Grindmaster Corporation

Address(es)
  • 4003 Collins Lane
    KY 42045

    Louisville,
    United States of America

Website Not available
Status

WITHDRAWN

Acceptance date 2021-08-20

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

HOUS

5 – General test conditions7.14 – Permanence of Marking Test8.1, 8.1.1 - TEST PROBE B (TEST FINGER) - ACCESSIBILITY OF LIVE PARTS TEST8.1, 8.1.2 - TEST PROBE 13 (TEST PIN) - ACCESSIBILITY OF LIVE PARTS TEST8.1, 8.1.3 - TEST PROBE 41 (TEST PROBE) - ACCESSIBILITY OF LIVE PARTS TEST8.1, 8.1.4 - ACCESSIBLE PART (SELV) TEST8.2 - TEST PROBE B (TEST FINGER) [AND TEST PROBE 18 (SMALL FINGER)] - ACCESSIBILITY OF BASIC INSULATION AND METAL PARTS SEPARATED FROM LIVE PARTS BY BASIC INSULATION TEST10.1 - RATED POWER INPUT TEST10.2 - RATED CURRENT INPUT TEST11.1-11.8 – HEATING TEST13.1, 13.2 - LEAKAGE CURRENT (AT OPERATING TEMPERATURE) TEST13.1, 13.3 - ELECTRIC STRENGTH (AT OPERATING TEMPERATURE) TEST15.1 (16.3, 29), 15.1.1, 15.1.2 – IPX MOISTURE TEST (IPX1 and IPX2 only)15.2 (16.3, 29) – SPILL/OVERFLOW TEST15.3 (16) – HUMIDITY TEST16.1, 16.2 - LEAKAGE CURRENT (AFTER HUMIDITY) TEST16.1, 16.3 - ELECTRIC STRENGTH (AFTER HUMIDITY) TEST17 - OVERLOAD PROTECTION OF TRANSFORMERS AND ASSOCIATED CIRCUITS TEST19.1, 19.2, 19.13 - ABNORMAL OPERATION (UNDER VOLTAGE & RESTRICTED HEAT DISSIPATION) TEST19.1, 19.3, 19.13 – ABNORMAL OPERATION (OVER VOLTAGE & RESTRICTED HEAT DISSIPATION) TEST19.1, 19.4, 19.13 - ABNORMAL OPERATION (SHORT-CIRCUITED CONTROL) TEST19.1, 19.5, 19.13 - ABNORMAL OPERATION (TUBULAR SHEATH/EMBEDDED HEATING ELEMENT) TEST19.1, 19.6, 19.13 - ABNORMAL OPERATION (PTC HEATING ELEMENT) TEST19.1, 19.7, 19.13 - ABNORMAL OPERATION (STALLED CONDITION) TEST19.1, 19.10 – ABNORMAL OPERATION (SERIES MOTOR) TEST19.1, 19.11, 19.11.1 – ABNORMAL OPERATION (ELECTRONIC CIRCUIT - LOW-POWER CIRCUIT) TEST19.1, 19.11, 19.11.2, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – FAULT (OPENED/SHORTED/FAILURE OF) CONDITIONS) TEST19.1, 19.11, 19.11.4, 