Medisafe UK LTD

Address(es)
  • Stortford Hall Industrial Park Dunmow Rd, Units 7 & 8, Bishops Stortford,
    Hertfordshire CM23 5GZ
    United Kingdom

Website Not available
Status

WITHDRAWN

Acceptance date 2021-06-17

Further information

Stage

Country

Name

1

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

MEAS

4.4 SINGLE FAULT CONDITION TESTS4.4.1 Component Abnormal4.4.2.5 Motor Abnormal Test4.4.2.8 Output Abnormal Test4.4.2.10 Cooling Abnormal Test4.4.2.11 HEATING DEVICE ABNORMAL TEST4.4.2.13 INTERLOCK ABNORMAL TEST 5.1.3 MAINS SUPPLY5.3 Durability of Markings Test6.2 DETERMINATION OF ACCESSIBLE PARTS 6.3 LIMIT VALUES FOR ACCESSIBLE PARTS 6.5.2.4 AND 6.5.2.5 Grounding Continuity Test6.7, ANNEX K Insulation Requirements6.8 DIELECTRIC VOLTAGE WITHSTAND TEST7.4 Stability 10° Test7.5.2 HANDLES AND GRIPS10.1 – 10.4 TEMPERATURE TEST11.2 Cleaning Test11.3 Spillage test11.4 Overflow test15.2 Prevention of Reactivating15.3 Interlock Reliability test
2020-11-16

MEAS

4.4 SINGLE FAULT CONDITION TESTS4.4.1 Component Abnormal4.4.2.5 Motor Abnormal Test4.4.2.8 Output Abnormal Test4.4.2.10 Cooling Abnormal Test4.4.2.11 HEATING DEVICE ABNORMAL TEST4.4.2.13 INTERLOCK ABNORMAL TEST 5.1.3 MAINS SUPPLY5.3 Durability of Markings Test6.2 DETERMINATION OF ACCESSIBLE PARTS 6.3 LIMIT VALUES FOR ACCESSIBLE PARTS 6.5.2.4 AND 6.5.2.5 Grounding Continuity Test6.7, ANNEX K Insulation Requirements6.8 DIELECTRIC VOLTAGE WITHSTAND TEST7.4 Stability 10° Test7.5.2 HANDLES AND GRIPS10.1 – 10.4 TEMPERATURE TEST11.2 Cleaning Test11.3 Spillage test11.4 Overflow test15.2 Prevention of Reactivating15.3 Interlock Reliability test
2020-11-16

MEAS

4.4.2.102 Failure, or partial failure, of the MAINS supply7.5.101 Transfer of LOADS into and out of the CHAMBER7.102 Access to the CHAMBER
2020-11-26