Cyber Power Systems Inc

Address(es)
  • 2F, No. 26, Jinzhuang Rd., Neihu Dist., Taipei city 114
    Chinese Taipei

Website Not available
Status

MEMBER

Acceptance date 2018-01-19

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, ANNEX T.4 – STEADY FORCE TEST, 100 N4.4.3.2, ANNEX T.5 – STEADY FORCE TEST, 250 N4.4.3.2, ANNEX T.3 – STEADY FORCE TEST, 30 N4.4.3.3, ANNEX T.7 – DROP TEST4.4.3.4, ANNEX T.6 – IMPACT TEST4.4.3.8, ANNEX T.8 – STRESS RELIEF TEST5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.3.2.2 - ACCESSIBILITY TO ELECTRICAL ENERGY SOURCES AND SAFEGUARDS5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 – BALL PRESSURE TEST5.4.4.6.2 – SEPARABLE THIN SHEET MATERIAL5.4.8 / HUMIDITY CONDITIONING5.4.9.1 – ELECTRIC STRENGTH TEST5.5.2.2 – CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS5.7.6 – PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS8.7 – WALL OR CEILING MOUNTING TESTSB.2.5 – INPUT TEST: SINGLE PHASEB.2.5 – INPUT TEST: POLYPHASEB.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 – TRANSFORMER OVERLOADANNEX G.7.3.2 – STRAIN RELIEF TESTQ.1 – LIMITED POWER SOURCE
2023-05-02

ITAV

5.2, 5.7 / CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.2.1.1 / ACCESSIBLE ES1 CIRCUITS SEPARATED FROM OTHER ES CIRCUITS USING COMPONENTS5.4.1.4, Annex B.2 / MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.8 / DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 / BALL PRESSURE TEST5.4.4.6.2 / SEPARABLE THIN SHEET MATERIAL5.4.8 / HUMIDITY CONDITIONING5.4.9 / ELECTRIC STRENGTH TEST5.5.2.2 / SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2(a), 5.6.6.2(b), 5.6.6.4.2(c), 5.6.6.4.2(d), 5.6.6.2(e) / RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 / PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 / PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 / POWER MEASUREMENTS6.3 / NORMAL OPERATING CONDITIONS TEMPERATURE TEST8.7 – WALL OR CEILING MOUNTING TESTSB.2.5 / INPUT TEST: SINGLE PHASEB.2.5 – INPUT TEST: POLYPHASEANNEX B.2.6 / NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 / SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4 / SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 / TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 / TRANSFORMER OVERLOADANNEX G.7.3.2 / STRAIN RELIEF TESTANNEX Q.1 / LIMITED POWER SOURCEANNEX T.2 (5.4.2.6, 5.4.3.2, G.15.3.6) / STEADY FORCE TEST, 10 NANNEX T.3 (4.4.4.2, 4.4.4.5, 5.3.2.3, G.15.3.6, U.3) / STEADY FORCE TEST, 30 NANNEX T.4 (4.4.4.2) / STEADY FORCE TEST, 100 NANNEX T.5 (4.4.4.2) / STEADY FORCE TEST, 250 NANNEX T.6 (4.4.4.4, 8.10.4) / ENCLOSURE IMPACT TESTANNEX T.7 (4.4.4.3) / DROP TESTANNEX T.8 (4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4) / STRESS RELIEF TEST
2023-05-02