19.11.4.1 – 19.11.4.7, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – GENERAL - PART 1 OF 2) TEST19.1, 19.11, 19.11.4, 19.11.4.1, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – ELECTROSTATIC DISCHARGES – PART 2 OF 2) TEST19.1, 19.11, 19.11.4, 19.11.4.3, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – FAST TRANSIENT BURSTS – PART 2 OF 2) TEST19.1, 19.11, 19.11.4, 19.11.4.4, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – POWER SUPPLY TERMINALS – VOLTAGE SURGES – PART 2 OF 2) TEST19.1, 19.11, 19.11.4, 19.11.4.6, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – VOLTAGE DIPS AND INTERRUPTIONS – PART 2 OF 2) TEST19.1, 19.11, 19.11.4, 19.11.4.8, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – RELIABILITY OF PROGRAMMABLE COMPONENT FUNCTION) TEST19.1, 19.11, 19.12 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – MINIATURE FUSE-LINK) TEST19.1, 19.13, 19.14 - ABNORMAL OPERATION (SHORT-CIRCUITED CONTACTOR/RELAY) TEST20.1 – STABILITY TEST20.2 – ACCESSIBILITY OF DANGEROUS MOVING PARTS TEST21.1 – IMPACT – SPRING HAMMER TEST21.2 – SCRATCH TEST22.5 – CAPACITOR DISCHARGE TEST22.6 – SYRINGE (LEAKAGE OF A LIQUID) TEST22.11 – NON-DETACHABLE PARTS RELIABILITY TEST22.12 - HANDLE(S), KNOB(S), GRIP(S), AND/OR LEVER(S) AXIAL PULL TEST22.18 - INSPECTION FOR CORROSION (FOLLOWING ABNORMAL OPERATION) TEST22.47 – WATER PRESSURE TEST22.48 – BACKSIPHONAGE TEST23.3 – MOVABLE PARTS WIRE FLEXING TEST23.5 – INTERNAL WIRING INSULATION ELECTRIC STRENGTH TEST24.5 - CAPACITOR IN SERIES WITH AUXILIARY WINDING OF MOTOR RATING VERIFICATION TEST25.15, 25.16, 25.17 - FLEXIBLE CORD PUSH, PULL & TORQUE TEST26.9 - PILLAR TERMINAL (INTRODUCTION OF CONDUCTOR) TEST27.5 – EARTHING IMPEDANCE TEST28.1 – SCREW TORQUE TEST29.1 – CLEARANCE FORCE TEST29.2 – CREEPAGE DISTANCE FORCE TEST30.1 – BALL PRESSURE TEST30.2, 30.2.1, 30.2.2, 30.2.3, 30.2.3.1, 30.2.3.2 – GLOW-WIRE TEST24.1.4, Annex D (19.13 (16.3)) - MOTOR AND THERMAL MOTOR PROTECTOR COMBINATION TEST (ANNEX D)
2021-08-20

