Integrated Power Designs, Inc.

Address(es)
  • 300 Steward Road
    Wilkes-Barre
    PA 18706
    United States of America

Website Not available
Status

MEMBER

Acceptance date 2010-07-01

Further information

Stage

Country

Name

3

Germany

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

5.4.1.3 Test for Hygroscopic Materials5.4.1.8 Determination of Working Voltage5.4.9 Electric Strength5.5.2.2 Safeguards Against Capacitor Discharge5.6.6. Resistance of the Protective Bonding System5.7.7 Summation of touch currents from external circuitsB.2.5 Input Test Single and Poly PhaseB.2.6 Normal operating conditions temperature measurementB.3.2 Simulated Abnormal operating conditions: coverings of ventilation openingsB.3.5 Simulated abnormal operating conditions: maximum load at output terminals
2023-11-13

ITAV

5.4.1.3 Test for Hygroscopic Materials5.4.1.8 Determination of Working Voltage5.4.9 Electric Strength5.5.2.2 Safeguards Against Capacitor Discharge5.6.6. Resistance of the Protective Bonding System5.7.7 Summation of touch currents from external circuitsB.2.5 Input Test Single and Poly PhaseB.2.6 Normal operating conditions temperature measurementB.3.2 Simulated Abnormal operating conditions: coverings of ventilation openingsB.3.5 Simulated abnormal operating conditions: maximum load at output terminals
2010-07-01

MED

4.7 Failure of components4.11 Power Input Test5.7 Humidity Preconditioning treatment8.4.3 Limitation of Voltage, current or Energy8.5.4 Working Voltage8.6.4A Impedance and current carrying capability earthing and potential8.8.3 Dielectric Voltage Withstand8.7.4.5 Leakage currents and Patient auxiliary currents8.7.4.6 Touch Current11.1 Excessive Temperatures in ME equipment13.2.7 Impairment of cooling15.5.1.2 Transformer short circuit test15.5.13 Transformer overload
2017-07-31

MED

4.7 Failure of components4.11 Power Input Test5.7 Humidity Preconditioning treatment8.4.3 Limitation of Voltage, current or Energy8.5.4 Working Voltage8.6.4A Impedance and current carrying capability earthing and potential8.8.3 Dielectric Voltage Withstand8.7.4.5 Leakage currents and Patient auxiliary currents8.7.4.6 Touch Current11.1 Excessive Temperatures in ME equipment13.2.7 Impairment of cooling15.5.1.2 Transformer short circuit test15.5.13 Transformer overload
2017-07-31

MED

4.7 Failure of components4.11 Power Input Test5.7 Humidity Preconditioning treatment8.4.3 Limitation of Voltage, current or Energy8.5.4 Working Voltage8.6.4A Impedance and current carrying capability earthing and potential8.8.3 Dielectric Voltage Withstand8.7.4.5 Leakage currents and Patient auxiliary currents8.7.4.6 Touch Current11.1 Excessive Temperatures in ME equipment13.2.7 Impairment of cooling15.5.1.2 Transformer short circuit test15.5.13 Transformer overload
2023-11-13

OFF

1.2.2.1 Maximum Output Voltage, Current and Voltampere Test1.6.2 Input Test: Single Phase2.1.1.7 Capacitance Discharge Test2.2.2-2.2.4 SELV Reliability Test2.6.1/ 2.6.3.4 Earthing Test2.9.1, 2.9.2, 5.2.2 Humidity Test2.10 Clearances, Creepages and Distance through Insulation Measurement2.10.2 Working Voltage Measurement Test4.5.1, 1.4.12, 1.4.13 Heating Test5.1 Annex D Touch Current Test: Single Phase5.2.2 Electric Strength Test5.3.1, 5.3.4, 5.3.6 Component Failure Test5.3.3, 5.3.6b, Annex C.1 Transformer Abnormal Operation Test5.3.6 Power Supply Output Overload and Short Circuit Test
2010-07-01

OFF

1.2.2.1 Maximum Output Voltage, Current and Voltampere Test1.6.2 Input Test: Single Phase2.1.1.7 Capacitance Discharge Test2.2.2-2.2.4 SELV Reliability Test2.6.1/ 2.6.3.4 Earthing Test2.9.1, 2.9.2, 5.2.2 Humidity Test2.10 Clearances, Creepages and Distance through Insulation Measurement2.10.2 Working Voltage Measurement Test4.5.1, 1.4.12, 1.4.13 Heating Test5.1 Annex D Touch Current Test: Single Phase5.2.2 Electric Strength Test5.3.1, 5.3.4, 5.3.6 Component Failure Test5.3.3, 5.3.6b, Annex C.1 Transformer Abnormal Operation Test5.3.6 Power Supply Output Overload and Short Circuit Test
2010-07-01

OFF

1.2.2.1 Maximum Output Voltage, Current and Voltampere Test1.6.2 Input Test: Single Phase2.1.1.7 Capacitance Discharge Test2.2.2-2.2.4 SELV Reliability Test2.6.1/ 2.6.3.4 Earthing Test2.9.1, 2.9.2, 5.2.2 Humidity Test2.10 Clearances, Creepages and Distance through Insulation Measurement2.10.2 Working Voltage Measurement Test4.5.1, 1.4.12, 1.4.13 Heating Test5.1 Annex D Touch Current Test: Single Phase5.2.2 Electric Strength Test5.3.1, 5.3.4, 5.3.6 Component Failure Test5.3.3, 5.3.6b, Annex C.1 Transformer Abnormal Operation Test5.3.6 Power Supply Output Overload and Short Circuit Test
2010-07-01