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST 1.5.7.2, 1.5.7.3 RESISTOR TEST - BRIDGING DOUBLE/REINFORCED INSULATION BETWEEN AC MAINS AND OTHER CIRCUITS, ANTENNA OR COAXIAL CABLE. 1.6.2 INPUT TEST: SINGLE-PHASE 1.6.2 INPUT TEST: POLYPHASE 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS 2.1.1.7 CAPACITANCE DISCHARGE TEST 2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS 2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS 2.5 LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4 LIMITED SHORT-CIRCUIT TEST 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II 2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE TEST 2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL TESTS 2.10.5.13 TRANSFORMER AND WIRE /INSULATION ELECTRIC STRENGTH 3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF TEST 4.1 STABILITY TESTS 4.2.1 - 4.2.4 STEADY FORCE TESTS 4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST 4.2.6, 4.2.1 DROP TEST 4.2.7, 4.2.1 STRESS RELIEF TEST 4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT 4.5.1, 1.4.12, 1.4.13 HEATING TEST 4.5.5, 4.5 BALL PRESSURE TEST 5.1, ANNEX D TOUCH CURRENT TEST (SINGLEPHASE; TN/TT SYSTEM)5.1, ANNEX D TOUCH CURRENT TEST (POLYPHASE; TN/TT SYSTEM) 5.1, ANNEX D IT TOUCH CURRENT TEST (SINGLE-PHASE) 5.2.2 ELECTRIC STRENGTH TEST 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST 5.3.1, 5.3.9 ABNORMAL OPERATION TESTS 5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST
2019-01-19

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST 1.5.7.2, 1.5.7.3 RESISTOR TEST - BRIDGING DOUBLE/REINFORCED INSULATION BETWEEN AC MAINS AND OTHER CIRCUITS, ANTENNA OR COAXIAL CABLE. 1.6.2 INPUT TEST: SINGLE-PHASE 1.6.2 INPUT TEST: POLYPHASE 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS 2.1.1.7 CAPACITANCE DISCHARGE TEST 2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS 2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS 2.5 LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4 LIMITED SHORT-CIRCUIT TEST 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II 2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE TEST 2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL TESTS 2.10.5.13 TRANSFORMER AND WIRE /INSULATION ELECTRIC STRENGTH 3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF TEST 4.1 STABILITY TESTS 4.2.1 - 4.2.4 STEADY FORCE TESTS 4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST 4.2.6, 4.2.1 DROP TEST 4.2.7, 4.2.1 STRESS RELIEF TEST 4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT 4.5.1, 1.4.12, 1.4.13 HEATING TEST 4.5.5, 4.5 BALL PRESSURE TEST 5.1, ANNEX D TOUCH CURRENT TEST (SINGLEPHASE; TN/TT SYSTEM)5.1, ANNEX D TOUCH CURRENT TEST (POLYPHASE; TN/TT SYSTEM) 5.1, ANNEX D IT TOUCH CURRENT TEST (SINGLE-PHASE) 5.2.2 ELECTRIC STRENGTH TEST 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST 5.3.1, 5.3.9 ABNORMAL OPERATION TESTS 5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST
2019-01-19

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST 1.5.7.2, 1.5.7.3 RESISTOR TEST - BRIDGING DOUBLE/REINFORCED INSULATION BETWEEN AC MAINS AND OTHER CIRCUITS, ANTENNA OR COAXIAL CABLE. 1.6.2 INPUT TEST: SINGLE-PHASE 1.6.2 INPUT TEST: POLYPHASE 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS 2.1.1.7 CAPACITANCE DISCHARGE TEST 2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS 2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS 2.5 LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4 LIMITED SHORT-CIRCUIT TEST 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II 2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE TEST 2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL TESTS 2.10.5.13 TRANSFORMER AND WIRE /INSULATION ELECTRIC STRENGTH 3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF TEST 4.1 STABILITY TESTS 4.2.1 - 4.2.4 STEADY FORCE TESTS 4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST 4.2.6, 4.2.1 DROP TEST 4.2.7, 4.2.1 STRESS RELIEF TEST 4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT 4.5.1, 1.4.12, 1.4.13 HEATING TEST 4.5.5, 4.5 BALL PRESSURE TEST 5.1, ANNEX D TOUCH CURRENT TEST (SINGLEPHASE; TN/TT SYSTEM)5.1, ANNEX D TOUCH CURRENT TEST (POLYPHASE; TN/TT SYSTEM) 5.1, ANNEX D IT TOUCH CURRENT TEST (SINGLE-PHASE) 5.2.2 ELECTRIC STRENGTH TEST 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST 5.3.1, 5.3.9 ABNORMAL OPERATION TESTS 5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST
2019-01-19

