Nokia Solutions and Networks Oy [Oulu]
Nokia Solutions and Networks Oy [Oulu]
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2019-10-02 |
Further information
Stage | Country | Name |
---|---|---|
3 | Finland |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
ITAV | IEC 62368-1:2018 | Testing is limited to equipment supplied from DC mains not exceeding ES1 levels.4.4.3.2 Steady force tests4.4.3.4 Impact tests4.4.3.10 Compliance criteria5.4.1.4 Maximum operating temperature for insulating materials5.4.2 Clearancesexcluding subclause 5.4.2.3.2.5 Determining transient voltage levels by measurement5.4.3 Creepage distances5.6.6 Resistance of the protective system6.2.2 Power source circuit classifications6.3 Safeguards against fire under normal operating conditions and abnormal operating conditions8.5 Safeguards against moving parts excluding subclauses 8.5.4 and 8.5.5 8.7 Equipment mounted to a wall, ceiling or other structure excluding test 2 and 38.8 Handle strength 9.2 Thermal energy source classifications9.3 Touch temperature limitsAnnex B.2.5 Input testAnnex B.2.6 Operating temperature measurement conditionsAnnex B.3 Simulated abnormal operating conditions excluding subclauses B.3.6 and B.3.7Annex B.4 excluding subclause B.4.9Annex F.3.10 Test for permanence of markingsAnnex G.5.4.6 Locked-rotor overload for DC motorsAnnex T, clauses T.1, T.2, T.3, T.4, T.5, T.6Annex O Measurement of creepage distances and clearancesAnnex V Determination of accessible parts excluding test probe of Figure V.1, wedge probe of Figure V.4 and test probe of Figure V.5.G.7.6 Supply wiring space Y.5.2 Protection from moistureY.5.5. Protection from excessive dust excluding: Y.5.5.2 and Y.5.5.3Y.6.2 Impact test | 2021-12-08 | |
OFF | IEC 60950-1:2005 | Testing is limited to equipment supplied from DC mains not exceeding ES1 levels.Accepted clauses: 1.6.2: Input current, 2.1.1.1 (Fig. 2A, 2B, 2C): Access to energized parts, 2.6.3.4: Resistance of earthing conductors, 4.2.2, (3.1.5&3.1.9): 10N steady force test, 4.2.4: Steady state force 250N, 4.5: Thermal requirements Note: SGS Fimko personnel witnessing for set-up, test points and preparations required before running the test, 5.2: Electric strength, 5.3, Annex B6&B7: Abnormal conditions Note: SGS Fimko personnel witnessing for set-up, test points and preparations before running the tests. | 2019-11-12 | |
OFF | IEC 60950-1:2005/AMD1:2009 | Accepted clauses: 1.6.2: Input current, 2.1.1.1 (Fig. 2A, 2B, 2C): Access to energized parts, 2.6.3.4: Resistance of earthing conductors, 4.2.2, (3.1.5&3.1.9): 10N steady force test, 4.2.4: Steady state force 250N, 4.5: Thermal requirements Note: SGS Fimko personnel witnessing for set-up, test points and preparations required before running the test, 5.2: Electric strength, 5.3, Annex B6&B7: Abnormal conditions Note: SGS Fimko personnel witnessing for set-up, test points and preparations before running the tests. | 2019-11-12 | |
OFF | IEC 60950-1:2005/AMD2:2013 | Testing is limited to equipment supplied from DC mains not exceeding ES1 levels.Accepted clauses: 1.6.2: Input current, 2.1.1.1 (Fig. 2A, 2B, 2C): Access to energized parts, 2.6.3.4: Resistance of earthing conductors, 4.2.2, (3.1.5&3.1.9): 10N steady force test, 4.2.4: Steady state force 250N, 4.5: Thermal requirements Note: SGS Fimko personnel witnessing for set-up, test points and preparations required before running the test, 5.2: Electric strength, 5.3, Annex B6&B7: Abnormal conditions Note: SGS Fimko personnel witnessing for set-up, test points and preparations before running the tests. | 2019-11-12 | |
OFF | IEC 60950-22:2016 | Testing is limited to equipment supplied from DC mains not exceeding ES1 levels.CL 9.1: Protection from moisture (IPX5), CL 9.3: Protection from excessive dust (IP5X and IP6X), CL 10.2: Impact test | 2022-10-10 | |
OFF | IEC 60950-22:2005 | Testing is limited to equipment supplied from DC mains not exceeding ES1 levels.CL 9.1: Protection from moisture (IPX5)CL 9.3: Protection from excessive dust (IP5X and IP6X)CL 10.2: Impact test. | 2021-12-08 |