HOUS

5 – General test conditions7.14 – Permanence of Marking Test8.1, 8.1.1 - TEST PROBE B (TEST FINGER) - ACCESSIBILITY OF LIVE PARTS TEST8.1, 8.1.2 - TEST PROBE 13 (TEST PIN) - ACCESSIBILITY OF LIVE PARTS TEST8.1, 8.1.3 - TEST PROBE 41 (TEST PROBE) - ACCESSIBILITY OF LIVE PARTS TEST8.1, 8.1.4 - ACCESSIBLE PART (SELV) TEST8.2 - TEST PROBE B (TEST FINGER) [AND TEST PROBE 18 (SMALL FINGER)] - ACCESSIBILITY OF BASIC INSULATION AND METAL PARTS SEPARATED FROM LIVE PARTS BY BASIC INSULATION TEST10.1 - RATED POWER INPUT TEST10.2 - RATED CURRENT INPUT TEST11.1-11.8 – HEATING TEST13.1, 13.2 - LEAKAGE CURRENT (AT OPERATING TEMPERATURE) TEST13.1, 13.3 - ELECTRIC STRENGTH (AT OPERATING TEMPERATURE) TEST15.1 (16.3, 29), 15.1.1, 15.1.2 – IPX MOISTURE TEST (IPX1 and IPX2 only)15.2 (16.3, 29) – SPILL/OVERFLOW TEST15.3 (16) – HUMIDITY TEST16.1, 16.2 - LEAKAGE CURRENT (AFTER HUMIDITY) TEST16.1, 16.3 - ELECTRIC STRENGTH (AFTER HUMIDITY) TEST17 - OVERLOAD PROTECTION OF TRANSFORMERS AND ASSOCIATED CIRCUITS TEST19.1, 19.2, 19.13 - ABNORMAL OPERATION (UNDER VOLTAGE & RESTRICTED HEAT DISSIPATION) TEST19.1, 19.3, 19.13 – ABNORMAL OPERATION (OVER VOLTAGE & RESTRICTED HEAT DISSIPATION) TEST19.1, 19.4, 19.13 - ABNORMAL OPERATION (SHORT-CIRCUITED CONTROL) TEST19.1, 19.5, 19.13 - ABNORMAL OPERATION (TUBULAR SHEATH/EMBEDDED HEATING ELEMENT) TEST19.1, 19.6, 19.13 - ABNORMAL OPERATION (PTC HEATING ELEMENT) TEST19.1, 19.7, 19.13 - ABNORMAL OPERATION (STALLED CONDITION) TEST19.1, 19.10 – ABNORMAL OPERATION (SERIES MOTOR) TEST19.1, 19.11, 19.11.1 – ABNORMAL OPERATION (ELECTRONIC CIRCUIT - LOW-POWER CIRCUIT) TEST19.1, 19.11, 19.11.2, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – FAULT (OPENED/SHORTED/FAILURE OF) CONDITIONS) TEST19.1, 19.11, 19.11.4, 19.11.4.1 – 19.11.4.7, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – GENERAL - PART 1 OF 2) TEST19.1, 19.11, 19.11.4, 19.11.4.1, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – ELECTROSTATIC DISCHARGES – PART 2 OF 2) TEST19.1, 19.11, 19.11.4, 19.11.4.3, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – FAST TRANSIENT BURSTS – PART 2 OF 2) TEST19.1, 19.11, 19.11.4, 19.11.4.4, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – POWER SUPPLY TERMINALS – VOLTAGE SURGES – PART 2 OF 2) TEST19.1, 19.11, 19.11.4, 19.11.4.6, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – VOLTAGE DIPS AND INTERRUPTIONS – PART 2 OF 2) TEST19.1, 19.11, 19.11.4, 19.11.4.8, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – RELIABILITY OF PROGRAMMABLE COMPONENT FUNCTION) TEST19.1, 19.11, 19.12 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – MINIATURE FUSE-LINK) TEST19.1, 19.13, 19.14 - ABNORMAL OPERATION (SHORT-CIRCUITED CONTACTOR/RELAY) TEST20.1 – STABILITY TEST20.2 – ACCESSIBILITY OF DANGEROUS MOVING PARTS TEST21.1 – IMPACT – SPRING HAMMER TEST21.2 – SCRATCH TEST22.5 – CAPACITOR DISCHARGE TEST22.6 – SYRINGE (LEAKAGE OF A LIQUID) TEST22.11 – NON-DETACHABLE PARTS RELIABILITY TEST22.12 - HANDLE(S), KNOB(S), GRIP(S), AND/OR LEVER(S) AXIAL PULL TEST22.18 - INSPECTION FOR CORROSION (FOLLOWING ABNORMAL OPERATION) TEST22.47 – WATER PRESSURE TEST22.48 – BACKSIPHONAGE TEST23.3 – MOVABLE PARTS WIRE FLEXING TEST23.5 – INTERNAL WIRING INSULATION ELECTRIC STRENGTH TEST24.5 - CAPACITOR IN SERIES WITH AUXILIARY WINDING OF MOTOR RATING VERIFICATION TEST25.15, 25.16, 25.17 - FLEXIBLE CORD PUSH, PULL & TORQUE TEST26.9 - PILLAR TERMINAL (INTRODUCTION OF CONDUCTOR) TEST27.5 – EARTHING IMPEDANCE TEST28.1 – SCREW TORQUE TEST29.1 – CLEARANCE FORCE TEST29.2 – CREEPAGE DISTANCE FORCE TEST30.1 – BALL PRESSURE TEST30.2, 30.2.1, 30.2.2, 30.2.3, 30.2.3.1, 30.2.3.2 – GLOW-WIRE TEST24.1.4, Annex D (19.13 (16.3)) - MOTOR AND THERMAL MOTOR PROTECTOR COMBINATION TEST (ANNEX D)
2021-08-20

