Thermo Finnigan LLC.
Thermo Finnigan LLC.
Address(es) |
|
Website | Not available |
Status | WITHDRAWN |
Acceptance date | 2021-05-17 |
Further information
Stage | Country | Name |
---|---|---|
1 | Germany |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
MEAS | IEC 61010-1:2010 | 4.4 Single fault condition5.1.3.c Mains supply test5.3 Durability of markings test6, 6.2, 6.3.1, 6.3.2 Electric shock protection6.5.2.4 Bonding impedance of plug connected equipment6.7 Insulation requirements- Clearances and Creepages6.8 Dielectric strength tests8.2.1 Enclosure rigidity test8.2.2 Dynamic test9 Protection against the spread of fire10.1 Temperature Measurements11 Protection against hazards from fluids-Cleaning12.5.1 Sound levelNote: Exception for the Humidity preconditioning tests of Clause 6.8.2. (To be performed at CBTL facility). | 2021-05-17 | |
MEAS | IEC 61010-1:2010/AMD1:2016 | 4.4 Single fault condition5.1.3.c Mains supply test5.3 Durability of markings test6, 6.2, 6.3.1, 6.3.2 Electric shock protection6.5.2.4 Bonding impedance of plug connected equipment6.7 Insulation requirements- Clearances and Creepages6.8 Dielectric strength tests8.2.1 Enclosure rigidity test8.2.2 Dynamic test9 Protection against the spread of fire10.1 Temperature Measurements11 Protection against hazards from fluids-Cleaning12.5.1 Sound levelNote: Exception for the Humidity preconditioning tests of Clause 6.8.2. (To be performed at CBTL facility). | 2021-05-17 | |
MEAS | IEC 61010-2-010:2019 | 4.4 Single fault condition5.1.3.c Mains supply test5.3 Durability of markings test6, 6.2, 6.3.1, 6.3.2 Electric shock protection6.5.2.4 Bonding impedance of plug connected equipment6.7 Insulation requirements- Clearances and Creepages6.8 Dielectric strength tests8.2.1 Enclosure rigidity test8.2.2 Dynamic test9 Protection against the spread of fire10.1 Temperature Measurements11 Protection against hazards from fluids-Cleaning12.5.1 Sound levelNote: Exception for the Humidity preconditioning tests of Clause 6.8.2. (To be performed at CBTL facility). | 2021-05-17 | |
MEAS | IEC 61010-2-101:2018 | 4.4 Single fault condition5.1.3.c Mains supply test5.3 Durability of markings test6, 6.2, 6.3.1, 6.3.2 Electric shock protection6.5.2.4 Bonding impedance of plug connected equipment6.7 Insulation requirements- Clearances and Creepages6.8 Dielectric strength tests8.2.1 Enclosure rigidity test8.2.2 Dynamic test9 Protection against the spread of fire10.1 Temperature Measurements11 Protection against hazards from fluids-Cleaning12.5.1 Sound levelNote: Exception for the Humidity preconditioning tests of Clause 6.8.2. (To be performed at CBTL facility). | 2021-05-17 |