Mornsun Guangzhou Science & Technology Co., Ltd.

Address(es)
  • No. 8, Nanyun Road 4, Huangpu District, 510670 Guangzhou,
    Guangdong
    China

Website Not available
Status

MEMBER

Acceptance date 2023-02-02

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

MED

4.11 Power input5.7 Humidity preconditioning treatment7.1.3 Durability of markings8.4.2 Accessible parts including applied parts8.4.3, 8.4.4 Limitations voltage and energy8.5.4 WORKING VOLTAGE MEASUREMENTS8.6.4 Impedance and current-carrying capability8.7 Leakage currents and patient auxiliary currents8.8.3 Dielectric strength8.8.4.1 a) Ball pressure test11.1 Excessive temperatures13 Hazardous situations and fault conditions15.5.1.1 Transformers
2023-02-02

MED

4.11 Power input5.7 Humidity preconditioning treatment7.1.3 Durability of markings8.4.2 Accessible parts including applied parts8.4.3, 8.4.4 Limitations voltage and energy8.5.4 WORKING VOLTAGE MEASUREMENTS8.6.4 Impedance and current-carrying capability8.7 Leakage currents and patient auxiliary currents8.8.3 Dielectric strength8.8.4.1 a) Ball pressure test8.9.3 THERMAL CYCLING FOR SPACES FILLED WITH INSULATING COMPOUND11.1 Excessive temperatures13 Hazardous situations and fault conditions15.5.1.1 Transformers
2023-02-02

MED

4.11 Power input5.7 Humidity preconditioning treatment7.1.3 Durability of markings8.4.2 Accessible parts including applied parts8.4.3, 8.4.4 Limitations voltage and energy8.5.4 WORKING VOLTAGE MEASUREMENTS8.6.4 Impedance and current-carrying capability8.7 Leakage currents and patient auxiliary currents8.8.3 Dielectric strength8.8.4.1 a) Ball pressure test8.9.3 THERMAL CYCLING FOR SPACES FILLED WITH INSULATING COMPOUND11.1 Excessive temperatures13 Hazardous situations and fault conditions15.5.1.1 Transformers
2023-02-02