OFF

4.4.7.4 to 4.4.7.5/RD, 4.4.7.8.3.2/RD to 4.4.7.9 4 5.2.2.1 WORKING VOLTAGE MEASUREMENT, CLEARANCES AND CREEPAGE DISTANCES TEST, DISTANCE THROUGH INSULATION MEASUREMENTS:4.4.4.3, 5.2.2.2, RD 5.2.2.3 INGRESS PROTECTION TEST (IP RATING):4.11.101.2 CORD ANCHORAGES AND STRAIN RELIEF4.102.7 CHARGING VOLTAGE5.2.2.4.2.2, 5.2.2.4.2.3 STEADY FORCE TEST (30 N and /or 250 N):5.2.2.4.3 IMPACT TEST:5.2.2.4.4 DROP TEST:5.2.2.4.5 STRESS RELIEF TEST:5.2.2.5 STABILITY TEST:5.2.2.6.101 WALL AND CEILING MOUNTED EQUIPMENT TEST:5.2.2.6.102, Annex GG RACK MOUNTED EQUIPMENT test:5.2.2.7 HANDLES AND MANUAL CONTROLS SECUREMENT TEST:5.2.2.101 CORD GUARD TEST5.2.3.2, 5.2.3.3 IMPULS VOLTAGE TEST, ALTERNATE TO IMPULSE VOLTAGE TEST:5.2.3.4.2 AC OR D.C. VOLTAGE TEST:5.2.3.6 PROTECTIVE IMPEDANCE TEST:4.4.5.4 PROTECTIVE IMPEDANCE DISCHARGE ENERGY TEST:5.2.3.7 TOUCH CURRENT MEASUREMENT TEST:5.2.3.8 CAPACITOR DISCHARGE TEST:5.2.3.9 LIMITED POWER SOURCE TEST:5.2.3.10 TEMPERATURE RISE TEST:5.2.3.11.2 PROTECTIVE EQUIPOTENTIAL BONDING IMPEDANCE TEST:5.2.3.101 BACKFEED PROTECTION TEST:5.2.3.102 INPUT CURRENT TEST:5.2.3.104 TRANSFORMER PROTECTION TEST:5.2.3.105 UNSYNCHRONISED LOAD TRANSFER TEST:5.2.4, RD 5.2.4 ABNORMAL OPERATION AND SIMULATED FAULTS TESTS:5.2.4.4 OUTPUT SHORT-CIRCUIT TEST:5.2.4.5 OUTPUT OVERLOAD TEST:5.2.4.6 BREAKDOWN OF COMPONENTS TEST:5.2.4.7 PWB SHORT CIRCUIT TEST:5.2.4.8 LOSS OF PHASE TEST:5.2.4.9 COOLING FAILURE TESTS:5.2.6.3.1 DRY HEAT TEST:5.2.3.6.2 DAMP HEAT TESTAnnex CC, CC.4 BATTERY OVERCHARGE TEST
2023-05-24