HOUS

5 – General test conditions7.14 – Permanence of Marking Test8.1, 8.1.1 - TEST PROBE B (TEST FINGER) - ACCESSIBILITY OF LIVE PARTS TEST8.1, 8.1.2 - TEST PROBE 13 (TEST PIN) - ACCESSIBILITY OF LIVE PARTS TEST8.1, 8.1.3 - TEST PROBE 41 (TEST PROBE) - ACCESSIBILITY OF LIVE PARTS TEST8.1, 8.1.4 - ACCESSIBLE PART (SELV) TEST8.2 - TEST PROBE B (TEST FINGER) [AND TEST PROBE 18 (SMALL FINGER)] - ACCESSIBILITY OF BASIC INSULATION AND METAL PARTS SEPARATED FROM LIVE PARTS BY BASIC INSULATION TEST10.1 - RATED POWER INPUT TEST10.2 - RATED CURRENT INPUT TEST11.1-11.8 – HEATING TEST13.1, 13.2 - LEAKAGE CURRENT (AT OPERATING TEMPERATURE) TEST13.1, 13.3 - ELECTRIC STRENGTH (AT OPERATING TEMPERATURE) TEST15.1 (16.3, 29), 15.1.1, 15.1.2 – IPX MOISTURE TEST (IPX1 and IPX2 only)15.2 (16.3, 29) – SPILL/OVERFLOW TEST15.3 (16) – HUMIDITY TEST16.1, 16.2 - LEAKAGE CURRENT (AFTER HUMIDITY) TEST16.1, 16.3 - ELECTRIC STRENGTH (AFTER HUMIDITY) TEST17 - OVERLOAD PROTECTION OF TRANSFORMERS AND ASSOCIATED CIRCUITS TEST19.1, 19.2, 19.13 - ABNORMAL OPERATION (UNDER VOLTAGE & RESTRICTED HEAT DISSIPATION) TEST19.1, 19.3, 19.13 – ABNORMAL OPERATION (OVER VOLTAGE & RESTRICTED HEAT DISSIPATION) TEST19.1, 19.4, 19.13 - ABNORMAL OPERATION (SHORT-CIRCUITED CONTROL) TEST19.1, 19.5, 19.13 - ABNORMAL OPERATION (TUBULAR SHEATH/EMBEDDED HEATING ELEMENT) TEST19.1, 19.6, 19.13 - ABNORMAL OPERATION (PTC HEATING ELEMENT) TEST19.1, 19.7, 19.13 - ABNORMAL OPERATION (STALLED CONDITION) TEST19.1, 19.10 – ABNORMAL OPERATION (SERIES MOTOR) TEST19.1, 19.11, 19.11.1 – ABNORMAL OPERATION (ELECTRONIC CIRCUIT - LOW-POWER CIRCUIT) TEST19.1, 19.11, 19.11.2, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – FAULT (OPENED/SHORTED/FAILURE OF) CONDITIONS) TEST19.1, 19.11, 19.11.4, 19.11.4.1 – 19.11.4.7, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – GENERAL - PART 1 OF 2) TEST19.1, 19.11, 19.11.4, 19.11.4.1, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – ELECTROSTATIC DISCHARGES – PART 2 OF 2) TEST19.1, 19.11, 19.11.4, 19.11.4.3, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – FAST TRANSIENT BURSTS – PART 2 OF 2) TEST19.1, 19.11, 19.11.4, 19.11.4.4, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – POWER SUPPLY TERMINALS – VOLTAGE SURGES – PART 2 OF 2) TEST19.1, 19.11, 19.11.4, 19.11.4.6, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – VOLTAGE DIPS AND INTERRUPTIONS – PART 2 OF 2) TEST19.1, 19.11, 19.11.4, 19.11.4.8, 19.13 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – RELIABILITY OF PROGRAMMABLE COMPONENT FUNCTION) TEST19.1, 19.11, 19.12 - ABNORMAL OPERATION (ELECTRONIC CIRCUIT – MINIATURE FUSE-LINK) TEST19.1, 19.13, 19.14 - ABNORMAL OPERATION (SHORT-CIRCUITED CONTACTOR/RELAY) TEST20.1 – STABILITY TEST20.2 – ACCESSIBILITY OF DANGEROUS MOVING PARTS TEST21.1 – IMPACT – SPRING HAMMER TEST21.2 – SCRATCH TEST22.5 – CAPACITOR DISCHARGE TEST22.6 – SYRINGE (LEAKAGE OF A LIQUID) TEST22.11 – NON-DETACHABLE PARTS RELIABILITY TEST22.12 - HANDLE(S), KNOB(S), GRIP(S), AND/OR LEVER(S) AXIAL PULL TEST22.18 - INSPECTION FOR CORROSION (FOLLOWING ABNORMAL OPERATION) TEST22.47 – WATER PRESSURE TEST22.48 – BACKSIPHONAGE TEST23.3 – MOVABLE PARTS WIRE FLEXING TEST23.5 – INTERNAL WIRING INSULATION ELECTRIC STRENGTH TEST24.5 - CAPACITOR IN SERIES WITH AUXILIARY WINDING OF MOTOR RATING VERIFICATION TEST25.15, 25.16, 25.17 - FLEXIBLE CORD PUSH, PULL & TORQUE TEST26.9 - PILLAR TERMINAL (INTRODUCTION OF CONDUCTOR) TEST27.5 – EARTHING IMPEDANCE TEST28.1 – SCREW TORQUE TEST29.1 – CLEARANCE FORCE TEST29.2 – CREEPAGE DISTANCE FORCE TEST30.1 – BALL PRESSURE TEST30.2, 30.2.1, 30.2.2, 30.2.3, 30.2.3.1, 30.2.3.2 – GLOW-WIRE TEST24.1.4, Annex D (19.13 (16.3)) - MOTOR AND THERMAL MOTOR PROTECTOR COMBINATION TEST (ANNEX D)
2021-08-20

