Emerson Climate Technologies ( India ) Private Limited

Address(es)
  • Karad Dhebewadi Road Karad Satara
    MH 415110
    India

Website Not available
Status

WITHDRAWN

Acceptance date 2015-09-09

Further information

Stage

Country

Name

3

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

HOUS

13.2 LEAKAGE CURRENT AT OPERATING TEMPERATURE13.3 ELECTRIC STRENGTH AT OPERATING TEMPERATURE15.3 MOISTURE RESISTANCE - HUMIDITY16.2 LEAKAGE CURRENT 16.3 ELECTRIC STRENGTH 19 ABNORMAL OPERATION22.7 CONSTRUCTION - EXCESSIVE PRESSURE
2019-12-31

HOUS

13.2 LEAKAGE CURRENT AT OPERATING TEMPERATURE13.3 ELECTRIC STRENGTH AT OPERATING TEMPERATURE15.3 MOISTURE RESISTANCE - HUMIDITY16.2 LEAKAGE CURRENT 16.3 ELECTRIC STRENGTH 19 ABNORMAL OPERATION22.7 CONSTRUCTION - EXCESSIVE PRESSURE
2019-12-31

HOUS

13.2 LEAKAGE CURRENT AT OPERATING TEMPERATURE13.3 ELECTRIC STRENGTH AT OPERATING TEMPERATURE15.3 MOISTURE RESISTANCE - HUMIDITY16.2 LEAKAGE CURRENT 16.3 ELECTRIC STRENGTH 19 ABNORMAL OPERATION22.7 CONSTRUCTION - EXCESSIVE PRESSURE
2019-12-31

HOUS

13.3 ELECTRIC STRENGTH15.3 HUMIDITY TEST16.2 LEAKAGE CURRENT 16.3 ELECTRIC STRENGTH19.101/19.104 ABNORMAL OPERATION - LOCKED-ROTOR TEMPERATURE TEST19.102/19.104 ABNORMAL OPERATION - LOCKED-ROTOR CONDITIONS - CAPACITOR OPEN/SHORT19.103/19.104 ABNORMAL OPERATION - LOCKED-ROTOR CONDITIONS - ONE PHASE DISCONNECTED19.105 ABNORMAL OPERATION - SINGLE-PHASE FAILURE22.7 CONSTRUCTION - HOUSING STRENGTHANNEX AA RUNNING OVERLOAD TESTS FOR MOTOR-COMPRESSORS CLASSIFIED AS TESTED WITH ANNEX AA
2019-12-31

HOUS

13.3 ELECTRIC STRENGTH15.3 HUMIDITY TEST16.2 LEAKAGE CURRENT 16.3 ELECTRIC STRENGTH19.101/19.104 ABNORMAL OPERATION - LOCKED-ROTOR TEMPERATURE TEST19.102/19.104 ABNORMAL OPERATION - LOCKED-ROTOR CONDITIONS - CAPACITOR OPEN/SHORT19.103/19.104 ABNORMAL OPERATION - LOCKED-ROTOR CONDITIONS - ONE PHASE DISCONNECTED19.105 ABNORMAL OPERATION - SINGLE-PHASE FAILURE22.7 CONSTRUCTION - HOUSING STRENGTHANNEX AA RUNNING OVERLOAD TESTS FOR MOTOR-COMPRESSORS CLASSIFIED AS TESTED WITH ANNEX AA
2019-12-31

HOUS

13.3 ELECTRIC STRENGTH15.3 HUMIDITY TEST16.2 LEAKAGE CURRENT 16.3 ELECTRIC STRENGTH19.101/19.104 ABNORMAL OPERATION - LOCKED-ROTOR TEMPERATURE TEST19.102/19.104 ABNORMAL OPERATION - LOCKED-ROTOR CONDITIONS - CAPACITOR OPEN/SHORT19.103/19.104 ABNORMAL OPERATION - LOCKED-ROTOR CONDITIONS - ONE PHASE DISCONNECTED19.105 ABNORMAL OPERATION - SINGLE-PHASE FAILURE22.7 CONSTRUCTION - HOUSING STRENGTHANNEX AA RUNNING OVERLOAD TESTS FOR MOTOR-COMPRESSORS CLASSIFIED AS TESTED WITH ANNEX AA
2019-12-31