 SAFETY INTERLOCK: MECHANICAL ENDURANCEK.7.2, K.7.3 SAFETY INTERLOCK: SWITCHING DEVICE OVERLOAD AND ENDURANCEM.3.2 PROTECTION CIRCUITS FOR BATTERIESM.5 RISK OF BURNS DUE TO SHORT-CIRCUIT DURING CARRYINGP.3 SPILLAGE OF INTERNAL LIQUIDSQ.1 LIMITED POWER SOURCET.8 STRESS RELIEFT.8, 4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4 STRESS RELIEF - ALTERNATE TEST PER IEC 60695-10-35.4.10, 5.4.10.2.3 SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: STEADY STATE TEST5.4.11.3 TEST FOR SEPARATION BETWEEN EXTERNAL CIRCUITS AND EARTH5.7.7 SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS6.4.3, ANNEX B.4 REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONSANNEX M.5, ANNEX P.2.3 RISK OF BURN DUE TO SHORT-CIRCUIT DURING CARRYINGP.2.3.2 CONSEQUENCE OF ENTRY TESTY.6.2 Impact Test for outdoor equipment
2023-09-21

ITAV

4.8.4.2, ANNEX T.84.8.4.34.8.4.44.8.4.54.8.4.65.2, 5.75.4.1.35.4.1.45.4.1.85.4.85.4.95.5.2.25.6.6.2(A)5.6.6.2(C)5.75.7.56.2.2.2, 6.2.2.36.2.3.16.2.3.26.36.36.4.2, ANNEX B.46.4.3.36.68.10.38.10.48.10.58.10.68.5.3, ANNEX T.8, ANNEX V8.6.28.6.38.6.3.28.78.88.9ANNEX B.2.5ANNEX B.2.5ANNEX B.2.6ANNEX B.3ANNEX B.4ANNEX F.3.10 ANNEX G.5.3.3ANNEX G.5.3.3.3ANNEX G.5.4.6ANNEX G.7.3.2ANNEX G.7.6.2ANNEX M.4.2ANNEX M.4.4, ANNEX T.7ANNEX T.2 - T.5ANNEX T.6ANNEX T.7G.15.3.1G.15.3.2G.5.4.3G.5.4.4G.5.4.5G.5.4.5.3G.5.4.6.3G.5.4.7G.5.4.8K.1.1K.5K.6.2K.7.2, K.7.3M.3.2M.5P.3Q.1T.8T.8, 4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.45.4.10, 5.4.10.2.3 5.4.11.3 5.7.7 6.4.3, ANNEX B.4ANNEX M.5, ANNEX P.2.3 P.2.3.2
2019-10-02

MEAS

10.1-10.410.5.110.5.211.211.311.411.7.111.7.211.7.311.7.413.2.214.315.215.34.4.14.4.2.104.4.2.114.4.2.124.4.2.134.4.2.144.4.2.24.4.2.34.4.2.44.4.2.54.4.2.64.4.2.7.24.4.2.7.34.4.2.84.4.2.95.1.35.36.10.2.26.10.36.2.16.2.26.36.5.2.4 AND 6.5.2.56.5.2.66.7, ANNEX K6.86.8.27.47.47.5.27.5.37.68.2.18.2.28.3.18.3.28.9.3.3 8.9.3.4 9.4
2015-04-27

MEAS

10.1-10.410.5.110.5.211.211.311.411.7.111.7.211.7.311.7.413.2.214.315.215.34.4.14.4.2.104.4.2.114.4.2.124.4.2.134.4.2.144.4.2.24.4.2.34.4.2.44.4.2.54.4.2.64.4.2.7.24.4.2.7.34.4.2.84.4.2.95.1.35.36.10.2.26.10.3C6.26.2.26.36.5.2.4 6.5.2.56.5.2.66.7ANNEX K6.86.8.27.47.47.5.27.5.37.68.2.18.2.28.3.18.3.28.9.3.3 8.9.3.4 9.4
2019-10-02

MED

1111.6.211.6.311.6.611.81313.1.213.2.13.213.2.13.313.2.413.2.513.2.613.2.713.2.813.2.915.3.215.3.315.3.415.3.515.3.615.4.215.4.315.5.1.215.5.1.34.115.75.9.27.1.38.11.3.58.4.2, 8.11.18.4.38.4.48.5.48.5.5.18.5.5.28.6.4.A8.78.8.38.9.28.9.3.38.9.3.49.2.2.2 9.4.29.4.2.4.29.4.2.4.39.4.3.19.4.3.29.4.4C9.79.8.4
2015-12-16

MED

1111.6.211.6.311.6.611.81313.1.213.2.13.213.2.13.313.2.413.2.513.2.613.2.713.2.813.2.915.3.215.3.315.3.415.3.515.3.615.4.215.4.315.5.1.215.5.1.34.115.75.9.27.1.38.11.3.58.4.2, 8.11.18.4.38.4.48.5.48.5.5.18.5.5.28.6.4.A8.78.8.38.9.28.9.3.38.9.3.49.2.2.2 9.4.29.4.2.4.29.4.2.4.39.4.3.19.4.3.29.4.4C9.79.8.4
2015-12-16

MED

1111.6.211.6.3 11.6.6 11.81313.1.2 13.2.13.2 13.2.13.3 13.2.4 13.2.5 13.2.613.2.7 13.2.8 13.2.9 15.3.2 15.3.3 15.3.4 15.3.5 15.3.6 15.4.2 15.4.315.5.1.2 15.5.1.315.5.2 4.115.7 5.9.2 7.1.3B)8.11.3.5 8.4.2 AND 8.11.18.4.28.4.3 8.4.4 8.5.48.5.5.1 8.5.5.2 8.6.4.A 8.7 8.8.3 8.9.3.3 8.9.3.4 9.2.2.29.4.29.4.2.4.3 9.4.3.1 9.4.3.2 9.4.4C9.79.8.4
2022-10-28

MED

201.11.1.2.1.102.1201.11.1.2.1.102.3201.11.6.3201.11.8.102 201.12.3.104201.13.1.2.101.1201.15.4.1.101201.9.8.101
2017-11-17

MED

201.11.1.2.1.102.1201.11.1.2.1.102.3201.11.6.3201.11.8.102 201.12.3.104201.13.1.2.101.1201.15.4.1.101201.9.8.101
2021-02-05