EFORE Spa DEKRA-099

Address(es)
  • Via Jesina 56/A
    60022 Castelfidardo (AN)
    Italy

Website Not available
Status

MEMBER

Acceptance date 2016-12-22

Further information

Stage

Country

Name

2

Netherlands

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

HOUS

Accepted clauses:IEC 61347-2-13, IEC 61347-1Transformer heating 15Durability and legibility of marking 27.2Screw / screwless terminals 8Provisions for protective Earthing 9Protection against accidental contact with live parts 10Capacitor discharge test 10.2Moisture resistance and insulation11Electric strength 12Thermal endurance of windings 13Fault conditions 14Fault conditions 14.6Creepage distances and clearances 16Screws, current-carrying parts and connections 17Resistance to heat 18.1 18.3PCB resistance to fire 18.2Resistance to flame 18.4Resistance to tracking 18.5Resistance to corrosion 19Thermally protected lamp controlgear (Heating) B.9Thermally protected lamp controlgear (Heating) B.9.5Electronic lamp controlgear protected against overheating (Limitation of heating) C.7Lamp controlgear heating H.12IEC 62384Starting and connecting requirements 7.1Voltage and current during operation 7.2Capacitive load requirement 7.3Voltage surges during switching and operation 7.4Total circuit power 8Circuit power factor 9Supply current 10Impedance at audio-frequencies 11 (A3)Operational tests for abnormal conditions12Endurance13.113.2
2009-07-02

LITE

Accepted clauses:IEC 61347-2-13, IEC 61347-1Transformer heating 15Durability and legibility of marking 27.2Screw / screwless terminals 8Provisions for protective Earthing 9Protection against accidental contact with live parts 10Capacitor discharge test 10.2Moisture resistance and insulation11Electric strength 12Thermal endurance of windings 13Fault conditions 14Fault conditions 14.6Creepage distances and clearances 16Screws, current-carrying parts and connections 17Resistance to heat 18.1 18.3PCB resistance to fire 18.2Resistance to flame 18.4Resistance to tracking 18.5Resistance to corrosion 19Thermally protected lamp controlgear (Heating) B.9Thermally protected lamp controlgear (Heating) B.9.5Electronic lamp controlgear protected against overheating (Limitation of heating) C.7Lamp controlgear heating H.12IEC 62384Starting and connecting requirements 7.1Voltage and current during operation 7.2Capacitive load requirement 7.3Voltage surges during switching and operation 7.4Total circuit power 8Circuit power factor 9Supply current 10Impedance at audio-frequencies 11 (A3)Operational tests for abnormal conditions12Endurance13.113.2
2009-07-02

LITE

Accepted clauses:IEC 61347-2-13, IEC 61347-1Transformer heating 15Durability and legibility of marking 27.2Screw / screwless terminals 8Provisions for protective Earthing 9Protection against accidental contact with live parts 10Capacitor discharge test 10.2Moisture resistance and insulation11Electric strength 12Thermal endurance of windings 13Fault conditions 14Fault conditions 14.6Creepage distances and clearances 16Screws, current-carrying parts and connections 17Resistance to heat 18.1 18.3PCB resistance to fire 18.2Resistance to flame 18.4Resistance to tracking 18.5Resistance to corrosion 19Thermally protected lamp controlgear (Heating) B.9Thermally protected lamp controlgear (Heating) B.9.5Electronic lamp controlgear protected against overheating (Limitation of heating) C.7Lamp controlgear heating H.12IEC 62384Starting and connecting requirements 7.1Voltage and current during operation 7.2Capacitive load requirement 7.3Voltage surges during switching and operation 7.4Total circuit power 8Circuit power factor 9Supply current 10Impedance at audio-frequencies 11 (A3)Operational tests for abnormal conditions12Endurance13.113.2
2009-07-02

LITE

Accepted clauses:IEC 61347-2-13, IEC 61347-1Transformer heating 15Durability and legibility of marking 27.2Screw / screwless terminals 8Provisions for protective Earthing 9Protection against accidental contact with live parts 10Capacitor discharge test 10.2Moisture resistance and insulation11Electric strength 12Thermal endurance of windings 13Fault conditions 14Fault conditions 14.6Creepage distances and clearances 16Screws, current-carrying parts and connections 17Resistance to heat 18.1 18.3PCB resistance to fire 18.2Resistance to flame 18.4Resistance to tracking 18.5Resistance to corrosion 19Thermally protected lamp controlgear (Heating) B.9Thermally protected lamp controlgear (Heating) B.9.5Electronic lamp controlgear protected against overheating (Limitation of heating) C.7Lamp controlgear heating H.12IEC 62384Starting and connecting requirements 7.1Voltage and current during operation 7.2Capacitive load requirement 7.3Voltage surges during switching and operation 7.4Total circuit power 8Circuit power factor 9Supply current 10Impedance at audio-frequencies 11 (A3)Operational tests for abnormal conditions12Endurance13.113.2
2009-07-02

OFF

Accepted clauses:IEC 61347-2-13, IEC 61347-1Transformer heating 15Durability and legibility of marking 27.2Screw / screwless terminals 8Provisions for protective Earthing 9Protection against accidental contact with live parts 10Capacitor discharge test 10.2Moisture resistance and insulation11Electric strength 12Thermal endurance of windings 13Fault conditions 14Fault conditions 14.6Creepage distances and clearances 16Screws, current-carrying parts and connections 17Resistance to heat 18.1 18.3PCB resistance to fire 18.2Resistance to flame 18.4Resistance to tracking 18.5Resistance to corrosion 19Thermally protected lamp controlgear (Heating) B.9Thermally protected lamp controlgear (Heating) B.9.5Electronic lamp controlgear protected against overheating (Limitation of heating) C.7Lamp controlgear heating H.12IEC 62384Starting and connecting requirements 7.1Voltage and current during operation 7.2Capacitive load requirement 7.3Voltage surges during switching and operation 7.4Total circuit power 8Circuit power factor 9Supply current 10Impedance at audio-frequencies 11 (A3)Operational tests for abnormal conditions12Endurance13.113.2
2009-07-02