OFF

4.4.7.4 to 4.4.7.5/RD, 4.4.7.8.3.2/RD to 4.4.7.9 4 5.2.2.1 WORKING VOLTAGE MEASUREMENT, CLEARANCES AND CREEPAGE DISTANCES TEST, DISTANCE THROUGH INSULATION MEASUREMENTS:4.4.4.3, 5.2.2.2, RD 5.2.2.3 INGRESS PROTECTION TEST (IP RATING):4.11.101.2 CORD ANCHORAGES AND STRAIN RELIEF4.102.7 CHARGING VOLTAGE5.2.2.4.2.2, 5.2.2.4.2.3 STEADY FORCE TEST (30 N and /or 250 N):5.2.2.4.3 IMPACT TEST:5.2.2.4.4 DROP TEST:5.2.2.4.5 STRESS RELIEF TEST:5.2.2.5 STABILITY TEST:5.2.2.6.101 WALL AND CEILING MOUNTED EQUIPMENT TEST:5.2.2.6.102, Annex GG RACK MOUNTED EQUIPMENT test:5.2.2.7 HANDLES AND MANUAL CONTROLS SECUREMENT TEST:5.2.2.101 CORD GUARD TEST5.2.3.2, 5.2.3.3 IMPULS VOLTAGE TEST, ALTERNATE TO IMPULSE VOLTAGE TEST:5.2.3.4.2 AC OR D.C. VOLTAGE TEST:5.2.3.6 PROTECTIVE IMPEDANCE TEST:4.4.5.4 PROTECTIVE IMPEDANCE DISCHARGE ENERGY TEST:5.2.3.7 TOUCH CURRENT MEASUREMENT TEST:5.2.3.8 CAPACITOR DISCHARGE TEST:5.2.3.9 LIMITED POWER SOURCE TEST:5.2.3.10 TEMPERATURE RISE TEST:5.2.3.11.2 PROTECTIVE EQUIPOTENTIAL BONDING IMPEDANCE TEST:5.2.3.101 BACKFEED PROTECTION TEST:5.2.3.102 INPUT CURRENT TEST:5.2.3.104 TRANSFORMER PROTECTION TEST:5.2.3.105 UNSYNCHRONISED LOAD TRANSFER TEST:5.2.4, RD 5.2.4 ABNORMAL OPERATION AND SIMULATED FAULTS TESTS:5.2.4.4 OUTPUT SHORT-CIRCUIT TEST:5.2.4.5 OUTPUT OVERLOAD TEST:5.2.4.6 BREAKDOWN OF COMPONENTS TEST:5.2.4.7 PWB SHORT CIRCUIT TEST:5.2.4.8 LOSS OF PHASE TEST:5.2.4.9 COOLING FAILURE TESTS:5.2.6.3.1 DRY HEAT TEST:5.2.3.6.2 DAMP HEAT TESTAnnex CC, CC.4 BATTERY OVERCHARGE TEST
2023-10-24

OFF

5.2.3.2, 5.2.3.3 IMPULS VOLTAGE TEST, ALTERNATE TOIMPULSE VOLTAGE TEST:5.2.3.4.2 AC OR D.C. VOLTAGE TEST:5.2.3.6 PROTECTIVE IMPEDANCE TEST:4.4.5.4 PROTECTIVE IMPEDANCE DISCHARGE ENERGYTEST:5.2.3.7 TOUCH CURRENT MEASUREMENT TEST:5.2.3.8 CAPACITOR DISCHARGE TEST:5.2.3.9 LIMITED POWER SOURCE TEST:5.2.3.10 TEMPERATURE RISE TEST:5.2.3.11.2 PROTECTIVE EQUIPOTENTIAL BONDINGIMPEDANCE TEST:5.2.3.101 BACKFEED PROTECTION TEST:5.2.3.102 INPUT CURRENT TEST:5.2.3.104 TRANSFORMER PROTECTION TEST:5.2.3.105 UNSYNCHRONISED LOAD TRANSFER TEST:5.2.4, RD 5.2.4 ABNORMAL OPERATION AND SIMULATEDFAULTS TESTS:5.2.4.4 OUTPUT SHORT‐CIRCUIT TEST:5.2.4.5 OUTPUT OVERLOAD TEST:5.2.4.6 BREAKDOWN OF COMPONENTS TEST:Title: IECEE CB Scheme Stage 1 and 2 CTF Assessment ReportDocument Number: Form‐ULID‐000264‐1 – Rev. 8.0Note: OD‐2048‐F2‐2:2021 modified by UL for use in the UL IECEE CTF Program.Page 24 of 30 Copyright UL LLC. All rights reserved. May not be reproduced without permission. THIS DOCUMENT IS CLASSIFIED CONFIDENTIAL. It is intended forInternal Use Only and may not be disclosed to any party that is not authorized to receive it.5.2.4.7 PWB SHORT CIRCUIT TEST:5.2.4.8 LOSS OF PHASE TEST:5.2.4.9 COOLING FAILURE TESTS:5.2.6.3.1 DRY HEAT TEST:5.2.3.6.2 DAMP HEAT TESTAnnex CC, CC.4 BATTERY OVERCHARGE TEST
2023-10-24