Tymphany Acoustic Technology Ltd

Address(es)
  • 6F, No.203, Nanyang St., Xizhi Dist, 221
    New Taipei City
    Chinese Taipei

Website Not available
Status

WITHDRAWN

Acceptance date 2020-04-16

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, ANNEX T.4 - STEADY FORCE TEST, 100 N4.4.3.2, ANNEX T.5 - STEADY FORCE TEST, 250 N4.4.3.2, ANNEX T.3 - STEADY FORCE TEST, 30 N4.4.3.3, ANNEX T.7 - DROP TEST4.4.3.4, ANNEX T.6 - IMPACT TEST4.4.3.8, ANNEX T.8 - STRESS RELIEF TEST5.4.1.4, Annex B.2 - MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS6.2.2.2, 6.2.2.3 - POWER MEASUREMENTS6.3 - NORMAL OPERATING CONDITIONS TEMPERATURE TEST6.4.3, ANNEX B.4 - REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS6.4.3.3 - REDUCTION OF THE LIKELIHOOD OF IGNITION - TEMPERATURES LIMITED BY FUSES6.6 - TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION8.6.2 - STATIC STABILITYB.2.5 - INPUT TEST: SINGLE PHASEB.2.6 - NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 - SIMULATED ABNORMAL OPERATING CONDITIONSB.4 - SIMULATED SINGLE FAULT CONDITIONS6.4.2, ANNEX B.4 - SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITIONANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSG.5.4.6 - LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSG.5.4.6.3 - ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSANNEX M.3.2 – PROTECTION CIRCUITS FOR BATTERIESANNEX Q.1 - LIMITED POWER SOURCEANNEX T.2 , 5.4.2.6, 5.4.3.2, G.15.3.6 – STEADY FORCE TEST, 10 N
2020-01-10

ITAV

Accepted clauses 4.4.4.2, ANNEX T.4 - Steady Force Test, 100 NAccepted clauses 4.4.4.2, ANNEX T.5 - Steady Force Test, 250 NAccepted clauses 4.4.4.4, ANNEX T.6 - Impact TestAccepted clauses 4.4.4.3, ANNEX T.7 - Drop TestAccepted clauses 4.4.4.7, ANNEX T.8 - Stress Relief TestAccepted clauses 5.2, 5.7 Classification of Electrical Energy SourcesAccepted clauses 5.4.1.8 Determination of Working VoltageAccepted clauses 5.4.4.6.2 Separable Thin Sheet MaterialAccepted clauses 5.4.2, 5.4.3 Clearance and Creepage Accepted clauses Distance MeasurementAccepted clauses 5.4.2.6, T.2 Steady Force Test, 10NAccepted clauses 5.4.8 Humidity ConditioningAccepted clauses 5.4.9.1 Electric StrengthAccepted clauses 5.5.2.2 Stored Discharge on CapacitorsAccepted clauses 5.6.6.2 Resistance of The Protective Bonding SystemAccepted clauses 5.7 Prospective Touch Voltage and Touch Current MeasurementAccepted clauses 6.2.2.2, 6.2.2.3 - Power MeasurementsAccepted clauses 8.7 - Wall or Ceiling Mounting TestsAccepted clauses B.2.5 - Input Test: Single PhaseAccepted clauses B.2.6 - Normal Operating Conditions Temperature MeasurementAccepted Clauses B.3 - SIMULATED ABNORMAL OPERATING CONDITIONSAccepted clauses B.4 - Simulated Single Fault ConditionsAccepted clauses ANNEX F.3.10 – Test for The Permanence of MarkingsAccepted clauses G.5.3.3 Transformer Overloaded TestAccepted clauses ANNEX Q.1 - Limited Power Source
2021-08-18