HOUS

5 7.14 8.1, 8.1.1 -8.1, 8.1.28.1, 8.1.38.1, 8.1.48.2 10.1 10.2 11.1-11.8 13.1, 13.2 13.1, 13.3 15.1 (16.3, 29), 15.1.1, 15.1.2 15.2 (16.3, 29) 15.2.101 (16.3, 29) 15.2.102 (16.3, 29)15.2.103 (16.3, 29)15.2.104 (16.3, 29)15.2.105 (16.3, 29)15.2.106 (16.3, 29) 15.2.107 (16.3, 29) 15.2.108 (16.3, 29) 15.2.109 (16.3, 29)15.2.110 (16.3, 29) 15.2.111 (16.3, 29)15.2.112 (16.3, 29) 15.2.113 (16.3, 29) 15.3 (16) 16.1, 16.2 16.1, 16.3 17 19.1, 19.2, 19.13 19.1, 19.3, 19.13 19.1, 19.4, 19.1319.1, 19.5, 19.1319.1, 19.6, 19.1319.1, 19.7, 19.1319.1, 19.10 19.1, 19.11, 19.11.1 19.1, 19.11, 19.11.2, 19.13 19.1, 19.11, 19.11.4, 19.11.4.1 – 19.11.4.7, 19.13 19.1, 19.11, 19.11.4, 19.11.4.1, 19.13 19.1, 19.11, 19.11.4, 19.11.4.3, 19.13 19.1, 19.11, 19.11.4, 19.11.4.4, 19.13 19.1, 19.11, 19.11.4, 19.11.4.6, 19.13 19.1, 19.11, 19.11.4, 19.11.4.8, 19.13 19.1, 19.11, 19.12 19.1, 19.13, 19.14 19.101 19.102 20.1 20.221.1 21.2 22.5 22.6 22.11 22.12 22.18 22.47 22.48 23.3 23.5 24.5 25.15, 25.16, 25.17 26.9 27.5 28.1 29.1 29.230.130.2, 30.2.1, 30.2.2, 30.2.3, 30.2.3.1, 30.2.3.224.1.4, Annex D (19.13 (16.3))
2021-08-20

