SHENZHEN MEGMEET ELECTRICAL CO LTD

Address(es)
  • 5TH FL, TOWER A B C501-503 D E UNIS INFORPORT, 13 LANGSHAN RD N SEC HI-TECH INDUSTRIAL PARK NAN SHAN SHENZHEN, 518057
    GUANGDONG
    China

Website Not available
Status

WITHDRAWN

Acceptance date 2022-03-31

Further information

Stage

Country

Name

1

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

STEADY FORCE TEST, 250 N (4.4.4.2, ANNEX T.5)STEADY FORCE TEST, 100 N (4.4.4.2, ANNEX T.4)STEADY FORCE TEST, 10 N (5.4.2.6, 5.4.3.2, G.15.3.6, ANNEX T.2)IMPACT TEST (4.4.4.4, ANNEX T.6)STRESS RELIEF TEST (4.4.4.7, ANNEX T.8)CLASSIFICATION OF ELECTRICAL ENERGY SOURCES (5.2, 5.7)MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS (5.4.1.4, 6.2, 9.2.5 ANNEX B.2)DETERMINATION OF WORKING VOLTAGE (5.4.1.8)HUMIDITY CONDITIONING (5.4.8)ELECTRIC STRENGTH TEST (5.4.9)RESISTANCE OF THE PROTECTIVE BONDING SYSTEM (5.6.6.2)PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT (5.7)POWER MEASUREMENTS (6.2.2.2, 6.2.2.3)INPUT TEST (B.2.5)SIMULATED ABNORMAL OPERATING CONDITIONS (B.3)TRANSFORMER OVERLOAD(ANNEX G.5.3.3)LIMITED POWER SOURCE(ANNEX Q.1)SIMULATED SINGLE FAULT CONDITIONS (B.4)Equipment mounted to a wall or ceiling (8.7)Handle strength test method (8.8)Durability, legibility and permanence of markings (F.3.10)STATIC STABILITY (8.6.2)
2022-03-31

OFF

1.6.2 - INPUT TEST1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST4.2.1 - 4.2.4 – STEADY FORCE TESTS4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.5.1, 1.4.12, 1.4.13 HEATING TEST5.2.2 ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 5.3.9 ABNORMAL OPERATION TESTS5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TESTSTATIC STABILITY (4.1)CONNECTOR CURRENT INTERRUPTION TEST (4.3.5)
2022-03-31

OFF

1.6.2 - INPUT TEST1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST4.2.1 - 4.2.4 – STEADY FORCE TESTS4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.5.1, 1.4.12, 1.4.13 HEATING TEST5.2.2 ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 5.3.9 ABNORMAL OPERATION TESTS5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TESTSTATIC STABILITY (4.1)CONNECTOR CURRENT INTERRUPTION TEST (4.3.5)
2022-03-31

OFF

1.6.2 - INPUT TEST1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST4.2.1 - 4.2.4 – STEADY FORCE TESTS4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.5.1, 1.4.12, 1.4.13 HEATING TEST5.2.2 ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 5.3.9 ABNORMAL OPERATION TESTS5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TESTSTATIC STABILITY (4.1)CONNECTOR CURRENT INTERRUPTION TEST (4.3.5)
2022-03-31