QCS Hangzhou Design Center
QCS Hangzhou Design Center
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2022-01-06 |
Further information
Stage | Country | Name |
---|---|---|
2 | Denmark |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
ITAV | IEC 62368-1:2023 | 4.4.3.4, ANNEX T.6, ANNEX Y.6.2 – IMPACT TEST5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.3 – TEST FOR HYGROSCOPIC MATERIALS5.4.1.5.2, 5.4.1.5.3 – TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR AN INSULATING COMPOUND5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 – BALL PRESSURE TEST5.4.4.6.2 – SEPARABLE THIN SHEET MATERIAL5.4.4.6.3, 5.4.4.6.4– NON-SEPARABLE THIN SHEET MATERIAL5.4.7, 5.4.1.5.3 – TESTS FOR SEMICONDUCTOR COMPONENTS AND CEMENTED JOINTS5.4.8 – HUMIDITY CONDITIONING5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.5.2.2 – CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR 5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS5.7.6 – PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS6.2.3.1 – ARCING PIS DETERMINATION6.2.3.2 – RESISTIVE PIS DETERMINATIONB.2.5 – INPUT TEST: SINGLE PHASEB.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSANNEX G.5.3.3 – TRANSFORMER OVERLOADANNEX G.5.3.3.3 – TRANSFORMER OVERLOAD – ALTERNATIVE TEST METHOD | 2024-02-27 | |
ITAV | IEC 62368-1:2018 | 4.4.3.4, ANNEX T.6, ANNEX Y.6.2 – IMPACT TEST5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.3 – TEST FOR HYGROSCOPIC MATERIALS5.4.1.5.2, 5.4.1.5.3 – TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR AN INSULATING COMPOUND5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 – BALL PRESSURE TEST5.4.4.6.2 – SEPARABLE THIN SHEET MATERIAL5.4.4.6.3, 5.4.4.6.4– NON-SEPARABLE THIN SHEET MATERIAL5.4.7, 5.4.1.5.3 – TESTS FOR SEMICONDUCTOR COMPONENTS AND CEMENTED JOINTS5.4.8 – HUMIDITY CONDITIONING5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.5.2.2 – CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR 5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS5.7.6 – PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS6.2.3.1 – ARCING PIS DETERMINATION6.2.3.2 – RESISTIVE PIS DETERMINATIONB.2.5 – INPUT TEST: SINGLE PHASEB.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSANNEX G.5.3.3 – TRANSFORMER OVERLOADANNEX G.5.3.3.3 – TRANSFORMER OVERLOAD – ALTERNATIVE TEST METHOD | 2022-01-06 | |
ITAV | IEC 62368-1:2014 | 4.4.4.4, ANNEX T.6 – IMPACT TEST5.2.2.2 - Voltage and Steady State conditions5.2.2.3 - Capacitance Limits5.4.1.3 – TEST FOR HYGROSCOPIC MATERIALS5.4.1.4, Annex B.2 – MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.5.2, 5.4.1.5.3 – TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR AN INSULATING COMPOUND5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 – BALL PRESSURE TEST5.4.4.6.2 – SEPARABLE THIN SHEET MATERIAL5.4.4.6.4– NON-SEPARABLE THIN SHEET MATERIAL5.4.7, 5.4.1.5.3 – TESTS FOR SEMICONDUCTOR COMPONENTS AND CEMENTED JOINTS5.4.8 – HUMIDITY CONDITIONING5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.5.2.2 – SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS – SINGLE-PHASE EQUIPMENT ON TN OR TT SYSTEM5.7.5 – PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS6.2.3.1 – ARCING PIS DETERMINATION6.2.3.2 – RESISTIVE PIS DETERMINATIONB.2.5 – INPUT TEST: SINGLE PHASEB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSANNEX G.5.3.3 – TRANSFORMER OVERLOADANNEX G.5.3.3.3 – TRANSFORMER OVERLOAD – ALTERNATIVE TEST METHOD | 2022-01-06 | |
OFF | IEC 60950-1:2005 | 1.2.2.1 - GUIDE INFORMATION PAGE - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE-PHASE2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.1.1.8 ENERGY HAZARD MEASUREMENTS - DC MAINS SUPPLIES2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST2.10.5.9, 2.10.5.10, 2.10.5.6 – THIN SHEET MATERIAL TESTS2.10.10, 2.10.9 TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR INSULATING COMPOUND2.10.11, 2.10.9 – TESTS FOR SEMICONDUCTOR DEVICES AND FOR CEMENTED JOINTS4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 5.3.9 ABNORMAL OPERATION TESTS5.3.3, 5.3.7b, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TESTANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS | 2022-01-06 | |
OFF | IEC 60950-1:2005/AMD1:2009 | 1.2.2.1 - GUIDE INFORMATION PAGE - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE-PHASE2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.1.1.8 ENERGY HAZARD MEASUREMENTS - DC MAINS SUPPLIES2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST2.10.5.9, 2.10.5.10, 2.10.5.6 – THIN SHEET MATERIAL TESTS2.10.10, 2.10.9 TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR INSULATING COMPOUND2.10.11, 2.10.9 – TESTS FOR SEMICONDUCTOR DEVICES AND FOR CEMENTED JOINTS4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 5.3.9 ABNORMAL OPERATION TESTS5.3.3, 5.3.7b, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TESTANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS | 2022-01-06 | |
OFF | IEC 60950-1:2005/AMD2:2013 | 1.2.2.1 - GUIDE INFORMATION PAGE - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE-PHASE2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.1.1.8 ENERGY HAZARD MEASUREMENTS - DC MAINS SUPPLIES2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST2.10.5.9, 2.10.5.10, 2.10.5.6 – THIN SHEET MATERIAL TESTS2.10.10, 2.10.9 TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR INSULATING COMPOUND2.10.11, 2.10.9 – TESTS FOR SEMICONDUCTOR DEVICES AND FOR CEMENTED JOINTS4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 5.3.9 ABNORMAL OPERATION TESTS5.3.3, 5.3.7b, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TESTANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS | 2022-01-06 |