HOUS

5 7.14 8.1, 8.1.1 -8.1, 8.1.28.1, 8.1.38.1, 8.1.48.2 10.1 10.2 11.1-11.8 13.1, 13.2 13.1, 13.3 15.1 (16.3, 29), 15.1.1, 15.1.2 15.2 (16.3, 29) 15.2.101 (16.3, 29) 15.2.102 (16.3, 29)15.2.103 (16.3, 29)15.2.104 (16.3, 29)15.2.105 (16.3, 29)15.2.106 (16.3, 29) 15.2.107 (16.3, 29) 15.2.108 (16.3, 29) 15.2.109 (16.3, 29)15.2.110 (16.3, 29) 15.2.111 (16.3, 29)15.2.112 (16.3, 29) 15.2.113 (16.3, 29) 15.3 (16) 16.1, 16.2 16.1, 16.3 17 19.1, 19.2, 19.13 19.1, 19.3, 19.13 19.1, 19.4, 19.1319.1, 19.5, 19.1319.1, 19.6, 19.1319.1, 19.7, 19.1319.1, 19.10 19.1, 19.11, 19.11.1 19.1, 19.11, 19.11.2, 19.13 19.1, 19.11, 19.11.4, 19.11.4.1 – 19.11.4.7, 19.13 19.1, 19.11, 19.11.4, 19.11.4.1, 19.13 19.1, 19.11, 19.11.4, 19.11.4.3, 19.13 19.1, 19.11, 19.11.4, 19.11.4.4, 19.13 19.1, 19.11, 19.11.4, 19.11.4.6, 19.13 19.1, 19.11, 19.11.4, 19.11.4.8, 19.13 19.1, 19.11, 19.12 19.1, 19.13, 19.14 19.101 19.102 20.1 20.221.1 21.2 22.5 22.6 22.11 22.12 22.18 22.47 22.48 23.3 23.5 24.5 25.15, 25.16, 25.17 26.9 27.5 28.1 29.1 29.230.130.2, 30.2.1, 30.2.2, 30.2.3, 30.2.3.1, 30.2.3.224.1.4, Annex D (19.13 (16.3))
2021-08-20

HOUS

5 7.14 8.1, 8.1.1 -8.1, 8.1.28.1, 8.1.38.1, 8.1.48.2 10.1 10.2 11.1-11.8 13.1, 13.2 13.1, 13.3 15.1 (16.3, 29), 15.1.1, 15.1.2 15.2 (16.3, 29) 15.2.101 (16.3, 29) 15.2.102 (16.3, 29)15.2.103 (16.3, 29)15.2.104 (16.3, 29)15.2.105 (16.3, 29)15.2.106 (16.3, 29) 15.2.107 (16.3, 29) 15.2.108 (16.3, 29) 15.2.109 (16.3, 29)15.2.110 (16.3, 29) 15.2.111 (16.3, 29)15.2.112 (16.3, 29) 15.2.113 (16.3, 29) 15.3 (16) 16.1, 16.2 16.1, 16.3 17 19.1, 19.2, 19.13 19.1, 19.3, 19.13 19.1, 19.4, 19.1319.1, 19.5, 19.1319.1, 19.6, 19.1319.1, 19.7, 19.1319.1, 19.10 19.1, 19.11, 19.11.1 19.1, 19.11, 19.11.2, 19.13 19.1, 19.11, 19.11.4, 19.11.4.1 – 19.11.4.7, 19.13 19.1, 19.11, 19.11.4, 19.11.4.1, 19.13 19.1, 19.11, 19.11.4, 19.11.4.3, 19.13 19.1, 19.11, 19.11.4, 19.11.4.4, 19.13 19.1, 19.11, 19.11.4, 19.11.4.6, 19.13 19.1, 19.11, 19.11.4, 19.11.4.8, 19.13 19.1, 19.11, 19.12 19.1, 19.13, 19.14 19.101 19.102 20.1 20.221.1 21.2 22.5 22.6 22.11 22.12 22.18 22.47 22.48 23.3 23.5 24.5 25.15, 25.16, 25.17 26.9 27.5 28.1 29.1 29.230.130.2, 30.2.1, 30.2.2, 30.2.3, 30.2.3.1, 30.2.3.224.1.4, Annex D (19.13 (16.3))
2021-08-20