Korea Energy Agency (KEA)
Korea Energy Agency (KEA)
Address(es) |
|
Website | https://www.kemco.or.kr |
Acceptance date | 2008-12-01 |
Accredited by | KAS |
Certificates |
|
Contacts | No information declared |
Reporting to Member Body
Name | Country |
---|---|
Korean Agency for Technology and Standards (KATS) | Korea, Republic of |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Standard | Acceptance Date | Status | Group Differences | National Differences |
---|---|---|---|---|---|
PV | 2008-12-01 | ISSUING | |||
PV | 2008-12-01 | ISSUING | |||
PV | 2015-09-09 | ISSUING | |||
PV | 2013-11-26 | ISSUING | |||
PV | 2013-11-26 | ISSUING | |||
PV | 2015-09-09 | ISSUING | |||
PV | 2015-09-09 | ISSUING | |||
PV | 2015-09-09 | ISSUING |
No information declared
No information declared
Customer Testing Facilities Acceptance
CTF Stage | Acceptance | Comments | Legal requirements |
---|---|---|---|
Stage 1 | - | ||
Stage 2 | - | ||
Stage 3 | - | ||
Stage 4 | Stage 4: Required further examinations on the national rules for certification scheme. Unfortunately, it could be difficult to accept the CTF Stage 4. Because we have concern of weakening the function of Third Party Verification | - |
Customer Testing Facilities
No information declared