Taier Labs (Jiaxing) Co., Ltd.
Taier Labs (Jiaxing) Co., Ltd.
Address(es) |
|
Website | Not available |
Acceptance date | 2021-03-29 |
Accredited by | CNAS,CNAS |
Certificates | |
Contacts | Contacts
|
Responsible National Certification Body
Name | Country |
---|---|
China |
Also operating under the following NCBs
No information declared
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Standard | Scope limitation | Acceptance date | Responsible National Certification Body |
---|---|---|---|---|
PV | IEC 61215-1:2021 | 2021-11-09 | ||
PV | IEC 61215-1:2016 | 2021-03-29 | ||
PV | IEC 61215-1-1:2021 | 2021-11-09 | ||
PV | IEC 61215-1-1:2016 | 2021-03-29 | ||
PV | IEC 61215-1-2:2021 | 2022-06-23 | ||
PV | IEC 61215-1-2:2021/AMD1:2022 | 2022-06-23 | ||
PV | IEC 61215-1-2:2016 | 2021-03-29 | ||
PV | IEC 61215-1-3:2021 | 2024-06-24 | ||
PV | IEC 61215-1-3:2021/AMD1:2022 | 2024-06-24 | ||
PV | IEC 61215-1-3:2016 | 2021-03-29 | ||
PV | IEC 61215-1-4:2021 | 2024-06-24 | ||
PV | IEC 61215-1-4:2021/AMD1:2022 | 2024-06-24 | ||
PV | IEC 61215-1-4:2016 | 2021-03-29 | ||
PV | IEC 61215-2:2021 | 2021-11-09 | ||
PV | IEC 61215-2:2016 | 2021-03-29 | ||
PV | IEC 61730-1:2023 | 2023-10-31 | ||
PV | IEC 61730-1:2016 | 2021-03-29 | ||
PV | IEC 61730-2:2023 | 2023-10-31 | ||
PV | IEC 61730-2:2016 | 2021-03-29 |