SHENZHEN ACE BATTERY CO.,LTD DAPENG BRANCH

Address(es)
  • Room 101, Building B05, BAK Industrial Park, No. 119-2 Kuipeng Road, Kuixin Zone, Kuichong Street, District, Shenzhen Guangdong 518119,
    Dapeng 518119,
    China

Website Not available
Status

MEMBER

Acceptance date 2021-05-10

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

BATT

5.2 Insulation and wiring5.6.2 Design recommendation (Lithium system)8.1 Charging procedure for test purposes (for Cells and Batteries)8.1.2 Charge (Procedure 2)8.2.1 Continuous charging at constant voltage (Cells)8.2.2 Moulded case stress at high ambient temperature (Batteries)8.3.1 External short circuit (Cells)8.3.2 External short circuit (Batteries)8.3.3 Free fall (Cells and Batteries)8.3.4 Thermal abuse (Cells)8.3.5 Crush (Cells)8.3.6 Over-charging of battery8.3.7 Forced Discharge (Cells)8.3.8 Transport tests (Cells)
2021-05-14

BATT

5.2 Insulation and wiring7.1 Charging procedure for test purposes (for Cells and Batteries)7.2.1 Continuous charge;7.3.1 External short-circuit (Cell)7.3.3 Free fall; 7.3.4 Thermal abuse; 7.3.5 Crush; 7.3.7 Forced discharge;7.2.2 Case stress;7.3.2 External short-circuit (Battery);7.3.3 Free fall;7.3.6 Overcharge;7.3.8.1 Vibration 7.3.8.2 Mechanical shock
2021-05-14

BATT

7.2.1 Continuous charging at constant voltage (cells)7.3.1 External short-circuit (cell)7.3.3 Free fall7.3.4 Thermal abuse (cells)7.3.5 Crush (cells)7.3.7 Forced discharge (cells)7.3.9 Forced internal short-circuit (cells)7.2.2 Case stress at high ambient temperature (battery)7.3.2 External short-circuit (battery)7.3.3 Free fall7.3.6 Over-charging of battery7.3.8 Mechanical tests (batteries)- 7.3.8.1 Vibration- 7.3.8.2 Mechanical shock
2023-03-15

BATT

7.2.1 External short-circuit test 7.2.2 Impact test7.2.3.2 Whole drop test (cell or cell block, and battery system) 7.2.3.3 Edge and corner drop test (cell or cell block, and battery system) 7.2.4 Thermal abuse test 7.2.5 Overcharge test 7.2.6 Forced discharge test 7.3.3 Propagation test;8.2.2 Overcharge control of voltage;8.2.3 Overcharge control of current;8.2.4 Overheating control
2022-07-20

BATT

7.2.1 External short-circuit test 7.2.2 Impact test7.2.3.2 Whole drop test (cell or cell block, and battery system) 7.2.3.3 Edge and corner drop test (cell or cell block, and battery system) 7.2.4 Thermal abuse test 7.2.5 Overcharge test 7.2.6 Forced discharge test 7.3.3 Propagation test;8.2.2 Overcharge control of voltage;8.2.3 Overcharge control of current;8.2.4 Overheating control
2021-05-14

ITAV

5.4.1.4, ANNEX B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS 6.2.2.2, 6.2.2.3 POWER MEASUREMENTS ANNEX B.2.5 INPUT TEST: SINGLE PHASE ANNEX B.2.6 OPERATING TEMPERATURE MEASUREMENT CONDITIONS ANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONS ANNEX B.4 SIMULATED SINGLE FAULT CONDITIONS ANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSANNEX M.3.2 PROTECTION CIRCUITS FOR BATTERIESANNEX M.4.2 SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDS ANNEX M.4.4 (ANNEX T.7) DROP TEST OF EQUIPMENT CONTAINING A SECONDARY LITHIUM BATTERY ANNEX M.5 (ANNEX P.2.3) RISK OF BURN DUE TO SHORT-CIRCUIT DURING CARRYING ANNEX Q.1 LIMITED POWER SOURCE ANNEX T.4 (4.4.3.2) STEADY FORCE TEST, 100 N ANNEX T.7 (4.4.3.3) DROP TEST ANNEX T.8 (4.4.3.8) STRESS RELIEF TEST
2021-05-14

ITAV

5.4.1.4, Annex B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS6.2.2.2, 6.2.2.3 POWER MEASUREMENTSANNEX B.2.5 INPUT TEST: SINGLE PHASE ANNEX B.2.6 OPERATING TEMPERATURE MEASUREMENT CONDITIONS ANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONS ANNEX B.4 SIMULATED SINGLE FAULT CONDITIONS ANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGS ANNEX M.3.2 PROTECTION CIRCUITS FOR BATTERIES ANNEX M.4.2 SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDS ANNEX M.4.4 (ANNEX T.7) DROP TEST OF EQUIPMENT CONTAINING A SECONDARY LITHIUM BATTERY ANNEX M.5 (ANNEX P.2.3) RISK OF BURN DUE TO SHORT-CIRCUIT DURING CARRYING ANNEX Q.1 LIMITED POWER SOURCE ANNEX T.4 (4.4.4.2) STEADY FORCE TEST, 100 NANNEX T.4 (4.4.4.2) STEADY FORCE TEST, 250 NANNEX T.6 (4.4.4.4) IMPACT TESTANNEX T.7 (4.4.4.3) DROP TEST ANNEX T.8 (4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4) STRESS RELIEF TEST
2021-05-14

OFF

1.6.2 INPUT TEST: SINGLE‐PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.5, 2.1.2,1.2.8.10 ENERGY HAZARD MEASUREMENTS2.5 LIMITED POWER SOURCE TEST4.2.1‐4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.2.6 DROP TEST4.2.7 STRESS RELIEF TEST4.3.8 BATTERY TESTS4.5.1, 1.4.12, 1.4.13 HEATING TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST
2022-05-18

OFF

1.6.2 INPUT TEST: SINGLE‐PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.5, 2.1.2,1.2.8.10 ENERGY HAZARD MEASUREMENTS2.5 LIMITED POWER SOURCE TEST4.2.1‐4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.2.6 DROP TEST4.2.7 STRESS RELIEF TEST4.3.8 BATTERY TESTS4.5.1, 1.4.12, 1.4.13 HEATING TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST
2022-05-18

OFF

1.6.2 INPUT TEST: SINGLE‐PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.5, 2.1.2,1.2.8.10 ENERGY HAZARD MEASUREMENTS2.5 LIMITED POWER SOURCE TEST4.2.1‐4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.2.6 DROP TEST4.2.7 STRESS RELIEF TEST4.3.8 BATTERY TESTS4.5.1, 1.4.12, 1.4.13 HEATING TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST
2022-05-18